Download - Design File and Plot Substitution information

Transcript
Page 1: Design File and Plot Substitution information

REVISION DATES

DRAWING No.

DEPARTMENT OF TRANSPORTATIONSTATE OF GEORGIA

3/14/2013

USER:11866

W:\TransDesign\IPLOT\colortables\XeroxGREY.tbl

W:\TransDesign\IPLOT\pentables\Xerox_FS.pen

H:\GDOT\322450\DGN\Phase II (0008406)\0008406EGN2.dgn[0, 45-49, 51, 60-62] SHEET NO.PROJECT NUMBER

H:\

GD

OT

\32

24

50

\DG

N\P

hase I

I (0

00

84

06

)\0

00

84

06

EG

N1

.dg

n

H:\

GD

OT

\Safe

ty P

roje

cts

2\0

07

18

3\d

gn

\00

71

83

EG

N2

.dg

n

H:\

GD

OT

\Safe

ty P

roje

cts

2\0

07

18

3\d

gn

\00

71

83

EG

N3

.dg

n

H:\

GD

OT

\Safe

ty P

roje

cts

2\0

07

18

3\d

gn

\00

71

83

EG

N4

.dg

n

H:\

GD

OT

\Safe

ty P

roje

cts

2\0

07

18

3\d

gn

\00

71

83

EG

N5

.dg

n

TOTAL SHEETS

Design File and Plot Substitution information

OFFICE:PROGRAM DELIVERY

ESPC GENERAL NOTES

SR 96

51-002

CSNHS-0008-00(406)

12:49:58 PM

H:\

GD

OT

\Safe

ty P

roje

cts

2\0

07

18

3\d

gn

\00

71

83

EG

N6

.dg

n

H:\

GD

OT

\322450\D

GN

\Phase I

I (0

008406)\

0008406E

GN

3.d

gn

H:\

GD

OT

\322450\D

GN

\Phase I

I (0

008406)\

0008406E

GN

4.d

gn

H:\

GD

OT

\322450\D

GN

\Phase I

I (0

008406)\

0008406E

GN

5.d

gn

GPLN

STATE

GA

1/5/2009

SR 96 WIDENING

S

N

PROFESSIONAL

No. 25451

T

GIN

E

G EG

R

OE

SI

R

EER

ERD

IE

G

A

C

OTT M. DUB

O

RD .

GSWCC LEVEL II Certification #0000007807

Wash-down".

Small Business Environmental Assistance Program’s "A Guide for Ready Mix Chute/Hopper

transport the container to a proper disposal site. For additional information, refer to the Georgia

may have to wash-down into a sealable 55-gallon drum or other suitable container and then

On sites where permission or access to excavate a wash-down pit is unavailable, the Contractor

to use the area for wash-down.

vehicle being used for wash-down, (3) sufficient volume for wash-down water, and (4) permission

includes the following: (1) a location away from any storm drain, stream or river, (2) access to the

rivers. Never dispose of wash-down water down a storm drain. Establish a wash-down pit that

Wash-down plans describe procedures that prevent wash-down water from entering streams and

Project Engineer.

the elevation of the surrounding areas. Alternate wash-down plans must be approved by the

soaked into the ground, the pit shall be filled in, and the ground above it shall be graded to match

Immediately after the wash-down operations are completed and after the wash-down water has

wash-down pit. The pit shall be large enough to store all wash-down water without overtopping.

least 25 feet from any storm drain and outside of the travelled way, including shoulders, for a

of fresh concrete remains. The Contractor shall excavate a pit outside of State water buffers, at

only the discharge chute utilized in the delivery of portland cement concrete may be rinsed free

In accordance with standard Specification 107: Legal Regulations and Responsibility to the Public,

cement concrete is prohibited on this site.

The washing of ready-mix concrete drums and dump truck bodies used in the delivery of portland

READY MIX CHUTE WASH-DOWN

and Procedures.

See Special Provision 167 and other contract documents for Monitoring Sampling Methods

MONITORING SAMPLING METHODS & PROCEDURES

Water)

Receiving

(Outfall or

Type

Sampling

Stream

water

or Cold

Warm

Only)

Monitoring

(Outfall

value

B NTU

Appendix

Water)

Receiving

(For

increase

NTU

Allowable

Description

Location

monitoring

stage for

construction

Applicable

water

Receiving

Name of

Featu

re

Monit

ore

d

Feature

Alternate

or

Primary

offset)

(Sta. and

Location

(sq mi)

water

receiving

for the

Area

Drainage

SAMPLING INFORMATION OUTFALL CHARACTERISTICS

Activity

Construction

(acres)

Area

Disturbed

(rise/run)

Slope

Outfall

Average

Index

Soil Erosion

WideningRoad

WideningRoad

WideningRoad

(Acres)

Size

Site

Total

(acres)

Area

Disturbed

Upstream

WideningRoad

Primary Outfall Warm 50

1.

2.

3.

4.

Primary Outfall

Primary Outfall

Primary Outfall

Warm 50

Warm 50

Warm 50

MONITORING GENERAL NOTES:

The total project site size is 94.87 acres. Representative sampling may be utilized on this project.

shows the groups of similar outfall drainage basins.soil survey, and erosion sedimentation and pollution control plans, the Department has determined that representative sampling is valid for the duration of the project. The table belowhigh if it is greater than 5. After evaluation of these characteristics as presented in the project’s drainage area map, hydrology and hydraulic studies, construction plans, geotechnical2 acres. The average outfall slope is mild if it is equal to or less than 0.03, and steep if it is greater than 0.03. The soil erosion index is low if it is less than or equal to 5 andin cut, road widening, and maintenance/safety. The disturbed area classes are less than or equal to 1 acre, greater than 1 acre to less than 2 acres, and equal to or greater thandisturbed acreage, the average slope about the outfall, and the soil erosion index 0-10, 10 being the most erodible soil. The construction activity types are new road on fill, new roadThe individual outfall drainage basins along the project corridor have been carefully evaluated and compared on the basis of four characteristics: the type of construction activity, the

and alternate representative monitored features are identified in the table below.The increase in turbidity at the specified locations in the table below will be representative of the alternate drainage basins when similar outfall drainage basins exist. Approved primary

additional sampling is required or to replace a primary monitored feature that is no longer located within the active phase of construction.

The primary monitored features specified should be used as the initial sampling locations. An alternate monitored feature may be used if

Stream 6b

Stream 6c

Stream 6f

WideningRoad

WideningRoad

WideningRoad

Primary

Primary

Primary

Outfall

Outfall

Outfall

Warm 50

Warm 50

50Warm

Branch

D Redding

Retention PondManhole

E110 - 24" CMP

Sauls BranchFES

E65 - 42" RCP

Stream 3Catch Basin

F30 - 48" RCP

STREAM/POND BUFFER ENCROACHMENT

Stream Buffers are impacted by this project.

The Contractor is not authorized to enter into stream buffers, except as described in the table below:

50-foot buffer as measured from the wrested vegetation.

* Warm water streams have a 25-foot minimum buffer as measured from the wrested vegetation. Cold Water streams have a

BMP sheets.

** Locations are approximate, a detailed location of stream buffers and authorized work areas are shown on the individual

Location of Buffered Streams and State Waters **

Water) *

(Warm/Cold

Stream Type

Warm No

Body Type

other Water

Stream or

Number of

Name or

and Offset

Begin Station

and Offset

End Station (Yes/No)

Impacted?

Buffer

(Yes/No)

Required?

Variance

Buffer

Alignment

Stream

WarmPond 4

Stream 6c

SR 96

SR 96

1332+20, Lt 1334+50, Lt Yes Yes

1397+30, Lt 1398+45, Rt No

structure exemptions.

Proposed impacts to the buffer are exempt under both the roadway drainage structure and drainage

Roadway construction, placement of fill slopes, culvert extension and installation of erosion control measures.

A buffer variance under Criterion A will be obtained from GA EPD for the above listed activities.

Roadway construction, placement of fill slopes, and installation of erosion control measures.

94.87

94.87

94.87

94.87

94.87

94.87

94.87 3.68

5.61

4.21

0.46

0.014

0.224

0.163

0.91

2.66

0.170

0.094

0.390

0.100

8.0

8.0

8.0

8.0

8.0

8.0

8.0

0.60

0.46

0.40

0.90

1.34

0.76

0.50

Box Culvert

4 X 6

CD-7

FES

J20 - 36" RCP

Box Culvert

5 X 5

CD-10

FES

M46 - 48" RCP

1, 2 & 3

2 & 3

2 & 3

1, 2 & 3

2 & 3

2 & 3

1, 2 & 3

3.72

28’ Right

Lake Joy

Sta. 43+06

84’ Right

Sta. 1208+24

101’ Right

Sta. 1228+56

66’ Right

Sta. 1323+31

86’ Left

Sta. 1368+15

86’ Left

Sta. 1397+35

79’ Left

Sta. 1424+09

5.

6.

7.

on significant changes during the project.)

is to be replaced with site-specific information. Alternate monitored features are optional. According to the EPD, additional monitoring sites may be required depending

downstream, per monitoring event. The italicized example information in the table represents the minimum number of monitored features for representative sampling and

(Note that outfall monitoring requires one sample per monitoring event while receiving-water monitoring requires apair of samples, one sample upstream and one sample

Alternate (Similar) Outfalls

Sta 1323+31 Rt (CD-7 4X6 Box Culvert)

Sta 1191+82 Lt (E95 42" RCP Catch Basin)

Sta 14+40 Rt (M52 36" RCP FES)

Sta 1274+20 Rt (Proposed Ditch),

Sta 1191+97 Lt (E97 42" RCP Catch Basin), Sta 1228+56 Rt (F30 48" RCP Catch Basin),Sta 1336+89 Lt (H34 30" RCP FES),

Sta 1354+82 Lt (I25 30" RCP FES),

Sta 1368+15 Lt (J20 36" RCP FES),Sta 1397+35 Lt (CD-10 5X5 Box Culvert),

Sta 1419+56 Lt (M23 48" RCP FES),Sta 1424+09 Lt (M46 48" RCP FES)

Sta 1208+24 Rt (E65 42" RCP FES),Sta 1191+97 Lt (E97 42" RCP Catch Basin),

Sta 1354+82 Lt (I25 30" RCP FES),

Sta 1274+20 Rt (Proposed Ditch),

Sta 1336+89 Lt (H34 30" RCP FES),

Sta 1397+35 Lt (CD-10 5X5 Box Culvert),

Sta 1419+56 Lt (M23 48" RCP FES),Sta 1424+09 Lt (M46 48" RCP FES)

Sta 1368+15 Lt (J20 36" RCP FES),

Sta 1191+82 Lt (E95 42" RCP Catch Basin)

Sta 14+40 Rt (M52 36" RCP FES)

Sta 43+06 Rt Lake Joy Rd (E110 24" CMP MH)

Sta 1191+97 Lt (E97 42" RCP Catch Basin),Sta 1208+24 Rt (E65 42" RCP FES),Sta 1228+56 Rt (F30 48" RCP Catch Basin),

Sta 1274+20 Rt (Proposed Ditch),Sta 1336+89 Lt (H34 30" RCP FES),Sta 1354+82 Lt (I25 30" RCP FES),

Sta 1397+35 Lt (CD-10 5X5 Box Culvert),Sta 1419+56 Lt (M23 48" RCP FES),Sta 1424+09 Lt (M46 48" RCP FES)

Sta 1191+97 Lt (E97 42" RCP Catch Basin),Sta 1208+24 Rt (E65 42" RCP FES),Sta 1228+56 Rt (F30 48" RCP Catch Basin),

Sta 1274+20 Rt (Proposed Ditch),Sta 1336+89 Lt (H34 30" RCP FES),Sta 1354+82 Lt (I25 30" RCP FES),

Sta 1368+15 Lt (J20 36" RCP FES),Sta 1419+56 Lt (M23 48" RCP FES),Sta 1424+09 Lt (M46 48" RCP FES)

Sta 1191+97 Lt (E97 42" RCP Catch Basin),Sta 1208+24 Rt (E65 42" RCP FES),Sta 1228+56 Rt (F30 48" RCP Catch Basin),

Sta 1274+20 Rt (Proposed Ditch),Sta 1336+89 Lt (H34 30" RCP FES),Sta 1354+82 Lt (I25 30" RCP FES),

Sta 1368+15 Lt (J20 36" RCP FES),Sta 1397+35 Lt (CD-10 5X5 Box Culvert),Sta 1419+56 Lt (M23 48" RCP FES)

776 879