HISTORIQUE ET EVOLUTION DES PLATES-FORMES AVEC TETES DE PUITS EN SURFACE (SPAR… )Les tendances pour le futur
Pierre-Armand ThomasTechnip
13 Juin 2006
Tous droits de reproduction réservés – ATMA 2006
2Tous droits de reproduction réservés – ATMA 2006
CONTENTS
PRESENTATION OF SPAR
PRESENTATION OF EXTENDABLE DRAFT PLATFORM
DEEPWATER PRODUCTS – SPECIAL STRUCTURE EQUIPMENTS
FUTURE EVOLUTION AND OTHER ENVIRONMENTSOTHER ENVIRONMENTSPRESENTATION OF EDP LATEST DEVELOPMENTS
EDP CASE STUDYDESIGN OF STRUCTURE
COMPARATIVE ANALYSIS OF DIFFERENT DOMAINS OF APPLICATIONRESEARCH & DEVELOPMENT PROGRAMME
2
DEEPWATER PRODUCTS
SPAR
Tous droits de reproduction réservés – ATMA 2006
4Tous droits de reproduction réservés – ATMA 2006
Proprietary
Item
Spar progression
3
5Tous droits de reproduction réservés – ATMA 2006
From Classic Spar to Truss and Cell Spar
Significant improvements in many domains :Risers suspension,Mooring lines,VIV approach,Top tension risers.
6Tous droits de reproduction réservés – ATMA 2006
Ring section assembly at yard assembling rails
4
7Tous droits de reproduction réservés – ATMA 2006
Barge Harry at the end of assembly rails
8Tous droits de reproduction réservés – ATMA 2006
Evolution of construction model
Dedicated investment to improve model delivery
5
9Tous droits de reproduction réservés – ATMA 2006
Chevron Tahiti Spar Dimensions & Weights
BasicsWater Depth 4,000 ftProduction and Quarters only, all subsea wellsTopsides design throughput 125 MBPOD SITWHP 12,300 psig
Spar dimensionsDiameter 128 ftDraft 500 ftFreeboard 55 ftCenterwell 50x50 ftHard Tank Length 216 ft
Mooring13 lines ; 6.2” chain, 10.2” polyester
Risers4 production, 2 test, 2 water injectors; all in pull-tubesOil and gas export risers w/ flex-joints
WeightsTopside Weight 21,000 tonsFixed Ballast 23,700 tonsVertical Mooring Load 3,800 tons
Environment100 yr Hurricane; Hs=39 ft Tp=12.7-15.3 sec, Wind=73.5 kt
10Tous droits de reproduction réservés – ATMA 2006
Tahiti First’sLargest Single-Piece Spar Dry Transportation360 degrees strake coverage requires portion of strakes to be installed offshoreFirst spar with utility/access shaft and dedicated pump room
6
11Tous droits de reproduction réservés – ATMA 2006
Holstein hard tank
LARGEST EVER BUILT
12Tous droits de reproduction réservés – ATMA 2006
RED HAWK
Both the hull and topsides wereinstalled in March 2004.(first gas in July 2004)
THIS WAS THE FIRST APPLICATION OF
A CELL SPAR
Cell Spar
7
13Tous droits de reproduction réservés – ATMA 2006
Cell Spar InstallationUpend Spar at
Integration Site Install Fixed Ballast
14Tous droits de reproduction réservés – ATMA 2006
Hull unconditionally stable28 separate buoyancy compartmentsCenter of buoyancy above center of weightSimple ballast systemOperator cannot sink vesselNo down flooding pointsMooring line failure can not capsize vessel
Other hulls less safeFewer compartmentsHappier upside downComplicated ballast control system
Cell spar safest floater
RESISTANCE TO HURRICANESTO BE TAKEN INTO ACCOUNT
SERIOUSLY
8
15Tous droits de reproduction réservés – ATMA 2006
Spar model for installation request
Towing of Spar hull horizontallyUpending at deep site > 200 m water depthTopsides installation by heavy crane for floatoverHook-up and commissioning offshore
16Tous droits de reproduction réservés – ATMA 2006
CONTENTS
PRESENTATION OF SPAR
PRESENTATION OF EXTENDABLE DRAFT PLATFORM
DEEPWATER PRODUCTS – SPECIAL STRUCTURE EQUIPMENTS
FUTURE EVOLUTION AND OTHER ENVIRONMENTSOTHER ENVIRONMENTSPRESENTATION OF EDP LATEST DEVELOPMENTS
EDP CASE STUDYDESIGN OF STRUCTURE
COMPARATIVE ANALYSIS OF DIFFERENT DOMAINS OF APPLICATIONRESEARCH & DEVELOPMENT PROGRAMME
9
DEEPWATER PRODUCTS
EDP
Tous droits de reproduction réservés – ATMA 2006
18Tous droits de reproduction réservés – ATMA 2006
Extendable Draft Platform (EDP) for production drilling / workover
Full integration onshore -minimum offshore HUC / no flotel
Suitable for large payloads, deep water &high well counts
Composed of:Barge-type Deck Topside facilities on top of deckLegs (buoyant column + truss)Pontoon (heave plate)
Tow to field
Operation
Extendable Draft Platform (EDP)
10
19Tous droits de reproduction réservés – ATMA 2006
EDP installation
Reminder of Spar installation requirements :
The EDP concept is offering a solution that mitigate these issues
20Tous droits de reproduction réservés – ATMA 2006
Model Test performed with GOM conditions - 1 year winter storm
EDP Model test/completion status
Tests have proven as good motion responses as Spar
11
21Tous droits de reproduction réservés – ATMA 2006
CONTENTS
PRESENTATION OF SPAR
PRESENTATION OF EXTENDABLE DRAFT PLATFORM
DEEPWATER PRODUCTS – SPECIAL STRUCTURE EQUIPMENTS
FUTURE EVOLUTION AND OTHER ENVIRONMENTSOTHER ENVIRONMENTSPRESENTATION OF EDP LATEST DEVELOPMENTS
EDP CASE STUDYDESIGN OF STRUCTURE
COMPARATIVE ANALYSIS OF DIFFERENT DOMAINS OF APPLICATIONRESEARCH & DEVELOPMENT PROGRAMME
22Tous droits de reproduction réservés – ATMA 2006
Special structure equipment
Beside the hull design, the « ancillary equipments » capture a lot of attention to provide the best service for SCR behaviour and integrity and the best handling of surface trees
12
23Tous droits de reproduction réservés – ATMA 2006
Winching equipmentRotary winches (wire)Linear winches (wire)Chain windlasses or capstansChain jacks or devil’s claws
FairleadsRotary-typeBending shoe type
StoppersPassiveActive
Platform-based mooring equipment
24Tous droits de reproduction réservés – ATMA 2006Tous droits de reproduction réservés – ATMA 2006
13
25Tous droits de reproduction réservés – ATMA 2006
Kerr McGee Boomvang & NansenPre-Installed Pull Tubes
Examples : Pull tube hull equipment
26Tous droits de reproduction réservés – ATMA 2006
Porch interface suitable for FlexJoint or Taper Stress JointExamples : porch – SCR interface
14
27Tous droits de reproduction réservés – ATMA 2006
Hydro pneumatic Hydro pneumatic tensionerstensioners
EDP dry trees risers tensioners
28Tous droits de reproduction réservés – ATMA 2006
Truss Spars
0
5000
10000
15000
20000
25000
30000
35000
40000
0 5000 10000 15000 20000 25000 30000 35000 40000 45000
Topsides Weight - S tons
Wei
ght -
S to
ns
Small
Medium
Big Dry Trees
Big Wet Trees
B / Nansen
Gunnison
Horn Mountain
Mad Dog
Holstein
Hull weight comparison
15
29Tous droits de reproduction réservés – ATMA 2006
Truss and Cell Spars
0
5000
10000
15000
20000
25000
30000
35000
40000
0 5000 10000 15000 20000 25000 30000 35000 40000 45000
Topsides Weight - S tons
Wei
ght -
S to
ns
SmallMediumBig Dry TreesBig Wet Trees6 Cell Wet Trees8 Cell Wet Trees8 Cell Dry TreesRed HawkB / NansenGunnisonHorn MountainMad DogHolstein
Hull weight comparison
30Tous droits de reproduction réservés – ATMA 2006
Truss / Cell Spars and EDP
0
5000
10000
15000
20000
25000
30000
35000
40000
0 5000 10000 15000 20000 25000 30000 35000 40000 45000
Topsides Weight - S tons
Wei
ght -
S to
ns
SmallMediumBig Dry TreesBig Wet Trees6 Cell Wet Trees8 Cell Wet Trees8 Cell Dry TreesRed HawkB / NansenGunnisonHorn MountainMad DogHolsteinEDP - Sizing toolEDP vs Semi Study
Hull Weight comparison
16
31Tous droits de reproduction réservés – ATMA 2006
Kikeh Spar Dimensions & Weights
Spar dimensionsDiameter 106 ftDraft 430 ftFreeboard 35 ftCenterwell 55x55 ftHard Tank Length 220 ft
Mooring10 Lines; 142mm Chain, 108mm Spiral Strand
Risers24 Prod + 1 Drilling TTR w/Riser Hydraulic TensionersTensioner Max Stroke 21 ft
WeightsTopside Weight (w/workover) 6600 tMax Well System Load 4200 t (w/ 24 TTRs) Fixed Ballast 2900 tVertical Mooring Load 2200 t
Environment100 yr Typhoon; Hs=20.7ft Tp=16sec, Wind=30kt
32Tous droits de reproduction réservés – ATMA 2006
Kikeh First’sFirst SPAR Outside GoM
Hull, Topsides Constructed in MalaysiaTOF Supervision & Know-How
Tender Assisted Drilling
Direct Tensioner System
Topside Floatover installation
Global Project ExecutionKuala Lumpur / Pori / Houston / Perth / Paris
Topside FloatoverTopside Floatover
17
33Tous droits de reproduction réservés – ATMA 2006
Kikeh Hull Fabrication at MMHE (Malaysia)
Hull Fabrication
Topside Fabrication MMHE April 14th 2006
34Tous droits de reproduction réservés – ATMA 2006
CONTENTS
PRESENTATION OF SPAR
PRESENTATION OF EXTENDABLE DRAFT PLATFORM
DEEPWATER PRODUCTS – SPECIAL STRUCTURE EQUIPMENTS
FUTURE EVOLUTION AND OTHER ENVIRONMENTSOTHER ENVIRONMENTSPRESENTATION OF EDP LATEST DEVELOPMENTS
EDP CASE STUDYDESIGN OF STRUCTURE
COMPARATIVE ANALYSIS OF DIFFERENT DOMAINS OF APPLICATIONRESEARCH & DEVELOPMENT PROGRAMME
18
35Tous droits de reproduction réservés – ATMA 2006
Disconnectable Spar for Ice Regions
36Tous droits de reproduction réservés – ATMA 2006
Bottom section disconnected from Upper Hull
19
37Tous droits de reproduction réservés – ATMA 2006
CONTENTS
PRESENTATION OF SPAR
PRESENTATION OF EXTENDABLE DRAFT PLATFORM
DEEPWATER PRODUCTS – SPECIAL STRUCTURE EQUIPMENTS
FUTURE EVOLUTION AND OTHER ENVIRONMENTSOTHER ENVIRONMENTSPRESENTATION OF EDP LATEST DEVELOPMENTS
EDP CASE STUDYDESIGN OF STRUCTURE
COMPARATIVE ANALYSIS OF DIFFERENT DOMAINS OF APPLICATIONRESEARCH & DEVELOPMENT PROGRAMME
38Tous droits de reproduction réservés – ATMA 2006
Review of EDP Generation (1&2)
First Generation1995 start developing TPG 3300
Second Generation
Top Related