    A S S E M B LY I N S T R U C T I O N S

    SAFETY MEASURES

    Z.I. de la sablire 64270 PUYO FRANCETl. +33 5 59 65 12 19 Fax +33 5 59 65 20 05

    Ml : [email protected] - site web : www.otech.fr

    E A S Y I R R I G A T I O N MAJ 10/2001

    mailto:[email protected]://www.otech.fr/http://www.otech.fr/mailto:[email protected]
  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    2/41

    INDEX

    INDEX _______________________________________________________________________________2

    PREVENTION PLAN ___________________________________________________________________3

    SAFETY MEASURES ___________________________________________________________________4

    Building site : ________________________________________________________________________4

    Compulsory equipment : ______________________________________________________________4

    Safety measures concerning cranes : _____________________________________________________5

    Necessary equipment to assemble an ST pivot :____________________________________________6

    Maintenance vehicle _________________________________________________________________6

    Cranes ____________________________________________________________________________6

    Straps _____________________________________________________________________________6

    Spanners __________________________________________________________________________6

    Toolbox ___________________________________________________________________________6

    Electrician's tool kit__________________________________________________________________6Kit to lift the first beam _______________________________________________________________6

    ASSEMBLING THE PIVOT______________________________________________________________7

    Unloading :__________________________________________________________________________7

    Beam ST lg: 32.36 m __________________________________________________________________8

    Beam ST lg: 38.32 m __________________________________________________________________9

    Poutre ST lg: 44.00 m ________________________________________________________________10

    Beam ST lg: 50.10 m _________________________________________________________________11

    Beam ST lg: 56.20 m _________________________________________________________________12

    Beam ST lg: 62.15 m _________________________________________________________________13

    Assembling the centre element :________________________________________________________14

    Assembling the beams :_______________________________________________________________17

    Assembling the first coupling fitting : ___________________________________________________22

    Assembling the first span to the centre element : _____________________________________________23

    Assembling an intermediate tower box :_________________________________________________25

    Assembling the end boom :____________________________________________________________26Lifting procedures : stages ____________________________________________________________30

    Assembling an intermediate tower : ____________________________________________________31

    Assembling the last tower :____________________________________________________________34

    Electric wiring diagram : _____________________________________________________________35

    PIVOT ACTIVATION PROCEDURE _____________________________________________________36

    Procedures without water : _____________________________________________________________36

    Filling with water : __________________________________________________________________39

    PIVOT REPAIR PROCEDURE __________________________________________________________40

    Assembly instructions Safety measures - Pivot ST MAJ 10/20012

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    3/41

    PREVENTION PLAN

    DECREE N 92-158 of the 20th February 1992Modified by decree n 94-1159 of the 26th of December 1994

    We remind you that the USER company (UC) must present its own prevention plan to the OUTSIDEcompany (OC).The user company (or customer) is responsible for prevention and safety on the building site.

    Reminder: The manufacturer's assembly supervisors work under the user company's instructions (EE).However, the manufacturer's supervisors may impose certain safety measures (lifting means, individualprotective equipment (IPE)) on the user company.

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 3

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    4/41

    SAFETY MEASURES

    Building site :

    Signposts must be placed at the entrance to the building site, forbidding access to all "outside"unauthorised persons and reminding authorised personnel that safety helmets are compulsory.

    Compulsory equipment :

    Safety helmet Gloves

    Safety shoes (or boots)An approved safety harness for all works carried

    out 3.5 m above the ground

    DO NOT climb on the truss rods or pipes. For all operations on beams which have alreadybeen raised, you must use a ladder fixed to the frame or to the centre pipe, in order to avoidsliding during the operation. These works are often carried out on soft or muddy grounds. WARNING: The ladder may sink as these works are often carried out on soft or muddygrounds.

    You must wear gloves when handling galvanised spare parts, as there are many sharpends.

    Assembly instructions Safety measures - Pivot ST MAJ 10/20014

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    5/41

    Safety measures concerning cranes :

    Cranes and maintenance vehicles must be driven by qualified personnel who possess aspecific driving licence.

    Cranes must comply with the following conditions:

    a) Lifting mechanisms must be equipped with a "descending" speed regulator.

    b) As soon as the driver finishes, the breaks should engage automatically (the "dead man"device).

    c) Command controls should return automatically to the "stop" position in the absence of thedriver's intervention. Hydraulic jacks must be equipped with an automatic valve to preventloads falling in the event of a hose breaking.

    d) On equipment with a hydraulic mechanism (hydraulic crane) the pressure regulator,regulates the load. Nothing should be suspended from the hock when the crane is stopped.

    e) It is forbidden to transport people on lifting equipment unless this equipment is designed forthat purpose.

    f) It is forbidden to appoint drivers who are not familiar with safety measures and manoeuvresand whose ability has not been recognized by a medical examination, to drive cranes. Thisis also valid for workers directing these machines manoeuvres, by giving the driverinstructions.

    g) Mechanical cranes must be placed on a resistant surface; the machine's limits must neverbe exceeded.

    Cables, chains, natural and synthetic fibre cords must not be submitted to loads superior tothose laid down by the manufacturer, and approved by the Ministry of Employment. Theremustn't be any knots.

    An authorized body must carry out trials and verifications regularly.

    For hydraulic cranes, there is a French standard of manufacture NF E 52 088, approved byministerial order on the 22nd of April 1981 by the Secretary of State for Trade and Industry.

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 5

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    6/41

    Necessary equipment to assemble an ST pivot :

    Maintenance vehicle

    A 4 wheel drive vehicle of sufficient capacity (minimum of 2.5 tons) to lift loads of spare parts (trussrods, pipes, beams, base beams/axle trees, etc); or a tractor with a trailer which can carry 12 m pipes,to distribute the equipment on the assembly site.

    Cranes

    A hydraulic crane. Considering the span's weight (see table below), it is necessary to have a crane withsufficient capacity to lift loads to a height, under the hock 5.5 to 6 m (minimum distance between thevehicle and the load: 2.5 m). We recommend a 4-wheel drive vehicle equipped with a telescopic arm(photo1).

    Span weight (without water)ST127 (span length: 62.15m) 1768 kgST141 (span length: 62.15m) 1910 kgST168 (span length: 62.15m) 2076 kgSR193 (span length: 50.80m) 2018 kgSR245 (span length: 39.50m) 1992 kg

    Straps

    These must be approved for the loads to be lifted; it is preferable to use fibre straps, 80mm diameterminimum, equipped with steel rings at the ends, for better stability and in order to avoid damagingthe pipes when these are placed.

    Spanners

    Electric or pneumatic, depending on whether you have a generator or a compressor, with 19-22-24-27 and 30 diameter sockets (19 and 30 equipped with an extension, if possible).

    Toolbox

    One wire cutter, one electrician's knife, 1 wire stripper, and two screwdrivers: one 4x100 and one Ahammer, an adjustable spanner, a claw spanner and a ratchet wheel for the socket set.

    Electrician's tool kit

    One wire cutter, one electrician's knife, 1 wire stripper, and two screwdrivers: one 4x100 and one

    Kit to lift the first beam

    Two parts to be fixed on the tower pipe and on one of the tower legs before lifting the first beam.

    Table for tightening bolts quality 8.8 ISO 272 standard of the thread M5 M6 M8 M10 M12 M14 M16 M18 M20 M22 M24

    Tightening strength(Nm) 6.4 11.1 27 53 92 148 232 330 471 648 809

    Assembly instructions Safety measures - Pivot ST MAJ 10/20016

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    7/41

    ASSEMBLING THE PIVOTUnloading :

    Check the material delivered corresponds to your order ( pipes, number of pipes, wheels,etc)

    The beams must be assembled in line as much as possible to help adjustments when thepivot is activated (except for the first beam, see below).

    Distribute the 12 and 6 m pipes, starting from the concrete slab - which corresponds to thecentre of the pivot; the pipes for the first span must form an angle -starting from the firsttower - to comply with diagram 1. To assemble the pivot take into account the piping plan(photo 2).

    final

    ~ 45 cm

    ~250cm

    Axe d'alignementFinal alignment axis

    1re tour1st tower

    Diagram 1

    Place the coupling elements between the 12 m pipes, near the towers. The pipes should bedistributed in the area where the whole structure is to be assembled.

    Distribute the truss rods at about 1.5 m either side of the pipe.

    Distribute the first 1/2 coupling fitting - pivot.

    Distribute the corner irons (delivered in bundles corresponding to the frames).

    Distribute the elements for the centre pivot. Distribute the components for the towers along side the coupling elements: base beams,

    tower legs, knee braces, nuts and bolts, etc.

    Photo 1 Photo 2

    Photo 3 Photo 4

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 7

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    8/41

    Beam ST lg: 32.36 m

    0.60 m

    1.50 m 3.00 m 3.00 m 1.50 m

    4.78 m 1.20 m 4.78 m

    11.95 m

    0.77 m

    0.65 m

    1.05 m

    1.25 m

    1.81 m

    1.10 m

    1.87 m

    1.10 m

    1.49 m 3.00 m

    5.98 m

    0.60 m 4.78 m

    e

    ot

    te avant porte faux

    1/2 accouplement dpart pivFirst coupling fitting - pivot

    1/2 accouplement dpart travFirst coupling fitting - span

    1/2 accouplement tourFirst coupling fitting - tower

    tEnd boom insert

    Assembly instructions Safety measures - Pivot ST MAJ 10/20018

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    9/41

    Beam ST lg: 38.32 m

    0.60 m

    1.50 m 3.00 m 3.00 m 1.50 m

    4.78 m 1.20 m 4.78 m

    11.95 m

    0.77 m

    0.65 m

    1.05 m

    1.25 m

    1.81 m

    1.10 m

    1.87 m

    1.10 m

    e

    ot

    te avant porte faux

    1/2 accouplement dpart pivFirst coupling fitting - pivot

    1/2 accouplement dpart travFirst coupling fitting - span

    1/2 accouplement tour coupling fitting - tower

    tEnd boom insert

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 9

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    10/41

    Poutre ST lg: 44.00 m

    0.60 m

    1.50 m 3.00 m 3.00 m 1.50 m

    4.78 m 1.20 m 4.78 m

    11.95 m

    0.77 m

    0.65 m

    1.05 m

    1.25 m

    1.81 m

    1.10 m

    1.87 m

    1.10 m

    1.49 m 3.00 m

    5.98 m

    0.60 m 4.78 m

    e

    t

    te avant porte faux

    1/2 accouplement dpart pivoFirst coupling fitting - pivot

    1/2 accouplement dpart travFirst coupling fitting - span

    1/2 accouplement tourFirst coupling fitting - tower

    tEnd boom insert

    Assembly instructions Safety measures - Pivot ST MAJ 10/200110

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    11/41

    Beam ST lg: 50.10 m

    0.60 m

    1.50 m 3.00 m 3.00 m 1.50 m

    4.78 m 1.20 m 4.78 m

    11.95 m

    0.77 m

    0.65 m

    1.05 m

    1.25 m

    1.81 m

    1.10 m

    1.87 m

    1.10 m

    e

    t

    te avant porte faux

    1/2 accouplement dpart pivoFirst coupling fitting - pivot

    1/2 accouplement dpart travFirst coupling fitting - span

    1/2 accouplement tour coupling fitting - tower

    tEnd boom insert

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 11

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    12/41

    Beam ST lg: 56.20 m

    0.60 m

    1.50 m 3.00 m 3.00 m 1.50 m

    4.78 m 1.20 m 4.78 m

    11.95 m

    0.77 m

    0.65 m

    1.05 m

    1.25 m

    1.81 m

    1.10 m

    1.87 m

    1.10 m

    1.49 m 3.00 m

    5.98 m

    0.60 m 4.78 m

    e

    t

    te avant porte faux

    1/2 accouplement dpart pivoFirst coupling fitting - pivot

    1/2 accouplement dpart travFirst coupling fitting - span

    1/2 accouplement tour coupling fitting - tower

    tEnd boom insert

    Assembly instructions Safety measures - Pivot ST MAJ 10/200112

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    13/41

    Beam ST lg: 62.15 m

    0.60 m

    1.50 m 3.00 m 3.00 m 1.50 m

    4.78 m 1.20 m 4.78 m

    11.95 m

    0.77 m

    0.65 m

    1.05 m

    1.25 m

    1.81 m

    1.10 m

    1.87 m

    1.10 m

    e

    ot

    te avant porte faux

    1/2 accouplement dpart pivFirst coupling fitting - pivot

    1/2 accouplement dpart travFirst coupling fitting - span

    1/2 accouplement tour coupling fitting - tower

    tEnd boom insert

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 13

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    14/41

    Assembling the centre element :

    The centre element is assembled horizontally. Assemble two tower legs with the insert - husk set(photo 5), then assemble the steps (corner irons) between these two tower legs. Repeat thisoperation for each tower leg (photo 6), always horizontally.

    Lift the whole with a crane using a strap round the pivot elbow (photo 7). When the centre element issuspended, fix the feet to the ends of the tower legs.

    Place the centre element on its concrete slab.

    On the ground, assemble the pivot connectors to the water feed pipe (photo 8). It is VERYIMPORTANT to clean the joint opening.

    Place the water feed pipe on the centre element, without forgetting to fit the drain pipe support inthe lower packing box first (photo 9); then lift the whole into the upper elbow packing box.

    ST127

    ST168

    Fix the two connectors to the husk (photo 11).

    Fix the two lower corner iron support rods of the water feed pipe between this pipe and the twocentre element tower legs (photo 12). CAREFUL: The position you choose for these corner ironsdepends on how the lower elbow is oriented, its horizontal axis must go through the V.

    Assemble the packing box without forgetting the braid (photos 13 to 16).

    Photo 5 Photo 6

    Photo 7 Photo 8

    Assembly instructions Safety measures - Pivot ST MAJ 10/200114

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    15/41

    Photo 9 Photo 10

    Photo 11 Photo 12

    ST168

    ST127

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 15

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    16/41

    Photo 13 Photo 14

    Photo 15 Photo 16

    Assembly instructions Safety measures - Pivot ST MAJ 10/200116

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    17/41

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 17

    Assembling the beams :

    Once the pipes and span connectors are in place, loosen the plugs according to the piping plan.

    Assemble the first 1/2 coupling fitting -pivot- with the first 12 m pipe, without forgetting the sealingjoint.

    With a strap lift the 12 m pipe in order to assemble the two corner irons of the first frame (photo 18).CAREFUL how you assemble the corner irons (diagram below); see assembly details (photos 21

    and 22).

    Go back to the first coupling fitting and fix the truss rod and its extension (photo 20)

    Strap another pipe in order to lift and present it facing the first pipe's flange (photos 23 to 25). Insertthe joint (photo 26) and then bolt the flanges together (photo 27), tightening them with the pneumaticspanner when the holes are in line.

    Assemble the frame as explained above (photos 28 to 30).

    Repeat this same procedure for all frames without forgetting the knee braces (photo 32).

    Assemble the tower pipe, tighten the flange.

    Fix the last truss rod to its extension, then the extension rod to the tower pipe.

    CHECK ALL THE BOLTS ARE TIGHTENEDCHECK THE FLANGES ARE WELL POSITIONED

    BADLY TIGHTENED BOLTS = SPAN MIGHT COLLAPSE

    WRONG RIGHT

    Lifting points

    WARNING :Reference hole only for inside

    angles (in green on the diagram)

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    18/41

    Photo 17

    Photo 18

    Photo 19 Photo 20

    Photo 21 Photo 22

    Assembly instructions Safety measures - Pivot ST MAJ 10/200118

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    19/41

    Photo 23 Photo 24

    Photo 25 Photo 26

    Photo 27 Photo 28

    Photo 29 Photo 30

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 19

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    20/41

    Photo 31 Photo 32

    Photo 33 Photo 34

    Photo 35 Photo 36

    Attach the electric cables to the pipe with metallic clips, every 1.5 m (photos 37 to 40).

    Allow extra cable for beyond the tower box.

    Assemble the pipes according to the plan (in the case of a piping plan with drop pipes, onlyassemble the 180 elbows).

    Assembly instructions Safety measures - Pivot ST MAJ 10/200120

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    21/41

    Photo 37 Photo 38

    Photo 39 Photo 40

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 21

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    22/41

    Assembling the first coupling fitting :

    Assemble the coupling ring carefully (photo 42).

    Tighten the M24 bolts and loosen 1/2 turn in order to allow the ring to turn.

    Cover the end of the pipe with liquid soap.

    Put the connector -equipped with joints- into the end of the tower pipe.

    Place the drain joint in the first 1/2 coupling fitting -span- (photo 41) - small on the outside of thepipe.

    Assemble the 1/2 coupling fitting with the ring (which is already assembled) (photo 45).

    Put the connector in place and insert the M 16 locking screw (photo 44).

    Photo 41Photo 42

    Photo 43 Photo 44

    Photo 45

    Assembly instructions Safety measures - Pivot ST MAJ 10/200122

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    23/41

    Assembling the first span to the centre element :

    You must assemble the first pipe of the second span and its first frame in order to stabilize the wholeduring coupling operations (photos 46 to 49).

    Photo 46 Photo 47

    Photo 48 Photo 49

    Before lifting the first beam, it is necessary to take the tools up the tower pipe, as in diagram 2.

    Schma 2

    Put the connector into the first 1/2 coupling fitting - pivot.

    Strap the beam at its end (photos 50 and 51).

    Start the lifting operation (photos 51 and 52).

    Present the first 1/2 coupling fitting pivot - facing the holes of the upper elbow; guide the operation

    from the top of the centre element (photo 53).

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 23

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    24/41

    Place the screws, washers, angle braces, according to diagram 3.

    Tighten the M24 bolts (photo 54).

    Slide the first connector into its final position.

    Photo 50 Photo 51

    Photo 52 Photo 53

    Photo 54 Schma 3

    Once the first beam is coupled to the centre element, continue assembling the following beams until the lasttower. The procedure is the same as for the first beam.

    Assembly instructions Safety measures - Pivot ST MAJ 10/200124

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    25/41

    Assembling an intermediate tower box :

    Fix the alignment corner iron (photos 56 and 57).

    Fix the tower box support leg (photo 58).

    Assemble the tower box (photo 59).

    Fix the non-wire alignment feature to the corner iron, without linking it to the box joint until the whole

    is lifted (photo 60).

    Photo 55 Photo 56

    Photo 57 Photo 58

    Photo 59 Photo 60

    Once all the intermediate boxes are assembled, assemble the final box. Wire all the tower boxes (photo 61).

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 25

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    26/41

    Assembling the end boom :

    The assembly procedure is the same for 12 to 30 m end booms.

    Find and unreel the cables correctly (inscription engraved on the end) (photo 64).

    Fix the back and front cables to the end boom tower legs (photos 65 and 66).

    Once all the cables are in place, lift the end boom tower legs and place two screws per corner iron

    (photos 69 to 71) without tightening them. Place the horizontal corner iron (photos 72 and 73).

    Place the first 12 m end boom pipe and fix it by its flange (photos 74 to 76).

    Keep the pipe lifted for the next operations.

    Install the back cables (2 or 4 depending on the length of the end boom) (photos 79 and 80).

    Screw the nut half way along the stud.

    Install the front cables.

    Screw the nut half way along the stud (photo 77).

    Slowly lower the 12 m pipe until the cables are taut.

    Tighten the bolts on the end boom tower legs.

    Assembly instructions Safety measures - Pivot ST MAJ 10/200126

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    27/41

    Photo 61 Photo 62

    Photo 63 Photo 64

    Photo 65 Photo 66

    Photo 67

    Photo 68

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 27

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    28/41

    Photo 69

    Photo 70

    Photo 71 Photo 72

    Photo 73 Photo 74

    Photo 75 Photo 76

    Assembly instructions Safety measures - Pivot ST MAJ 10/200128

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    29/41

    Photo 77 Photo 78

    Photo 79 Photo 80

    ASSEMBLING (and adjusting the gun)

    20

    10

    170

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 29

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    30/41

    Lifting procedures : stages

    1 Configuration of the pivot after assembly of the end boom (example of a pivot with 5 spans + end boom).

    1 2 3 4 5

    2 Assemble and lift the towers one by one from the first to the last except for the penultimate.

    1 2 3 4 5

    3 Assemble and lift the last tower using the end boom stabilizing cables to stabilize it during this operation.

    1 2 3 4 5

    4 Assemble and lift the penultimate tower.

    1 2 3 4 5

    Tower lifting point.

    Assembly instructions Safety measures - Pivot ST MAJ 10/200130

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    31/41

    Assembling an intermediate tower :

    Place the 4 tower legs on the ground, along the beam and fix them with one bolt (photo 82).

    Assemble the corner irons (rungs) to 2 tower legs with one bolt (photo 82).

    Strap the beam round the tower pipe and start lifting slowly, the tower legs fall into placeautomatically (vertical position) (photos 83 and 84).

    Place and fix the tower base without tightening the bolts (photos 85 and 86). Working upwards, place the rungs with a second bolt (photo 87).

    Do not forget to lift the knee brace at the bolt.

    Insert the rest of the nuts and bolts on the tower (without tightening them).

    Assemble the drive train (photos 88 to 91).

    Lift the whole a little more.

    Place the wheels on the wheel gearbox and tighten the nuts (photos 92 and 93).

    Carefully, lower the span until it touches the wheels, the tower base spins on its axis to fall intoplace.

    Lift the span slightly in order to release the pressure on the tower base bolts (CAREFUL NOT TOLIFT the wheels off the ground).

    Finally, go up the tower and from the top down, tighten all the nuts and bolts.

    Release lifting pressure, move on to the next tower.

    Photo 81 Photo 82

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 31

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    32/41

    Photo 83

    Photo 84

    Photo 85 Photo 86

    Photo 87 Photo 88

    Assembly instructions Safety measures - Pivot ST MAJ 10/200132

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    33/41

    Photo 89 Photo 90

    Photo 91 Photo 92

    DRIVE LINE COUPLING ASSEMBLY

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 33

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    34/41

    Assembling the last tower :

    Proceed in the same way as for the intermediate towers, paying attention to the triangle formed bythe end boom tower legs (photos 94 to 96).

    During the lifting operation, two people must stabilize the end boom with stabilizing cables (photo96).

    When assembling the tower base, do not forget the stabilizing cable support leg (photo 97).

    Photo 93

    Photo 94

    Photo 95 Photo 96

    WIRE ALL THE MOTORS IN THE TOWER BOXES

    Assembly instructions Safety measures - Pivot ST MAJ 10/200134

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    35/41

    Notice de montage Consignes de scurit pour pivot ST MAJ 10/2001 35

    Schma de raccordement lectrique :

    40

    17

    35

    T

    41

    T

    33

    OPTION1

    COMMUN

    DERN.TOUR

    OPTION3

    TERRE

    OPTION2

    TERRE

    SECURITE

    L1

    33

    7

    33

    37

    40

    L3

    25

    9

    T

    T

    26

    39

    T

    L2

    35

    8

    25

    38

    41

    T

    26

    33

    36

    35

    17

    18

    17

    40

    T

    PH1

    SECURITE

    PH1

    OPTION1

    SECURITE

    ASSERVSP

    OPTION1

    PH3

    M.AVANT

    PH3

    TERRE

    TERRE

    M.ARRIERE

    PRES.EAU

    TERRE

    PH2

    DERNTOUR

    PH2

    OPTION2

    M.AVANT

    ASSERVSP

    OPTION2

    TERRE

    M.ARRIERE

    SECURITE

    MANOSTAT

    DERNTOUR

    COMMUN

    MANOSTAT

    COMMUN

    PRES.EAU

    TERRE

    6

    3

    11

    7

    212

    8

    9

    54 1

    0

    2

    7

    3

    8

    4

    5

    1

    6

    1

    43

    44

    Bornierarmoire

    Coffretintermdiaire

    Coffretderniretour

    Collecteur

    1

    B

    B=Bleu

    M=

    Marron

    N

    =Noir

    VJ=Vert-Jaune

    B

    B

    M

    M

    M

    N

    N

    N

    VJ

    VJ

    VJ

    7

    6

    8

    5

    4

    3

    2

    2

    3

    4

    7

    5

    61

    2

    5

    6

    3

    4

    7

    4

    4

    3

    3

    ...verstourssuivantessauftourd'extrmit...

    ...libre... ..

    .libre...

    VJ

    VJ

    H

    G

    F

    E

    D

    C

    B

    A

    1234

    A

    B

    C

    D

    E

    F

    G

    H

    4 3 2 1

    Echelle

    BC

    N

    6/10/1999

    Le

    1/~

    OTECH

    S.A.-Usin

    e-64270PUYOO

    Tl:+33559651219

    -Fax:+

    33559652005

    GROUPE

    IRRIMEC

    Otech

    1

    2

    5

    6

    7

    VJ

    B

    M

    N

    1

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    36/41

    PIVOT ACTIVATION PROCEDURE

    Procedures without water :

    Reminder : Electric wiring and start-up must be carried out by qualified personnel.

    Check all the gear motors are connected in the same way (by the colour) in all the

    tower boxes. Also check the cutout switches work ( I = engaged). Adjust all the intermediate tower box connection rods -set stud in such a way that the cam engages

    the micro-control switch (photo 98).

    Photo 97

    In the main switchboard, check all the circuit breakers work (F1/F2/F3/F4) and that there arecartridge fuses. Engage the differential switch (S1) then close the double door.

    F3 Q1F2 F4

    S1

    F1

    Assembly instructions Safety measures - Pivot ST MAJ 10/200136

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    37/41

    irritec

    Frontal

    Scurit

    traves

    Scurit

    traves

    Scurit

    Appareil

    AvantAuto

    Arrire

    Marcheavec eau

    ArrtMarchesans eau

    Doseur Cyclique

    Pompe

    En

    Pression

    MarcheAvant

    MarcheArrire

    Marche canon

    Marche dernire tour

    irritec

    Frontal

    11

    2

    3

    3

    Model A Model B

    Engage the outside handle on the cutout fuse switch (picture 1).

    Check the voltage between the phases (400v) with the fuse switch (picture 2) and the voltmeterswitch (switchboard B) or with a measuring device.

    Set the WITH orWITHOUT WATER switch to WITHOUTWATER.

    Set the FORWARDS/AUTO/REVERSE switch to FORWARDS.

    Set the cyclic measuring device (picture 3) at 50%.

    Start the pivot by putting the ON/OFF switch to ON.

    The pivot should move anticlockwise. If it does not, stop the pivot immediately and reverse the 2

    phases on terminals 7 and 8. The pivot should then work properly. Check all the intermediate tower box safety devices work by removing the ball joint. Also check the

    last tower box by releasing the main switch of the last tower (during each operation the pivot shouldstop in SAFETY position).

    Check the last tower safety device (option) works by manually operating the 2 END OF RUN switchesin both ways, in order to check both rotation directions.

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 37

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    38/41

    Procedure to check the automatic reverse rotation system works properly :

    1. Set the FORWARD/AUTO/REVERSE switch to AUTO. The END OF RUN switch should reverse thepivot direction. Carry out a rotation in both directions, by manually operating the 2 END OFRUN switches.

    2. Set FORWARD/AUTO/REVERSE switch to FORWARD. When you manually operate the END OFRUN switch, the pivot should stop but not reverse run. If you release the END OF RUN switch,the pivot restarts and moves forwards.

    3. Set FORWARD/AUTO/REVERSE switch to REVERSE. When you manually operate the END OFRUN switch, the pivot should stop but should not change direction. If you release the END OFRUN switch, the pivot restarts and continues run.

    The pivot must not work unattended before completing a full rotation, in order to check the rotationand safety stops have been set up according to the instructions below.

    Angle de scurit

    ~10cm

    ~10cm ~

    10cm

    Angle de scurit ~Safety angle ~ 10 10

    co

    plaque

    La roulette doit venir en

    ntact au centre de la

    The wheel should touch the

    middle of the plate

    Safety angle

    Assembly instructions Safety measures - Pivot ST MAJ 10/200138

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    39/41

    Filling with water :

    Check the sand box situated at the end of the pivot has been removed.

    Shut the mini-valve on the centre element.

    Fill with water, the pivot stopped, and allow the water to drain off through the sand box "exit" forabout 10 minutes, this will prevent the sprinklers from blocking up with impurities from the different

    pipes. Stop the water and let the pivot empty completely.

    Close the sand box.

    Set the with WATER/WITHOUT WATER switch to WITH WATER; set the FORWARD/AUTO/REVERSE switchto the direction required; and set the ON/OFF switch to ON.

    The pivot does not start and the safety pilot light is on.

    Re-fill with water.

    Adjust the water pressure at the entrance of the pivot according to the piping plan.

    Using the screw located on the upper part, set the pressure switch so the machine starts at 1 barbelow working pressure.

    Adjust the working speed control switch according to the chart and according to the quantity of waterrequired.

    Check all the sprinklers work properly.

    Check there are no leaks, tighten the flange bolts if necessary.

    Assembly instructions Safety measures - Pivot ST MAJ 10/2001 39

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    40/41

  • 8/14/2019 NOTICE DE MONTAGE ST (anglais)

    41/41

    FAULT REPAIR CAUSE

    Fuse failure in the QIcutout switch.

    - Short-circuit on the power circuit betweenwires 7-8 and 9.- Using an ohmmeter, check the current, thereshould not be any.

    - Short-circuit in the commutator.-Short-circuit in the tower box-connectingterminal.

    1.Using an ohmmeter, check the transformer's1A.Am primary (380v) protection fuses.

    - If fuses are faulty, replace them withidentical ones.- If fault continues, failure comes from ashort-circuit in the transformer.- This often results from over voltage.- Replace transformer.

    2. Using an ohmmeter, check thetransformer's 4A Gg secondary (115v)protection fuses.

    - Short-circuit in the 115V control:- in the commutator- in a valve- in the pressure switch or its cable.

    - These fuses must be replaced withidentical fuses.Large diameter fuses do not increaseprotection

    No control circuit.Voltage is correct butnothing works..

    3.The fuses are correct but there is no circuitcontrol.

    Using a voltmeter:- Check voltage on the transformer's primary(between wires 05 and 06). Voltage shouldbe 115v.- If the voltage in the primary is correct but

    there is no voltage on the secondary, replacethe transformer; first check the secondaryprotection fuses are the right diameter (4AGg).

    Replace HS transformer.