· csc-0099-brochure-230x360-r26_ok.indd 62 04/04/2018 21:47 csc-0099-brochure client: 3 aces...
Transcript of · csc-0099-brochure-230x360-r26_ok.indd 62 04/04/2018 21:47 csc-0099-brochure client: 3 aces...
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
1 - & 2 - B E D R O O M
CSC-0099-Brochure-230x360-r26_ok.indd 50 04/04/2018 21:46 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
1 - B E D R O O M T Y P E A 1
45 sq m / 484 sq ft
#02-14 to #35-14
DINING
FDB/ST
MASTERBATH
MASTERBEDROOM
LIVINGBALCONY
AC LEDGE
W
KITCHEN
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 51 04/04/2018 21:46
www.MySingaporeLaunch.com
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
1 - B E D R O O M + S T U D Y T Y P E A 2 s
53 sq m / 570 sq ft
#02-12 to #36-12
DINING
BALCONY
AC LEDGE
LIVING
MASTERBEDROOM
MASTERBATH
STUDY
KITCHEN
DB/S
TF
W
APPLICABLE TO#36-12
BALCONY
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 52 04/04/2018 21:46 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
2 - B E D R O O M T Y P E B 1
66 sq m / 710 sq ft
#02-11 to #36-11
F
W
DB/S
T
AC LEDGE
BALCONY
KITCHEN
LIVING
BATH 2MASTER
BATH
MASTERBEDROOM
BEDROOM 2
DINING
APPLICABLE TO#36-11
BALCONY
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 53 04/04/2018 21:46
www.MySingaporeLaunch.com
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
DB/S
T
KITCHEN
DINING MASTERBATH
BATH 2
MASTERBEDROOM
BEDROOM 2
AC LEDGE
LIVING
W
F
BALCONY
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
2 - B E D R O O M T Y P E B 2
69 sq m / 743 sq ft
#02-08 to #35-08
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 54 04/04/2018 21:47 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
2 - B E D R O O M T Y P E B 3
68 sq m / 732 sq ft
#02-07 to #35-07
BEDROOM 2
MASTERBEDROOM
MASTERBATH
BATH 2
KITCHEN
DINING
AC LEDGE BALCONY
LIVING
DB/S
T
W
F
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 55 04/04/2018 21:47
www.MySingaporeLaunch.com
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
FULL HEIGHTSCREENING
DINING
AC LEDGE
MASTERBATHBATH 2
MASTERBEDROOM
BEDROOM 2AC LEDGE
BALCONY
LIVING
KITCHENW
DB/S
T
F
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
2 - B E D R O O M T Y P E B 4
69 sq m / 743 sq ft
#02-13 to #35-13
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 56 04/04/2018 21:47 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
KITCHENMASTERBATH
BATH 2
MASTERBEDROOM
STUDY
BEDROOM 2
DINING
LIVING
BALCONY
DB/S
T
W F
AC LEDGE
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
2 - B E D R O O M + S T U D Y T Y P E B 5 s
76 sq m / 818 sq ft
#02-04 to #35-04
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 57 04/04/2018 21:47
www.MySingaporeLaunch.com
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
3 - B E D R O O M
CSC-0099-Brochure-230x360-r26_ok.indd 58 04/04/2018 21:47 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
BALCONYAC LEDGE
LIVING
W F DB/S
T
DINING
KITCHENBATH 2
BEDROOM 3BEDROOM 2
MASTERBEDROOM
MASTERBATH
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
3 - B E D R O O M E X E C U T I V E T Y P E C 1
84 sq m / 904 sq ft
#02-01 to #35-01
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 59 04/04/2018 21:47
www.MySingaporeLaunch.com
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
FULL HEIGHTSCREENING
AC LEDGE
STORE
DB/ST
F W
UTILITY
WC
KITCHEN/YARD
DININGBATH 2
BEDROOM 3
LIVING
MASTERBATH
BEDROOM 2
MASTERBEDROOM
BALCONY
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
3 - B E D R O O M D E L U X E T Y P E C 2
99 sq m / 1066 sq ft
#02-15 to #35-15
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 60 04/04/2018 21:47 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
3 - B E D R O O M D E L U X E T Y P E C 3
98 sq m / 1055 sq ft
#02-10 to #36-10
BALCONY
BEDROOM 2
F
BALCONY
AC LEDGE
MASTERBATH
BATH 2
WC
UTILITYDINING
KITCHEN/YARD
LIVING
MASTERBEDROOM
WDB/ST
BEDROOM 3
STORE
APPLICABLE TO#36-10
BALCONY
BEDROOM 2
F
BALCONY
AC LEDGE
MASTERBATH
BATH 2
WC
UTILITYDINING
KITCHEN/YARD
LIVING
MASTERBEDROOM
WDB/ST
BEDROOM 3
STORE
APPLICABLE TO#36-10
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 61 04/04/2018 21:47
www.MySingaporeLaunch.com
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
LIVING
STORE
ACLEDGE
DB/S
T
DINING
STUDY
BEDROOM 3BEDROOM 2
MASTERBEDROOM
MASTERBATH BATH 2
WC
UTILITY
BALCONY
AC LEDGE
W F
KITCHEN/YARD
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
3 - B E D R O O M + S T U D Y T Y P E C 4 s
110 sq m / 1184 sq ft
#02-09 to #35-09
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 62 04/04/2018 21:47 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
MASTERBEDROOM
DB/ST
WF
KITCHEN/YARD
DINING
UTILITY
STORE
AC LEDGE
BATH 2 MASTERBATH
STUDY
BEDROOM 2BEDROOM 3
LIVING
BALCONY
WC
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
3 - B E D R O O M + S T U D Y T Y P E C 5 s
106 sq m / 1141 sq ft
#02-05 to #35-05
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
CSC-0099-Brochure-230x360-r26_ok.indd 63 04/04/2018 21:47
www.MySingaporeLaunch.com
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
4 - B E D R O O M
CSC-0099-Brochure-230x360-r26_ok.indd 64 04/04/2018 21:48 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
STORE
DB/S
T
F W
BATH 2
BEDROOM 2
BEDROOM 4 BEDROOM 3
MASTERBATH
MASTERBEDROOM
WC
UTILITY
KITCHEN/YARD
LIVING
DINING
AC LEDGE
BALCONY
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
4 - B E D R O O M E X E C U T I V E T Y P E D 1
116 sq m / 1249 sq ft
#02-06 to #35-06
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
0 1 2 3 4 5M
CSC-0099-Brochure-230x360-r26_ok.indd 65 04/04/2018 21:48
www.MySingaporeLaunch.com
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
FULL HEIGHTSCREENING
BEDROOM 3
STORE
DB/S
T
BEDROOM 4KITCHEN / YARD
W
STORE
F
WC
STORE
BATH 2
BEDROOM 2
ACLEDGE
MASTERBATH
MASTERBEDROOM
DINING
LIVING
AC LEDGE
BALCONY
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
4 - B E D R O O M E X E C U T I V E T Y P E D 1 a
115 sq m / 1238 sq ft
#36-13
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
0 1 2 3 4 5M
CSC-0099-Brochure-230x360-r26_ok.indd 66 04/04/2018 21:48 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
STUDY
JUNIORMASTER BATH
AC LEDGE
W DB/S
T
F
BATH 3
WC
UTILITYKITCHEN/
YARD
DRYKITCHEN
DINING
LIVING
JUNIORMASTER
BEDROOM
BEDROOM 4BEDROOM 3
MASTERBATH
MASTERBEDROOM
BALCONY
STORE
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
4 - B E D R O O M + S T U D Y T Y P E D 2 s
128 sq m / 1378 sq ft
#02-03 to #35-03
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
0 1 2 3 4 5M
CSC-0099-Brochure-230x360-r26_ok.indd 67 04/04/2018 21:48
www.MySingaporeLaunch.com
CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
UTILITY
BALCONY
MASTERBEDROOM
MASTERBATH
JUNIORMASTER
BEDROOM
JUNIOR MASTERBATH
BEDROOM 3 BEDROOM 4
BATH 3
PRIVATELIFT
LOBBY
LIVING DINING
DRYKITCHEN
WC
F
W
STORE
KITCHEN
ACLEDGE
DB/S
T
PRIVATELIFT
YARD
SU
NG
EI P
AN
DA
N
WE
ST
CO
AS
T V
AL
E
Key plan not to scale
4 - B E D R O O M D E L U X ET Y P E D 3
141 sq m / 1518 sq ft
#02-02 to #35-02
Area includes AC ledge and balcony. RC ledge and void are excluded from strata area. The plans are subject to changes as may be required or approved by relevant authorities.All areas and measurements stated herein are approximate and subject to final survey. Please refer to the key plan for orientation.
Wall not allowed to be hacked or altered (including by way of drilling)(Refer to the clause pertaining to Prefabricated Prefinished Volumetric Construction in the Sales & Purchase Agreement)
LEGEND
0 1 2 3 4 5M
CSC-0099-Brochure-230x360-r26_ok.indd 68 04/04/2018 21:48 CSC-0099-BrochureClient: 3 ACES
DH1801189_GP4B_CLC (3)_D: 18-012(W)230mm X (H)360mm ISO47L
6221 8899w w w . t w i n v e w . c o m . s g
Developer: CSC Land Group (Singapore) Pte Ltd (UEN No. 201707167K) • Developer Licence No.: C1229 • Lot No.: Lot 9112P MK 5 at West Coast Vale
• Tenure of Land: 99 years commencing from 15 May 2017 • Encumbrances on the Land: Caveat(s) / Mortgage(s) in favour of DBS Bank Ltd
• Expected Date of Vacant Possession: 30 June 2022 • Expected Date of Legal Completion: 30 June 2025
Reasonable care has been taken in the preparation of this brochure, and the construction of the scale models and showflat (collectively “the Collaterals”), but the
Developer and Marketing Agents cannot be held responsible for inaccuracies or omissions of the Collaterals. The statements, information and depictions in the
Collaterals may not be relied upon as statements or representations of fact, and they are not intended to form any part of the contract for the sale of the housing
units. In particular, visual representations such as pictures and drawings are artist’s impressions only, and are not representations of fact. All information contained
in the Collaterals, including equipment, materials, fittings, finishes, installations and appliances description, plans and specifications, are current at the time of
printing, and are subject to changes as are required by the Developer or relevant authorities. The floor areas stated in the brochure are subject to final survey.
CSC-0099-Brochure-230x360-r26_ok.indd 69 04/04/2018 21:58
www.MySingaporeLaunch.com