Cresant Park
-
Upload
amit-satija -
Category
Documents
-
view
216 -
download
0
Transcript of Cresant Park
-
8/3/2019 Cresant Park
1/18
-
8/3/2019 Cresant Park
2/18
SARE Group represents a global investment fundfocused on investing in the high growth residential realestate segment in India.
SARE is an international real estate company with amarket capitalization of US$0.5bn, focused ondeveloping residential real estate in India. It is managedby a select team of leading professionals drawn from all
across the globe, with offices in London, Mumbai andNew Delhi.
SARE's mission is to become the leading verticallyintegrated real estate developer of mixed-use residentialhousing communities in India. With a strategic vision toembark on multiple projects on a pan India basis, thecompany is focused on developing large canvas projectsin Tier I city suburbs as well as in Tier II cities. Till datethe company has invested and acquired over 800 acresfor development in the following Major high growth
cities; Ghaziabad, Amritsar, Chennai, Manesar, Indoreand plans to increase land under development to 2,000acres over the next year.
SARE combines local understanding with innovativedesign, modern project management and constructionmethods to build homes offering a quality lifestyle atexcellentvalue for money.
ABOUT SARE
-
8/3/2019 Cresant Park
3/18
SAREs PRESCENCE PAN INDIA
Crescent ParC, NH-24 , Ghaziabad Crescent ParC, Sector92 , Gurgaon
Crescent ParC , Amritsar Crescent ParC , OMR Road, Chennai
-
8/3/2019 Cresant Park
4/18
-
8/3/2019 Cresant Park
5/18
About Gurgaon
Gurgaon is the sixth largest city in the Indian state of Haryana.
Gurgaon is the industrial and financial center of Haryana. An important town
in ancient Hindu mythology.
Gurgaon is one of Delhi's four major satellite cities and is part of the
National Capital Region of India.
Over the past 10 years the city has undergone rapid development and
construction. A wave of Multinational companies choose to locate their
centers in Gurgaon.
Gurgaon is regarded as the best city in India to work and one of the best
city in India to live according to a survey by Business Today magazine. The
per capita income in Gurgaon is the 3rd highest in India after Chandigarhand Mumbai
Real estate in Gurgaon has sky rocketed to levels comparable with
international cities like London.
-
8/3/2019 Cresant Park
6/18
Location Map
-
8/3/2019 Cresant Park
7/18
Crescent ParC with all facilities
Lifts
24 Hrs Security
Power Backup
Professional Facility Management Services
Proposed International High School
Proposed Primary & Nursery School
ISBT & Metro Connectivity
KMP Highway
Pollution Free Environment
Indoor Games
Gymnasium
Swimming Pool
-
8/3/2019 Cresant Park
8/18
Plan Layout 3BHK (S+4)
Size:1314 Sq. ft.
-
8/3/2019 Cresant Park
9/18
Plan Layout 3BHK+3T+S (S+4)
Size:1482 Sq. ft.
-
8/3/2019 Cresant Park
10/18
Plan Layout 4BHK + 4T (S+4)
Size:1620 Sq. ft.
-
8/3/2019 Cresant Park
11/18
Plan Layout 3BHK + 3T+S (S+14)
Size:1516 Sq. ft.
-
8/3/2019 Cresant Park
12/18
Plan Layout 4BHK + 4T+S (S+14)
Size:1850 Sq. ft.
-
8/3/2019 Cresant Park
13/18
Living / Dining Flooring Vitrified Tiles
Bedrooms Flooring Vitrified Tiles / Imported Laminated Wooden Floorings
Wall Finish Oil bound distemper in pleasing shades
Toilet Wall Finish Combination of Ceramic Tiles,Oil Bound Distemper & Mirror
Counter Polished Granite in Master Bedroom Toilet
Flooring Ceramic Tiles
Fittings
ISI standard Washbasin and WC's. Conventional Chromeplated
of standard make with shower
Kitchen
Flooring &
Dado Ceramic Tiles
Plat form Granite Counter
Wall Finish
Ceramic Tiles 2ft. Above the counter and oil bound distemper in
pleasing shades in the balance area
Other Stainless Steel sink with dra in board
Main Door Polished Hardwood Frame with Moulded Skin Door
In ternal Door Painted Hardwood Frame with Moulded Skin Door / Flush Doors
Electrical
Copper Wiring with modular switches. Circuits with MCB's of
standard make.
Power Backup Adequate Power Back Up
BHK- 3 KVA , 4BHK- 4 KVA
Security Gated Complex
INDULGENT SPECIFICATION
-
8/3/2019 Cresant Park
14/18
Price List
Flat Type Building type
BasicRate Per
(Sq.Ft)
Area
(Sq.ft)
Basic Cost
(Rs.)
Inaugural
Discount
BasicRate After
Discount
BookingAmount (Rs.)
10%(Rs.) (Rs.)
3BHKLow Rise
(S+4) 1697 1314 2229858 61758 2168100 216810
3BHK+
Study
Low Rise
(S+4) 1697 1482 2514954 69654
2445300
244530
4BHK
Low Rise
(S+4) 1697 1620 2749140 76140 2673000 267300
3BHK +
SQT
High Rise
(S+14) 1597 1516 2421052 71252 2349800 234980
4BHK +
SQT High Rise
(S+14) 1597 1859 2968823 87373 2881450 288145
-
8/3/2019 Cresant Park
15/18
Preferential Location Charges (PLC)
S + 4 Floors (Floor PLC) S + 14 Floors (Floor PLC)
First Floor Rs. 75/- Per Sq. Ft. First Floor Rs. 75/- Per Sq. Ft Second & Third Floor NIL Second Floor Rs. 50/-Per Sq. Ft Fourth Floor Rs. 150/- Per Sq. Ft. Third Floor Rs. 25/-Per Sq. Ft
PLC (Corner, Club OR Park Facing)
Single PLC Rs. 50/- Per Sq. Ft. Double PLC Rs. 75/- Per Sq. Ft.
**Allied Charges
**EDC + IDC
(External Development Charges & Infrastructure Development Charges) Rs. 375/- Per Sq. Ft
**Car Parking Covered (One parking mandatory) Rs. 175000/-
**Club Membership Rs. 65000/-
**Power Back-up (3BHK) Rs. 45000/- (3 KVA)
(4BHK) Rs. 60000/- (4 KVA) **Facilities Charges Rs. 50/- Per Sq. Ft.
** Fire Fighting Charges (only on S+14) Rs. 30/- per Sq Ft
Price List
-
8/3/2019 Cresant Park
16/18
PLAN "Construction Link Installment" Percentage
1 At the time of booking 10
2 On Commencement of Construction 10
3On Start of Plinth level of Tower in which unit is
booked10 + 25% Allied charges
4On Start ofFirst Floor Roof Slab of Tower in which
unit is booked10 + 25% Allied charges
5On Start of Second Floor Roof Slab of Tower in
which unit is booked10
6On Start of Third Floor Roof Slab of Tower in which
unit is booked10 + 25% Allied charges
7On Start ofFourth Roof Slab of Tower in which unit
is booked10
8 On Completion of Super Structure frame works 10
9 On Completion of Plumbing,Flooring & Tiles works 10+ 25% Allied charges
10 On Offer of Possession 10
Payment Plan (S+4)
-
8/3/2019 Cresant Park
17/18
Payment Plan (S+14)
Plan Construction Link Installment Percentage
1 At the time of booking 10
2 On Commencement of Construction 10
3 On Start of Plinth level of Tower in which unit is booked 7.5+ 25% Allied charges
4On Start ofFirst Floor Roof Slab of Tower in which unit is
booked 7.5 + 25% Allied charges
5
On Start of Second Floor Roof Slab of Tower in which unit isbooked 7.5
6On Start of Third Floor Roof Slab of Tower in which unit is
booked 7.5+ 25% Allied charges
7 On start of Fifth Roof Slab of Tower in which unit is booked 7.5
8 On start of Sixth Roof Slab of Tower in which unit is booked 7.5
9
On start of Seventh Roof Slab of Tower in which unit isbooked 5
10 On start of Ninth Roof Slab of Tower in which unit is booked 5
11
On start of Eleventh Roof Slab of Tower in which unit isbooked 5
12On start ofFourteen Roof Slab of Tower in which unit is
booked 5
13 On Completion of Super Structure frame works 5
14 On Completion of Plumbing,Flooring & Tiles works 5+ 25% Allied charges
15 On Offer of Possession 5
-
8/3/2019 Cresant Park
18/18
Thank You.
Queries Welcome