Procurement Plan I.General 1. Project information: Country : Mauritania Borrower : IDA Project Name : PACBV Loan/Credit No. : GEF PDF B N° 054239 Project Implementing Agency (PIA) : PDRCIP AVBCIMDR 2. Bank's approval Date of the procurement Plan 3. Date of General Procurement Notice: 20104/06 4. Period covered by this procurement plan: Janvier 2010 a Decembre 2010 II. Goods and Works and non-consulting services. l. 2. 3. 4. 5. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist !Procurement Accredited Staff based on the assessment of the implementing agency's capacity.] Procurement Method Prior Review Threshold Comments ICB and LIB (Goods) >= 250 000 US $ NCB (Goods) < 250000 US $ ICB (Works) >= 500 000 US $ NCB (Works) < 500000 US $ ICB (Non-Consultant Services) [ Add other methods ifnecessary] 2. Prequalification : Neant. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Les marches communautaires executes par les Associations de Bassins Versants seront publies des leur identification par les communautes beneficiaires. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of World Bank Document schemas directeurs des bassins versants technique des offres en cours...

Procurement Plan

I.General

1. Project information: Country : Mauritania Borrower : IDA Project Name : PACBV

Loan/Credit No. : GEF PDF B N° 054239 Project Implementing Agency (PIA) : PDRCIP A VBCIMDR

2. Bank's approval Date of the procurement Plan

3. Date of General Procurement Notice: 20104/06 4. Period covered by this procurement plan: Janvier 2010 a Decembre 2010

II. Goods and Works and non-consulting services.

l.

2.

3.

4.

5.

1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist !Procurement Accredited Staff based on the assessment of the implementing agency's capacity.]

Procurement Method Prior Review Threshold Comments

ICB and LIB (Goods) >= 250 000 US $

NCB (Goods) < 250000 US $

ICB (Works) >= 500 000 US $

NCB (Works) < 500000 US $

ICB (Non-Consultant Services)

[Add other methods ifnecessary]

2. Prequalification : Neant.

3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines:

Les marches communautaires executes par les Associations de Bassins Versants seront publies des leur identification par les communautes beneficiaires.

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb350881
Typewritten Text
53863

4 . Reference to (if any) Project Operational/Procurement Manual: Acoord de doni P ACBV en date du 28/08/06

5 . Any Other Special Procurement Arrangements: Neant

6 . Procurement Packages with Methods and Time Schedule [List the Packages which require Bank's prior review first and then the other packages]

1 2 3 4 5 6 7 8 9 Estimated

Ref. Contract Cost US $ Procurement Prequali Domest Review Expected Comments No. (Description) Method fication ic by Bid-

(yes/no) Prefere Bank Opening nce (prior / Date

(yes/no) Post) 1 Equipement et mobilier des bureaux 8000 CFN Non Non Post 25/06110 2 Acquisition de Kit solaires 11 000 CFN Non Non Post 01 /06/08 3 Materiel de promotion 10000 CFN Non Non Post 04/08110 4 Refection des bureaux de l'inspection 4000 CFN Non Non Post 28 /05110

MDR d'Atar 5 Refection des bureaux de l'inspection 23000 CFN Non Non Post 14/05110

MDR de Barkeol 6 Refection des bureaux de l ' inspection 7000 CFN Non Non Post 15/05110

MDRdeNema Refection des bureaux de l'inspection 12000 CFN Non Non Post 14/04110

7 MDR de Maghama 8 Materiels de communication et de 11 000 CFN Non Non Post 21104110

reperage 9 Materiels images satellitaires 23000 CFN Non Non Post 25/07110

III. Selection of Consultants

l.Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants:

Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) >= 100 000 Dollars US 2. Single Source (Firms) >= 50 000 Dollars US

[Add sp ecific methods ifnecessary]

2. Short list comprising entirely of national consultants: Neant. 3. Any Other Special Selection Arrangements:

Protocole avec les institutions nationales et intemationales de recherche ( CNERV, CNRADA, ICARDA, ICRISAT ect ... ) pour l'introduction de nouvelles techniques/technologies qui ameliorent la lutte contre la degradation des terres et la GRN dans les bassins versants.

4. Consultancy Assignments with Selection Methods and Time Schedule

1 2 3 4 5 6 7

Ref. Description of Assignment Estimated Selection Review Expected Comments No. Cost US $ Method by Bank Proposals

(prior / Submission Post) Date

1 Etude pour l'elaboration et Ie developpement des 230000 SBQC Priori 01 /01108 Rapport d'evaluation 4 schemas directeurs des bassins versants technique des offres en

cours d'approbation 2. Recrutement d'un consultant pour la formation 15000 CI Post 05104/ 10

sur la maintenance, les techniques et outils de sui vi d'impacts des ouvrages CES/DRS

3. Recrutement d'un facilitateur pour Ie bassin 20000 QC Post 01 /01108 En cours versant de Greiguel (Assaba).

4 Recrutement d'un facilitateur pour Ie bassin 13000 QC Post 01101 /08 En cours versant de Saila (Hodh Chargui).

5 Recrutement d'un facilitateur pour Ie bassin 14000 QC Post 01101 /08 En cours versant de Beilougue Litama (Gorgol).

6 Recrutement d'un facilitateur pour Ie bassin 12000 QC Post 01101 /08 En cours versant de Ain Tangharada (Adrar).

7 Consultant national pour elaboration d'une 20000 CI Post 28/03/10 strategie de communication

8 Recrutement d 'un consultant pour I' elaboration 11 000 CI Post 20108/10 des conventions locales de gestion des RN

IV. Implementing Agency Capacity Building Activities with Time Schedule

1. In this section the agreed Capacity Building Activities (some items could be from CPAR recommendation) are listed with time schedule:

N Expected outcome / Estimated Estimated Start Date Comments o. Activity Description Cost $ (US) Duration

1 Suivi environnemental et social 11 030 Dne personne des projets et programmes 2 semaines 25/07110 formee

2 Conservation de la Biodiversite, 6975 Dne personne Preservation des Ressources 2 semaines 14/06/10 formee Naturelles et Gestion des Conflits terri ens

3 Conservation de la Biodiversite, 6975 2 semaines 14/06110 Preservation des Ressources Dne personne Naturelles et Gestion des Conflits formee terriens

4 Conservation de la Biodiversite, 6975 2 semaines 14/06110 Preservation des Ressources Dne personne Naturelles et Gestion des Conflits formee terri ens

5 Conservation de la Biodiversite, 6975 2 semaines 14/06/10 Preservation des Ressources Dne personne Naturelles et Gestion des Conflits formee terri ens

6 Audit et contrcle interne des Dne personne projets et programmes 9340 3 semaines 05/09110 formee

7 Passation des marches: Gestion et suivi des contrats 9340 3semaines 22/11110 Dne personne

formee 8 Management strategiques des 9640 2 semaines 13/06110 Dne personne

res sources humaines formee 9 Contrcle interne et manuel de

procedures dans Ie secteur public Dne personne 13650 3 semaines 16/05110 formee

TOTAL 80900