    POWER

    Superior flexibility / Superior performance

    GT13E2GAS TURBINE

  • 8/12/2019 Alstom 13E2

    2/20

    Power,productivity, profit

    02

    Wherever they operate worldwide, utilities and independent power producers have to cope with rapid

    changes - tougher emissions legislation and fierce competition not least among them.At the same time they need to reduce production costs yet major power interruptions dramatically

    illustrate the danger of cutting cost at the expense of reliability. To increase long-term profits, even

    at a time of volatile fuel and electricity prices, it is vital to continue to raise efficiency and productivity.

    Alstoms GT13E2 gas turbine offers the highest engine efficiency of conventional class gasturbines yet has long inspection intervals. With millions of fired hours of operation to

    its credit, the GT13E2 is the perfect core of a power plant, designed to produce reliable,competitively priced electricity.

    The GT13E2 offers superior flexibility through two operating modes one maximises performance,the other maximises operating time between inspection intervals. In addition, the engine can actively

    support grid frequency with high response and no extra lifetime factors.

    The GT13E2, whose gas turbine technology has earned its stripes over the years, is designedfor a wide range of applications. It can operate as a stand-alone turbine in a new or existing

    power plant design or as part of a turnkey power plant. Applications cover electrical power

    generation in base load, intermediate or peak duty. It can be used in industrial applications

    such as aluminium smelters or desalination plants. With its modularised and pre-tested

    auxiliaries, the GT13E2 can be brought on-line quickly to support phased plant construction.

    Right technology, right products

    Alstoms gas turbines stand out for their high cost efficiency,

    availability and flexibility.

    The range covers a wide spectrum of products, including machines

    for both the 50 Hz and 60 Hz markets. They can operate either in

    simple cycle or combined cycle and are fuelled by natural gas,

    medium or low calorific gases or light oil; with on-line fuel switch

    over capability eliminating dependency on any one fuel.

  • 8/12/2019 Alstom 13E2

    3/20

    Unmatched efficiencyThe GT13E2 has the highest open-cycle efficiency of conventional class gasturbines close to 37% (ISO) with a high exhaust energy level. This offers

    significant fuel cost savings over competing technologies for a wide variety

    of applications. It is achieved by carefully optimizing existing proven

    technology without the need for expensive and high-maintenance

    technologies used in some advanced gas turbines. The benefit of lower

    operating cost is, therefore, not compromised by higher maintenance costs

    or reduced availability.

    Operational flexibilityThe GT13E2 can operate in either a performance optimised mode or a lifetimeoptimised mode without having to change hardware. Both respond to

    increasingly volatile markets by allowing the operator to select, on-line, the best

    operating mode to maximise profit. Operational flexibility also includes the

    ability to handle wide fluctuations in gas composition. In addition, the engine

    can operate on diesel oil (with or without water injection for NOx control), with

    an on-line switch-over between gas and oil even at full load.

    Low maintenance cost/longer inspection intervalsThe GT13E2 has a number of family assets. Firstly, the maintenance-free welded

    rotor eliminates the need for major overhauls. Secondly, the fully annularcombustor does not require any combustor inspections. With the GT13E2, youcan achieve maintenance intervals of 36,000 Equivalent Operating Hours (EOH)

    between hot gas path inspections. This makes the GT13E2 the ultimate choicefor operating regimes with a higher sensitivity to O&M costs and availability.

    Continuous evolutionThe GT13E2 continues to be at the cutting edge thanks to constant technologyevolution. These incremental improvements use the engineering tools validated

    at the Alstom Test Power Plant and confirmed with test campaigns in the field.

    Two retrofittable upgrades on the GT13E2 are a prime illustration improved

    turbine blading with the flexible operating concept and a compressor upgrade.

    03

    GT13E2:the benefits

  • 8/12/2019 Alstom 13E2

    4/20

    Designed for dependable,low cost operation

    The welded rotor design eliminates maintenance work such

    as restacking and disk replacement or factory rotor overhaul

    and thus eliminates the need for a so called major overhaul

    of the GT.

    Low-stage loaded compressorThe 21-stage compressor with its low stage loading yields

    a high surge margin and high reliability.

    Variable inlet guide vanes control airflow efficiently, increasing

    part load efficiency and starting reliability.

    Annular combustorA fully annular combustion chamber distributes the

    circumferential temperature evenly while avoiding problem

    zones such as cross-firing tubes or transition pieces. In

    addition the annular combustion systems of Alstom do not

    need a so called "combustor inspection" as for can-annular

    systems which reduces the amount of maintenance leading to

    higher availability.

    Every component of the GT13E2 is the result oftime-tested design principles, thorough validation andmanufacturing processes conforming to the highest standards.

    Maintenance-free welded rotorAlstoms welded rotor was first introduced in 1929 for steam

    turbines and has been operating successfully in both Alstom

    gas and steam turbines. The rotor is welded from forged discs

    that ensure high rotor stiffness with two-bearing support.

    04

    Rotor manufacturing

    welding process.

  • 8/12/2019 Alstom 13E2

    5/20

    Dry low NOx EV burnerEV (EnVironmental) burner technology, operating successfully

    for several millions of hours throughout the Alstom gas turbine

    fleet, gives long burner life, no maintenance between hot gas

    path inspection and low emissions.

    The EV burner gives the benefit of dry low NOx combustion

    for operation with different natural gases, with the option to

    run with liquid fuel as an alternative.

    TurbineAdvanced aerodynamics and multi-convective cooling schemes

    contribute significantly to the GT13E2s outstanding efficiency.

    The design of the first turbine stage, combined with thermal

    barrier coating (TBC) and conservative firing temperatures,

    allows extended inspection intervals of up to 36,000 EOH.

    All Inconel 738 conventional cast turbine airfoils and heat

    shields ensure long parts life and allow for full, cost-effective

    refurbishment.

    Axial exhaust systemThe straight-line arrangement of gas turbine and heat recovery

    steam generator (HRSG) facilitates compact plant layouts.

    The elimination of the turning elbow reduces back-pressure

    and turbulence at the HRSG inlet. This improves unit

    performance in simple and combined cycle mode.

    05

  • 8/12/2019 Alstom 13E2

    6/20

    06

    Flexibility and efficiency

    The longer and more flexible inspection intervals thatthe GT13E2 offers, linked to higher efficiency when required,provide the optimal hedging against fuel price uncertainty.

    Extended inspection

    intervalsOne of the key benefits of the GT13E2is the ability to operate with extended

    inspection intervals for low fuel cost

    applications or in schemes where fuel

    is provided by the power off-taker

    (Tolling or Energy Conversion

    schemes). You get this benefit with

    only a marginal reduction in efficiency

    and output. The GT13E2s optimisedoperation mode allows for 36,000

    equivalent operating hours between

    Hot Gas Path inspections.

    Efficiency

    The GT13E2 has the highest efficiencyof conventional class gas turbines insimple cycle. It offers unrivalled

    performance in markets where fuel

    prices are high or fluctuate regularly.

    The combination of high power output

    and high conventional class availability

    in both simple and combined cycle are

    compelling advantages. The

    performance optimised operation mode

    also offers the lowest Cost of Electricity

    (CoE) when fuel prices are high.

    The importanceof flexibilityWhere demand is seasonal or fuel prices

    are volatile, the ability to switch between

    operation modes on-line provides an

    added operational advantage. The

    GT13E2 has been designed to deliverthe high operational flexibility that allows

    a plant owner to maximise profits with

    the same hardware.

  • 8/12/2019 Alstom 13E2

    7/20

    InvestmentCost

    FuelCost

    O&MCost

    Baseload

    Intermediate

    Peaking

    CoE (cents/kWh) CoE (cents/kWh)

    LIFETIME CONCEPT PERFORMANCE CONCEPT

    IMPACT OF CAPITAL COST AND O&M COST (I.E. INSPECTION INTERVALS)

    IMPACT OF FUEL COST (I.E. EFFICIENCY)

    Operating regime

    Fuel price

    07

    Meeting customer requirements

    Our long experience working with customers andour understanding of different markets across the globeenable us to adapt to a variety of customer needs.

    Low fuel prices

    When fuel prices are low, O&M costshave a significant impact on the total

    Cost of Electricity (CoE). To keep O&M

    costs down, as plant owner you may

    decide to run the plant with longer

    inspection intervals. Using this operation

    mode of the GT13E2, maintenancecosts can be contained since the EOH

    Hot Gas Path inspection intervals run

    to 36,000 equivalent operating hours.Furthermore, at around 0.2%, the

    reduction in simple-cycle efficiency is

    negligible. The contributions of O&M,

    fuel and capital costs to the total Cost

    of Electricity, and the preferable

    configuration, are shown in the figure

    below.

    High fuel and/or

    electricity pricesWhen fuel prices are high, the fuelportion of CoE becomes the dominant

    cost factor. Here, efficiency has a huge

    leverage effect. You cannot influence

    the fuel prices, but you can strive to get

    maximum power from the fuel to partly

    compensate.

    The performance optimised operation

    mode of the GT13E2 assuresmaximum power - the highest power

    output in its class, with the addedbenefit of high efficiency, both in simple

    cycle and combined cycle, at high

    availability and reliability levels.

    In times of peak demand, when

    electricity prices are high, switching to

    the performance optimised operation

    mode allows you to maximise

    revenues. Alstom also offers integrated

    inlet cooling and power increase

    options that give even more operational

    flexibility for following a variableelectricity demand.

  • 8/12/2019 Alstom 13E2

    8/20

    A key aspect is integration,because it can substantially enhance

    flexibility and performance. As a gasturbine plant EPC contractor, this would

    include the following requirements:

    T The gas turbine should be designed

    for simple and cost effective

    integration into the overall plant.

    T In-depth, comprehensive user

    information should be readily available.

    T Application consulting needs to be

    available when required.

    As a plant owner/operator, you would add

    the following requirements to the list:

    T Operational flexibility to support plant

    dispatch requirements such as quick

    start-up, fuel flexibility, black start,

    power augmentation, air inlet cooling.

    T Operational stability to accommodate

    sudden load changes, active grid

    frequency support, black grid

    restoration, partial or global load

    rejection.T An efficient Operation and

    Maintenance regime.

    08

    Seamless integration

    Developing, building, and operating a profitable gas turbinepower plant goes far beyond selecting components withpromising individual specification parameters.

    With the Alstom GT13E2 gas turbine,all the above come as standard.

    The GT13E2 is the result of years ofAlstom experience in gas turbine plant

    design and construction. This

    experience goes back to the worlds first

    commercial gas turbine plant in

    Neuchatel, Switzerland, in 1939. Today,

    Alstom is the leading EPC contractor

    worldwide, with technology for all plant

    components in house.

    The GT13E2 is also backed by Alstomsplant operating and maintenance

    service expertise, with a portfolio from

    spare parts delivery up to full operation

    and maintenance. Operational support

    is also available on a 24 hour / 7 day

    basis with the on-line Alstom Monitoring

    and Diagnosis System (AMODIS).

  • 8/12/2019 Alstom 13E2

    9/20

    09

    1] Engine designT Compact arrangement, particularly for multi-unit or

    combined-cycle configurations.

    T Lower investment and better use of lay-down space by

    using a common crane.

    T Reduced dust ingestion and longer filter life from an

    elevated air intake location.

    T Effective maintenance of indoor or outdoor

    configurations through a spacious off-base GT

    enclosure.

    T Quick installation and start-up through pre-assembled

    and pretested mechanical and electrical auxiliaries.

    TA comprehensive standard scope for low integration

    and maintenance costs and high availability.

    TA generator breaker, eliminating costly HV in-feed for

    start-up.

    TA static starting device to allow for multiple starts.

    TA TOPAIR high-efficiency totally enclosed air-cooled

    generator avoiding the use of hydrogen and the

    corresponding expensive auxiliaries.T Full on-site maintainability of the engine.

    2] Scope flexibilityTAs both a leading equipment OEM and a major turnkey

    constructor, Alstom can tailor its scope to meet any

    customer needs.

    TWith our experience, we can contribute to projects of

    any size or scope from a single gas turbine unit to a

    full turnkey operation.

    TAdditional services such as training, spare parts and

    customised operation as well as maintenance solutionscan be provided, depending on customer requirements.

    3] Project Development SupportT Project feasibility studies and commercial modeling.

    T Plant concept and technical/commercial assessment.

    T Site evaluation and foundation engineering.

    T Permitting and environmental impact analysis.

    T Site access and heavy equipment transport studies

    and advice.

    T Grid interface and grid stability studies.

    T Financial engineering assistance.

    T Plant design.

    4] Integration SupportT Engineering documents available to customers and

    in electronic form for simple integration into bid or

    project documentation.

    T Staggered provision of information to match the

    projects development phase:

    - Application Information Package for project

    development.

    - Proposal Integration Package for proposal support.- Project Start-Up Package for contract start phase.

    T Commitment on power train performance is also

    provided as part of the life-cycle cost analysis.

    GT13E2 key benefits

  • 8/12/2019 Alstom 13E2

    10/20

    10

    The GT13E2 in action delivering profitThe GT13E2 is Alstoms answer to the increasing worldwide demand for high-performancegas turbines. Equally suitable for combined-cycle and open-cycle plants, it supports almostevery type of application.

    With more than one hundred GT13E2sin operation and millions of fired hours

    to its credit, this superior gas turbine

    has already built an impressive track

    record of reliability and performance in

    various stringent conditions.

    FKirina / ALGERIA2xGT13E2, 292 MW

    Fuel: natural gas/oil No.2

    Sonelgaz base load simple cycle power

    plant, operating since October 2004,

    is a key support of the Algerian grid

    at its far northeastern end. The plant

    is located 120 km South-East of

    Constantine, the third largest city in

    Algeria.

    The plant was built on a turnkey basis

    in record time, from contract signing tothe first units commercial operation

    date. The second unit was on-line one

    month later both units completedexactly on time.

    The plant layout was prepared such that

    the planned addition of further units,

    including the conversion to combined

    cycle can be accomplished without

    disturbing the operation of the Phase 1

    portion of the plant.

    Ever since FKirina has gone commercial,

    it has been a cornerstone of Sonelgaz

    power supply to the Algerian national

    grid. With its exceptional reliability and

    availability, the plant has become one of

    Sonelgaz premiere moneymakers.

    Cockburn / AUSTRALIA1xKA13E2-1, 240 MW

    Fuel: natural gas/oil No. 2

    Western Powers 240 MW combined-

    cycle Cockburn power plant is situated

    adjacent to the existing coal-firedpower plant in Kwinana, 30 km south

    of Perth in Western Australia.

    The GT13E2 in simple cycleT Efficient, reliable operation

    T Packaged for fast, low-cost

    installation

    T Fast start and loadingT Excellent grid stabilising

    capability

    The GT13E2 in combined cycleT High exhaust energy and

    temperature for superior

    thermodynamic performance

    T Cold-end drive and axial exhaust

    for reduced exhaust system

    pressure losses and better layout

    T Available pre-engineered multi-shaft configurations

    Kuala Langat,

    Malaysia.

  • 8/12/2019 Alstom 13E2

    11/20

    11

    The plant supplies power to the states

    south-western region and the state

    capitals metropolitan area. The

    strategic location is near an established

    transmission infrastructure, natural gas

    fuel supply pipelines and cooling ocean

    water. The construction began in June

    2002 and cold commissioning took

    place at the end of March 2003.Completion was achieved in early

    October 2003, nearly four months

    ahead of schedule.

    Kuala Langat / MALAYSIA1xKA13E2-3, 670 MW

    Fuel: natural gas/oil No. 2

    This cogeneration plant was the first of

    several independent power projects

    with the GT13E2 in Malaysia. Ownedby Genting Sanyen Power, the 667 MW

    combined-cycle plant was built on a

    fast track, completed only 24 months

    after contract signing two months

    ahead of schedule. The first turbine

    was installed in simple cycle mode in

    November 1994 and all three were

    being operated by March 1995. With

    the completion of the steam cycle, the

    plant generated 667 MW and supplied

    57 tons/hour of process steam to theadjacent paper mill. Power output has

    been increased in steps since 2002 by

    upgrading the gas turbines to the latest

    version. In early 2007, all gas turbines

    were upgraded to a flexible operating

    mode that allows choosing on-line

    between higher output and extended

    lifetime.

    Ras Abu Fontas B & B1 /QATAR8xGT13E2, total 1000 MW

    Fuel: natural gas

    Ras Abu Fontas B, in commercial

    operation since 1995, is the largest and

    most important power and water

    production plant in Qatar. The power

    plant is based on five gas turbines type

    GT13E2, operating in simple cycle witha nominal capacity of 625 MW of

    power at 48C ambient temperature.

    The desalination plant is designed for

    a water production of 150,000 m3 per

    day. To meet the rapidly growing power

    demand, the power plant capacity has

    been augmented by 377 MW with the

    completion in 2002 of the expansion

    Ras Abu Fontas B1, with three additional

    gas turbines of same GT13E2 type.

    All eight gas turbines are installed in oneair-conditioned gas turbine building.

    Operating on natural gas from 14

    different sources, with a wide range of

    gas compositions without any hardware

    change, the power plant has

    demonstrated its exceptional fuel

    flexibility.

  • 8/12/2019 Alstom 13E2

    12/20

    12

    Alba / BAHRAINPower station 3 & 42xKA13D-3, 723MW/2xKA13E2-2, 807MW

    Fuel: natural gas/oil No.2 / natural gas

    With an installed production capacity

    of more than 800,000 tonnes per year,

    Aluminium Bahrain (Alba) is currentlyone of the largest modern aluminium

    smelters in the world.

    The main power system supplying

    the aluminium pot lines is run

    independently from the national grid

    system, thus puting some unusual

    electrical system control requirements

    on the captive power system. High gas

    turbine and combined cycle flexibility

    and continuous reliability are a must.

    3/4 of Alba installed power generation

    capacity is supplied by Power Stations 3

    & 4 installed by Alstom. The GT13D gasturbines of Power Station 3 have been

    continuously improved and upgraded,

    resulting in increased performance,

    extended inspection intervals, increased

    expected lifetime and improved overall

    availability. The NOx emissions have also

    been considerably reduced.

    The GT13E2s of Power Station 4 operatein the lifetime optimised mode and are

    able to cope with the possibility of large

    power surges.

    The gas turbines GT13D and GT13E2have demonstrated their excellentcapabilities in powering an industrial

    plant with stringent reliability and

    flexibility requirements.

    Pelican Point / AUSTRALIA1xKA13E2-2, 480 MW

    Fuel: natural gas

    In 1998, the government of South

    Australia knew it would need to act

    quickly if it was to prevent power

    shortages. It decided to call on the

    private sector; the result was Pelican

    Point, a 500 MW combined-cycle

    power project developed on a fast

    track basis by National Power. The

    plant increased South Australias

    generating capacity by 20 per cent.

    Alstom was awarded the turnkey

    project in 1999 by National Power

    South Australia Investments Ltd, asubsidiary of National Power plc. The

    plant is equipped with two GT13E2

    gas turbines and has been operational

    since September 2000. The turbines

    are equipped with advanced high-

    efficiency, low-emission burner

    technology to help meet the strict

    environmental requirements at the

    site. Alstom also supplied the overall

    power plant control system, plant

    engineering, and associatedinstallation and commissioning.

    Lumut Extension /MALAYSIA1xKA13E2-3, 650 MW

    Fuel: natural gas/oil No. 2

    The Lumut IPP project is playing an

    important role in meeting Malaysias

    increasing power demand. When

    Alstom won the turnkey contract to

    supply another block to the GT13E2based 1,400 MW combined-cycle

    power plant Lumut in Malaysia, it

    made the plant the largest independent

    (IPP) CCPP in Southeast Asia.

    After the 1997 crisis, the government

    wanted a new peaking plant to be in

    operation by the end of 2001. With an

    existing plant at Lumut and therefore

    an available infrastructure, it decided to

    look at expanding the site to increasethe capacity of the plant. In order to be

    operational before the projected

    Lumut extension,

    Malaysia

  • 8/12/2019 Alstom 13E2

    13/20

    13

    shortage, the new Lumut Block 3

    would have to be given fast track

    status, and in order to have power

    available to meet the expected

    demand, the project developers

    invested in a bypass stack. This allowed

    open-cycle operations so that 431 MW

    would be available while work was

    being done to convert the plant to

    combined cycle.

    The Lumut power plant is located in

    the state of Perak, Malaysia. The

    customer is GB3 Sdn Bhd, a fully

    owned subsidiary of Malakoff Berhad.

    Malakoff is the largest independent

    power producer in Malaysia with a total

    power generating capacity of over

    2,000 MW. Alstom was responsible

    for the supply of 3x165 MW GT13E2gas turbines, a steam turbine, three

    HRSGs, electrical generators, the entire

    auxiliary system, control system andinterconnection facility. Alstom was

    also responsible for the supervision of

    erection and commissioning works.

    Ruwais / UNITED ARABEMIRATES4xGT13E2 500 MW

    Fuel: natural gas

    In 1998 Alstom was awarded an order

    for the Ruwais power and desalination

    plant in Abu Dhabi, United Arab Emirates.

    The cogeneration plant, operating since

    August 2000, provides 500 MW of

    power and eight million gallons of water

    per day for Abu Dhabi National Oil

    Company (ADNOC). The facility is

    located in the coastal industrial area of

    Ruwais, 230 km west of the capital Abu

    Dhabi City. Alstom supplied four

    GT13E2 gas turbines and generators,along with the associated HRSGs and

    desalination plant. We also provided the

    overall plant control system, the BoPequipment and complete engineering,

    installation and commissioning work.

    Phu My / VIETNAM1xKA13E2-2, 450 MW

    Fuel: natural gas/oil No. 2

    The Phu My power plant is Vietnams

    largest power complex helping to serve

    the countrys increasing electricity

    demand. The complex is located in the

    southern part of the country, 80 km

    northeast of Ho Chi Minh City, and all

    power plants are of the gas turbine

    combined cycle type. The first plant has

    been operational since mid 1990s

    and the last plant was completed in

    May 2006, now with the total capacity

    of over 3,800 MW making it the largest

    power generating complex in Vietnam.

    Alstoms power plants in the complexinclude:

    - Phu My 2.1 - 300 MW, commercial

    operation 1997

    - Phu My 2.1 - Add-On 160 MW,

    commercial operation 2003

    - Phu My 4 - 450 MW, commercial

    operation 2004

    - Phu My 2.1 - 160 MW add-on,

    commercial operation 2006

    All plants feature Alstoms GT13E2gas turbine, which has the capability

    for on-line switchover from fuel-gas

    to fuel oil and vice versa.

    All plants were awarded to Alstom

    as turnkey contracts in consortium

    with Marubeni Corporation and Lilama

    (Vietnam Machinery Erection Cooperation).

  • 8/12/2019 Alstom 13E2

    14/20

    Power TrainArrangmentsAlstom has extensive experience

    with various sizes of multishaft

    arrangement in all types of

    operative regimes from base load

    to daily start and stop, in utility,cegeneration and industrial

    applications.

    Steam TurbineAlstom steam turbines offer:

    T HP turbine shrink ring design for sustained efficiency and fast start-up

    T welded rotor design for fast start-up and low maintenace

    T single bearing designs for compact arrangement

    T single lateral exhaust designs also available

    for lower foundations and lower first costs.

    1

    Heat Recovery SteamGenerator (HRSG)

    Alstom's range of HRSGs provide:

    T drum type of once-through technology

    T optimised hot and cold end

    performance for maximised combined

    cycle efficiency

    T high thermal flexibility for fast start upT highly modularised design for fast site

    erection

    4Gas TurbineAlstom gas turbines - the core of any

    combined cycle plant.

    3

    Keppel, Singapour.

    The Alstom Power Train

    TurbogeneratorAlstom turbogenerators demonstrate

    high efficiency, reliability and availability

    with low maintenance requirements.

    TOPAIR

    T multi-chamber Totally Enclosed

    Water to Air Cooled (TEWAC)

    system for high efficiency

    T self retightening stator end windings

    for low maintenance

    T proven relaibility in various

    applications and shaft arrangements.

    2

    12

    2

    3

    4

    14

  • 8/12/2019 Alstom 13E2

    15/20

    Alstom Power R&D

    We aim for the best utilisation of the Customers

    investment, the earths materials and the fuel used, throughefficiency, availability and cost reduction. The increased

    environmental concern means that we place a focus on

    minimising CO2 emissions through the development of

    mitigation and renewable technologies for application in

    new and retrofit installations.

    The engineering and R&D workforce totals 5,500 people,

    of which 4,000 are in engineering and 1,500 in R&D in

    22 R&D centres. There are 13 laboratories with dedicated

    infrastructure, equipment and testing facilitities.

    Alstom Power R&D policy takes a global approach which has

    several benefits. First, it puts the work where the expertise is

    located. Secondly, it helps to nurture close contacts with

    universities and design institutes that can complement our in-

    house efforts. Thirdly, it enables us to stay in touch with

    global customers' expectations, anticipate their needs and

    lead the technology trends.

    Alstom Power works with more than 30 universities worldwide.

    We establish close, long-term links with institutions and

    professors who are experts in fields which are important to

    us, for example, with MIT and Stanford Research Institute onCO2, Grenoble and Lausanne universities on hydro turbines,

    Cologne's DLR on combustion, Oxford University on heat

    transfer as well as with engineering institutes in China, Indiaand Russia.

    In the field of international collaboration, Alstom Power has

    played a leading role in establishing the European technology

    platform for zero emission fossil fuel power generation (ZEP).

    The Gas Turbine Test Power PlantThe Gas Turbine Test Power Plant located in Birr, Switzerland,

    provides a unique environment for maintaining Alstoms

    competitive advantage through product improvement, all

    within the proximity of Alstom's R&D facility, the gas turbine

    development department and the manufacturing facility.

    The shortened feedback loop (in terms of time and distance)

    of field experience helps in speeding up design validation

    and implementation in Alstom's gas turbine fleet. The Gas

    Turbine Test Power Plant, in combination with the Product

    Support organization and the GT development department

    puts Alstom in a position to insure seamless implementation

    of evolutionary product improvements.

    Alstom Power R&D is decidedly market and customer orientedand focuses on creating innovative technologies to apply at allstages of our products life cycles.

    GT Test Power Plant at the

    rotor factory in Birr, Switzerland.

    15

  • 8/12/2019 Alstom 13E2

    16/20

    16

    POWER SERVICE PORTFOLIO

    Full operation O&M

    General/daily maintenance o&M

    Operation & maintenance support Risk mitigationby dedicatedOEM

    Operation &MaintenanceContracts

    ServiceAgreements(LTSA)

    PurchaseOrders

    Optimization of costs

    and performance

    o&m

    Planned & unplanned maintenance m

    Planned outages Support & Consulting

    Field Services

    Parts

    Purchase Order

    Alstom offers extensive service experience in powergeneration. It has a complete range of services fromtraditional spare parts supply and field service specialists to

    the full operation and maintenance of gas turbine and

    combined-cycle power plants. As the Original Equipment

    Manufacturer (OEM) we are ideally placed to provide

    continuous plant improvement packages, e.g. performanceupgrades, lifetime extensions or emission reduction packages

    to meet changing market requirements during a plants

    operational lifetime.

    With over 100 years experience and an installed fleet of more

    than 650 GW, Alstoms 200 Local Service Centers (LSCs),

    located in 70 countries, are there to provide local facilities and

    expertise directly to our customers, keeping your plant

    competitive.

    Long-term service contractsAlstoms long-term service contracts are flexible in scope of

    services and equipment covered as well as contract duration

    in order to meet your unique business requirements. Their

    modular scope allows tailor made packages to be assembled

    based on the level of risk mitigation and guarantees required,

    enabling you to choose the correct contract model that fitsyour strategy in terms of operating and maintaining your

    power generation assets. With traditional purchase order

    contracts, customers can purchase spare parts according to

    their needs. Service agreements can add guaranteed

    availability and fixed prices for parts, services and consulting.

    With our Operations and Maintenance contracts, customers

    can have Alstom employees operating and / or maintaining

    their plants.

    Our experience covers over 25 plants and 60 gas turbines of

    the GT13E2 type with long term service contracts. Such

    contracts with the OEM benefit from the extensive first-hand

    experience gained from site operations and make full use

    of the knowledge gained from the complete installed fleet.

    With our service contracts, our partners obtain significantly

    more value to ensure key requirements (depending upon

    scope of supply) are met:

    T Predictable operation & maintenance costs

    T Reliability and availability

    T Heat rate and power output

    T Environmentally sound productsT 24 hour / 7 day plant support

    T Broad OEM experience

    Service during operation

  • 8/12/2019 Alstom 13E2

    17/20

    17

    Plant Support CentreAlstoms Plant Support Centre (PSC)

    located in Baden, Switzerland, offers

    remote, fast and comprehensive

    technical support for the whole power

    plant around the clock. In addition to

    trouble shooting, the PSC provides datamonitoring services including early

    warnings and Monitoring & Diagnostic

    Reports, assessment of health

    parameters and consulting regarding

    performance and RAM (reliability,

    availability, maintainability)

    optimization. The PSC reduces

    operational risks through its focus on

    pro-active monitoring, which provides

    early warning of emerging equipment

    problems through advanced diagnostic

    programs.

    Plant Integrator creating customer value

    Plant Integrator is Alstom's unique concept that creates

    value for our customers. Plant Integrators starting point

    is the customers viewpoint. It then systematically analyses,

    measures and optimises the specific customer benefitsdesired, technically, economically and ecologically. As a result,

    Plant Integrator matches customer needs and priorities with

    products and services, delivering a thoroughly tailored

    solution and maximising customer value. This then becomes

    the benchmark for future fine-tuning and upgrades.

    The unrivalled Plant Integrator offering from Alstom covers

    the full palette, from single component packages and control

    systems to power islands and complete plants, operation andmaintenance services, as well as retrofit solutions.

    Plant Integrator benefits to customers:

    T Improve cash flow by achieving lowest costs

    T Generate more power

    T Increase installation efficiency

    T Burn less fuel

    T Improve operational flexibility

  • 8/12/2019 Alstom 13E2

    18/20

    A world leader inclean power generation

    Alstom is a global leader in the world of powergeneration and sets the benchmark for innovative andenvironmentally friendly technologies.

    The company designs, manufactures and delivers state-of-

    the-art products and systems to the power generation

    (gas, coal and hydro power plants) and industrial markets.

    In addition, Alstom provides the conventional equipment for

    nuclear power plants.

    Our objective is to build the cleanest integrated power

    solutions for our customers. We supply and integrate all

    components of a clean power system, from boilers to air

    quality control and energy recovery systems. We also have

    extensive experience in retrofitting, upgrading and

    modernising existing power plant equipment. We can alsoboast unrivalled expertise in project management for all types

    and sizes of power generation systems small to large as

    well as single equipment to complete turnkey solutions.

    Alstoms unique offering brings real value to our customers.

    With our innovative plant integration concept, we help

    operators to maximise their plant performance, while fully

    complying with environmental regulations and obligations.

    Expertise in clean power solutionsPlant operators today face multiple challenges in their efforts

    to make their plants more competitive, while complying with

    the different environmental regulations.

    Alstom is delivering clean power solutions now. As the

    uncontested leader in clean power generation technologies,we provide the cleanest integrated power solutions

    on the market.

    Lumut, Malaysia.

    18

    A world leader

    Alstom supplies major equipment for 25% ofthe worlds installed base, making us:

    N1 in turnkey power plants

    N1 in air quality control systems

    N1 in hydro turbines and generators

    N1 in the number of installed boilers

    worldwide

    N1 in installed turbines and generators

    for nuclear power plants

    N1 in steam turbine retrofit and integrated

    retrofit projects

  • 8/12/2019 Alstom 13E2

    19/20

    They cover all plants (both existing and new ones), all energy

    sources (from fossil fuels to hydro and nuclear), and all

    emissions (NOx, SOx, Mercury, particulate matter).

    Alstom offers the complete range of products designed to helppower plants to either reduce pollutant and CO2 emissions, or

    to produce clean electricity from the outset.

    For example, we deliver new coal-fired power plants with an

    advanced supercritical design using proven clean combustion

    solutions that are integrated with state-of-the-art emission

    controls. Similarly, we improve the thermal and

    environmental efficiency of existing power plants by

    retrofitting plant components or upgrading the whole system.

    Investing in the future of clean powerAlstom is uniquely placed as a plant integrator and full-serviceprovider to design and manufacture all the components

    of a clean power plant, from turbines such as the GT13E2to generators, boilers and air quality control systems.

    Alstom also invests substantially in the research and

    development of new, environmentally friendly power solutions.

    Together with partners, universities and customers in Europe

    and the United States, we are working on collaborative

    projects to develop solutions for pre- and post-combustion

    CO2 capture and oxy-firing.

    Research in actionIn addition to our own R&D efforts to develop new emission

    control technologies and improve existing techniques, we are

    also involved in a number of public projects and partnerships,notably in the field of CO2 capture and storage. The CASTOR

    project (founded by the European Union) is studying

    procedures for post-combustion separation that lower the cost

    of CO2 capture and develop an understanding of the long

    term storage mechanism. Within the ENCAP programme

    (founded by the European Union), research is under way to

    develop new pre-combustion and post-combustion CO2capture technologies. The Zero Emission Fossil Fuel Power

    Plants (ZEP) technology platform launched by the European

    Commission aims to develop and deploy new competitive

    options for zero emission fossil fuel power plants.

    Dunkirk combined cyclepower plant, France.

    19

  • 8/12/2019 Alstom 13E2

    20/20

    PTPE/BPROB/GT13E207/eng/TMG/06.09/CH

    /6262

    Alstom,theAlstomlogoandanyalternativeversion

    thereofaretrademarksandservicemarksofAlstom.Theothernamesmentioned,registeredornot,aretheproperty

    oftheirrespectivecompanies.

    Thetechnicalan

    dotherdatacontainedinthisdocumentisprovidedforinformationonly.

    NeitherAlstom,

    itsofficersnoremployeesacceptrespo

    nsibilityfororshouldbetakenasmakinganyrepre-

    sentationorwarranty(whetherexpressorimp

    lied)astotheaccuracyorcompletenessofsuchdataortheach

    ievementsofanyprojectedperformancecriteriawheretheseareindicated.

    Noliabilityisacceptedforanyreliance

    placedupontheinformationcontainedinthisbrochure.

    Alstom

    reservestherighttoreviseorchangethisdata

    atanytimewithoutfurthernotice.

    Ifanyprovisionofthisdisclaimerisheldbyanycompetentauthoritytobeinvalid

    orunenforceableinwholeorinpartthevalidityoftheotherprovisionsandtheremainderoftheprovisioninq

    uestionshallnotbeaffected.

    Designandrealisation:LesEditionsStratgiques.

    Photocredits:

    2007BryonPaulMcCartney

    |www.a

    telier-mccartney.com,

    Alstom

    andothers.

    PrintedonpapermadewithpureECF(ElementalChlorineFree)ecologicalcelluloseproducedfrom

    treesgrown

    inproductionforestsunderresponsiblemanagement,andselectedrecycledthree-layerfibres.

    Alstom (Switzerland) Ltd

    Brown-Boveri Strasse 7CH-5401 Baden

    Switzerland

    Phone +41 56 205 70 58

    Fax +41 56 205 28 88

    www.alstom.com