    DEFINITION

    It is a temporary structure used to contain poureconcrete and to mould it to the required dimenssupport until it is able to support itself.

    It is a mould or box into which workable concretepoured and compacted so that it will ow and n

    to the required prole of the mould itself. It also acts as a temporary structure that suppor

    Its on weiht

    Concrete poured

    !i"e loads durin construction process

  • 7/23/2019 FORMWORK (CE152P)

    3/27

    REQUIREMENTS OF GOODFORMWORK#. It should be stron enouh to withstand all types of dead and li"e loads.

    $. It should be riidly constructed and e%ciently propped and braced both hori&on"ertically' so as to retain its shape.

    (. )he *oints in the formwork should be tiht aainst leakae of cement rout.

    +. Construction of formwork should permit remo"al of "arious parts in desired seqwithout damae to the concrete.

    ,. )he material of the formwork should be cheap' easily a"ailable and should be sreuse.

    -. )he formwork should be set accurately to the desired line and le"els should ha"surface.

    . It should be as liht as possible.

    /. )he material of the formwork should not warp or et distorted when exposed toelements.

    0. It should rest on rm base.

  • 7/23/2019 FORMWORK (CE152P)

    4/27

    TYPES OF FORMWORKS

    123456)I24 1278927K 96!! 1278927K

    CI!I4; 1278927K

    B68 1278927K

    C2!384 1278927K

  • 7/23/2019 FORMWORK (CE152P)

    5/27

    FOUNDATION FORMWORK

    Can be desined in "arious ways' normally desisocket foundations' and formwork for strip found

    )he type of desin is dictated by the si&e' mainlyheiht of the foundation formwork.

    4ormally sheetin panels with formwork bearers

    form of wall clamps are used for foundation form)ie wires as well as metal screws are used as for

    ties.

  • 7/23/2019 FORMWORK (CE152P)

    6/27

    WALL FORMWORK

    Consists of "ertical arraned upriht timbers refabricated sheetin panels may also be used

    of sheetin boards.

    Cleanin holes are to be pro"ided at the foot of tformwork.

  • 7/23/2019 FORMWORK (CE152P)

    7/27

    CEILING FORMWORK

    )he type of formwork mostly found instructures?buildins.

    )he formwork sheetin may consist of sheetin or prefabricated sheetin panels.

    )he formwork sheetin lies on squared timber fo

    bearers which are arraned on main bearers carthe forces to round timber columns.

    5iaonal board bracins are pro"ided to take uphori&ontally actin forces.

  • 7/23/2019 FORMWORK (CE152P)

    8/27

    BEAM FORMWORK

    Aas prefabricated formwork sheetin parts

  • 7/23/2019 FORMWORK (CE152P)

    9/27

    COLUMN FORMWORK

    )he sheetin of column formworks are prefabricated accordcolumn dimensions from sheetin boards connected by co"

    )he sheetin panels are placed in a foot rim which is anchosoil by steel bolts.

    )he foot rim consists of doublenailed boards.

    9hen the sheetin panels ha"e been inserted in the foot rim

    arch timbers are placed to take up the forces from the co"ethe formwork sheetin.

    6round the arch timbers' column clamps of at steel are clawith wedes or a rim of boards is arraned similar to the foo

    )he distances of the clamps are normally approximately

  • 7/23/2019 FORMWORK (CE152P)

    10/27

    86)7I6!D 3D5:

    )imber Dteel

    6luminum

    ;lass 7einforced >lastic

  • 7/23/2019 FORMWORK (CE152P)

    11/27

    TIMBER

    Advantages

    asy to handle due to its weiht

    asy to disassemble

    Eery exible

    >arts can be easily replaced

    3seful for small scale pro*ects

    !ess in cost

    Disadvantages

    6bsorbs water from concrete that result

    8oisture content of timber will a@ect the f

    It is also hard to place shorin

  • 7/23/2019 FORMWORK (CE152P)

    12/27

    STEEL

    Advantages

    Eery strin and able to carry hea"y loads

    asy to x

    3niformity in si&e and surface nish

    Can be used for a lon time

    Eery riid

    asy to dismantle

    Disadvantages

    !imited si&e

    x

    6 "ery smooth surface will be produced

    to nishin beams and columns but dis

    9eiht also adds to trans

  • 7/23/2019 FORMWORK (CE152P)

    13/27

    GLASS REINFORCED PLASTIC

    Advantages

    Eery useful in complex shapes

    asy to disassemble

    !ihtweiht

    5amaes are easily repaired

    Disdavantages

    7equires m

    4ot used world wide due to p

  • 7/23/2019 FORMWORK (CE152P)

    14/27

    BOARD AND STEEL

    Advantages

    asy to use

    7eusable for se"eral times

    1lexible

    3seable in any type of form or shape

    !ess shorin used

    Disadvantages

    In hih rise towers used polyboard

    Dystems on cuttin the board for

  • 7/23/2019 FORMWORK (CE152P)

    15/27

    Installation: 1oundation

    Dheet >iles on foundations "icinity xca"ation and arthworks

    Bored >iles

    7ebars

    1ormworks

    Dhorins

    Concrete >ourin

    $/ days curin

  • 7/23/2019 FORMWORK (CE152P)

    16/27

    Installation: Columns

    7einforced bars Dplicin

    Dtirrups

    )ies

    1ormworks

    Dide Dhorins $# days before remo"in forms

    Columns can be chamfered on a trianularshape.

  • 7/23/2019 FORMWORK (CE152P)

    17/27

    Installation: Beams

    7einforced bars Dplicin

    Dtirrups

    )ies

    1ormworks

    Dide Dhorins +/ F $ hours side forms can be remo"ed

    $/ days support shorin can be remo"ed

    Beams are usually formed with the slab.

  • 7/23/2019 FORMWORK (CE152P)

    18/27

    Installation: Dlabs

    7einforced bars Dplicin

    )ies

    1ormworks

    )able 1orms usually

    1ull Dhorins at lower le"el days before some shorin can be remo"ed

    $/ days support shorin can be remo"ed

    Dlabs are usually formed with the beams

  • 7/23/2019 FORMWORK (CE152P)

    19/27

    1ailures

    Improper strippin and shore remo"al. Inadequate bracin

    Eibration

    3nstable soil under mudsills

    Inadequate control of concrete pourin

    !ack of attention to formwork details

  • 7/23/2019 FORMWORK (CE152P)

    20/27

    >ictures

  • 7/23/2019 FORMWORK (CE152P)

    21/27

    >ictures

  • 7/23/2019 FORMWORK (CE152P)

    22/27

    >ictures

  • 7/23/2019 FORMWORK (CE152P)

    23/27

    )imber

  • 7/23/2019 FORMWORK (CE152P)

    24/27

    >ictures

  • 7/23/2019 FORMWORK (CE152P)

    25/27

    Dteel

  • 7/23/2019 FORMWORK (CE152P)

    26/27

    ;lass 7einforced >lastic

  • 7/23/2019 FORMWORK (CE152P)

    27/27

    Board G Dteel