Steven Ramage Portfolio

download Steven Ramage Portfolio

of 13

Transcript of Steven Ramage Portfolio

  • 8/9/2019 Steven Ramage Portfolio

    1/29

  • 8/9/2019 Steven Ramage Portfolio

    2/29

  • 8/9/2019 Steven Ramage Portfolio

    3/29

    DESIGN

  • 8/9/2019 Steven Ramage Portfolio

    4/29

    T E C T O N I C SURBAN SCHOOL

  • 8/9/2019 Steven Ramage Portfolio

    5/29

    T E C T O N I C SURBAN SCHOOL

    objective Create a series of spaces andpaths using tectonic elements. Then try to adjust the spacesto t with an urban school pro-gram.

    conceptCreate layers of spaces thatform a centralized plan but alsoextend into the surroundingurban environment.

    proposalUse frame, plane and massto create different spaces thatoriginate from the center.

  • 8/9/2019 Steven Ramage Portfolio

    6/29

  • 8/9/2019 Steven Ramage Portfolio

    7/29

    T E C T O N I C SURBAN SCHOOL

    FLOOR PLAN

    SECTION

  • 8/9/2019 Steven Ramage Portfolio

    8/29

    L I T E R A R YC E N T E R

  • 8/9/2019 Steven Ramage Portfolio

    9/29

    L I T E R A R YC E N T E R

    objective Design a community literarycenter on a historic street inCincinnati.

    conceptA modern literary centerthat engages the street whilerespecting the historic integrityof the community.

    proposalLiterary center that guidespeople in from the street withits canted walls and is glassfacade.

    SECOND FLOOR PLAN

    FIRST FLOOR PLAN

  • 8/9/2019 Steven Ramage Portfolio

    10/29

  • 8/9/2019 Steven Ramage Portfolio

    11/29

    S C R E E NGROUP PROJECT

    objective Design a screen that could beincorporated into a commonspace at DAAP.

    conceptCreate a modular screenthat can be both rigid andorganic and can have multiplefunctions.

    proposalA module made of plywoodand seatbelt material that canbe arranged in many ways tocreate a screen or seat.

  • 8/9/2019 Steven Ramage Portfolio

    12/29

    DAAP COURTYARDR E D E S I G N

  • 8/9/2019 Steven Ramage Portfolio

    13/29

    DAAP COURTYARDR E D E S I G N

    objective Redesign the courtyard tomake it a more desirable andusable space for the school.

    conceptConnect the three existingbuildings around the courtyardwhile making the space moreusable and attractive.

    proposalA continuous hardscape thatprovides a circulation path,seating and overhead cover.

  • 8/9/2019 Steven Ramage Portfolio

    14/29

    DOCUMENTATION

  • 8/9/2019 Steven Ramage Portfolio

    15/29

    DAAP COURTYARDDOCUMENTATION

    description The DAAP courtyard iscomposed of three differentbuildings that come togetheron the north, east, and west.Our goal was to measure andthen document the existingsite using AutoCad.

    NORTH ELEVATION

    SOUTH ELEVATION

    EAST ELEVATION

    PLAN

  • 8/9/2019 Steven Ramage Portfolio

    16/29

    S T A R L I G H T T H E A T R EDOCUMENTATION

    descriptionUse AutoCad to draw a plan,elevation and section of theBengt Sjostrom Starlight Theatre by Studio GangArchitects.

    FIRST FLOOR PLAN

  • 8/9/2019 Steven Ramage Portfolio

    17/29

    S T A R L I G H T T H E A T R EDOCUMENTATION

    EAST ELEVATION

    SECTION

  • 8/9/2019 Steven Ramage Portfolio

    18/29

    Farnsworth HouseDocumentation

    descriptionUse Rhino 3D to draw anddocument the FarnsworthHouse by Mies Van Der Rohe.

    EXPLODED VIEW FLOOR PLAN

    RENDERING

  • 8/9/2019 Steven Ramage Portfolio

    19/29

    Farnsworth HouseDocumentation

    RIVERSIDE ELEVATION

    LINE PERSPECTIVE

    I I I

    II

  • 8/9/2019 Steven Ramage Portfolio

    20/29

  • 8/9/2019 Steven Ramage Portfolio

    21/29

    R E T A I L / O F F I C EB U I L D I N G

    responsibilities• AutoCad Drawings(Elevations and Plans)

    • Photoshop Renderings

    RIVERSIDE ELEVATION

    LINE PERSPECTIVE

  • 8/9/2019 Steven Ramage Portfolio

    22/29

    F L A V O RL A B O R AT O RY

    F L A V O R

  • 8/9/2019 Steven Ramage Portfolio

    23/29

    F L A V O RL A B O R AT O RY

    responsibilities• AutoCad ConstructionDrawings (Plans, Sections,Elevations, Details)

    • Revit Model• Perspective Views• Photoshop Renderings INTERIOR RENDERING

    INTERIOR PERSPECTIVE

    FIRST FLOOR PROGRAM

    SECOND FLOOR PROGR

    H U M A N

  • 8/9/2019 Steven Ramage Portfolio

    24/29

    H U M A NR E S O U R C E SO F F I C E

    H U M A N

  • 8/9/2019 Steven Ramage Portfolio

    25/29

    H U M A NR E S O U R C E SO F F I C E

    responsibilities• AutoCad Construction

    Drawings (Plans, Sections,Elevations, Details)

    • Assisted with Accent WallDetail and Design

    • Revit Model• Design Development

    Itterations• Perspective Views• Photoshop Renderings• Attended Client Meeting

  • 8/9/2019 Steven Ramage Portfolio

    26/29

    PERSONAL

    CHICAGO TRIP

  • 8/9/2019 Steven Ramage Portfolio

    27/29

    CHICAGO TRIPARCHITECTUREPHOTOGRAPHY

    A. Chicago Auditorium interior

    by Adler and Sullivan

    B. The Rookery staircase byBurnham & Root

    C. The Rookery staircase byBurnham & Root

    D. Jay Pritzker Pavilion byFrank Gehry

    E. Carson Pirie Scott buildingby Louis Sullivan

    F. James R. Thompson Centerby Murphy/Jahn Architects

    G. Willis Tower by Skidmore,Owings & Merrill

    A

    B

    C

    D

    E

    D

    S K E T C H E S

  • 8/9/2019 Steven Ramage Portfolio

    28/29

    S K E T C H E S

  • 8/9/2019 Steven Ramage Portfolio

    29/29

    THANK YOUfor viewing my portfolio