Liaison Report JEDEC JC-61
description
Transcript of Liaison Report JEDEC JC-61
July 2002
Benno Ritter, PhilipsSlide 1
doc.: IEEE 802.15-02/405r0
Submission
Liaison Report JEDEC JC-61
Benno RitterPhilips
September 13th 2002
July 2002
Benno Ritter, PhilipsSlide 2
doc.: IEEE 802.15-02/405r0
Submission
Status• Currently 42 member companies with a total of >120 participating
members and alternates
• Last meeting in Sunnyvale, CA on September 5th and 6th – 22 participating companies
• Next meeting in July 7th – 8th in Koloa, HI before the IEEE meeting (same hotel) www.jedec.org
• Documents finished:– Procedure and Operating Rules– MRD for both interface– TRD for both interfaces– Welcome Information Package
July 2002
Benno Ritter, PhilipsSlide 3
doc.: IEEE 802.15-02/405r0
Submission
Current Proposals
• RF – BB Interface– Philips (PHY of Serial ATA)– Channel Technologies (6 line digital differential)– nVidea (8 line digital differential)
• MAC – PHY Interface– Channel Technologies (6 line digital differential)
July 2002
Benno Ritter, PhilipsSlide 4
doc.: IEEE 802.15-02/405r0
Submission
Characteristics• All proposals
– High speed serial data– Differential ( for >50cm distance )– Data rates in the order of 1.2 – 1.6 Gbps– Extension to higher data rates by adding lines– Protocols are very similar
• Differences– Embedded versus separate clock (additional lines)– 3 of PLLs– Reusability of existing IP blocks– Clock frequency– Necessary logic for data packetizing/de-packetizing
July 2002
Benno Ritter, PhilipsSlide 5
doc.: IEEE 802.15-02/405r0
Submission
Next Steps
• Discuss system implications of embedded versus non-embedded clock
• Continue to foster merger opportunities• Clarification of IP situation for proposals• Ballot on clocking scheme Leads to baseline proposal before the
November meeting
July 2002
Benno Ritter, PhilipsSlide 6
doc.: IEEE 802.15-02/405r0
Submission
Public Call for Proposals
Approve MRD & TRD
Review Proposals
Select Idea by Vote
Match Idea to MRD/TRD
Create Written Standard
Approve Standard
Q2’02 Q3’02 Q4’02
Proposed Timeline Q1’03