Planck Simulations

Status of the ApplicationC. Vuerli, G. Taffoni, A. Barisani, A. Zacchei, F. Pasian

INAF – Information Systems Unit and OA Trieste

Geneve, 1 March 2006

Page 2: Planck Simulations

Wednesday 1 March 2006 2

Enabling Grids for E-sciencE

INFSO-RI-508833

Outline

• Description of the Application and Scientific goals• The Grid added value• Experiences and results with using the EGEE

infrastructure• Future perspectives and issues for use of Grid

Technology• Summing up status

Page 3: Planck Simulations

Wednesday 1 March 2006 3

Enabling Grids for E-sciencE

INFSO-RI-508833

DescriptionThe Planck Mission

• Measure cosmic microwave background (CMB)– succeeds COBE, Boomerang & WMAP missions– aims at even higher resolution

• Timeline– launch August 2007– start of observations 2008– duration >1 year

• Characteristics– continuous data stream (TOD)– large datasets

(a TOD of ~7 TB for the whole LFI mission)– changing calibration (parameters configuration)– high-performance computing for data analysis

Page 4: Planck Simulations

Wednesday 1 March 2006 4

Enabling Grids for E-sciencE

INFSO-RI-508833

DescriptionCOBE & Planck

Page 5: Planck Simulations

Wednesday 1 March 2006 5

Enabling Grids for E-sciencE

INFSO-RI-508833

DescriptionBrief introduction

• Goal: make possible N simulations of the whole Planck/LFI mission (~14 months), each time with different cosmological and instrumental parameters

• Full sky maps production for frequencies 30-857 GHz by means of two complete sky surveys

• Sensitivity of a few μK per pixel 0,3° in amplitude• 22 channels for LFI, 48 for HFI• Data volume produced at the end of the mission: ~2TB

for LFI and ~15TB for HFI• Computing requirements: ~100Tflops for raw data

reduction, foregrounds extraction and CMB maps creation

Page 6: Planck Simulations

Wednesday 1 March 2006 6

Enabling Grids for E-sciencE

INFSO-RI-508833

DescriptionThe Level-S

• Purpose of the Level-S:– ground checks (pre-launch phases);– DPCs Pipelines tuning;– control check & corrections (operational phase).

• Pipeline chained but not parallel(43 executables and a few libraries)

• Languages used are C/C++/Fortran/F90;• Shell/Perl for scripts;• Typical application that benefits by distributed

computing techniques• Porting of Monte Carlo simulation code by Sam Leach

Planck simulation is a set of 70 instances of the Pipeline (22 for LFI and 48 for HFI)

Page 7: Planck Simulations

Wednesday 1 March 2006 7

Enabling Grids for E-sciencE

INFSO-RI-508833

DescriptionThe Level-S

CMB Power Spectrum(cmbfast)

CMB mapsDataanalysis

CMB Map(synfast)

Foregrounds andBeam Patterns

Instrumental Noise Scanning Strategy

TOD

Missionsimulation

Page 8: Planck Simulations

Wednesday 1 March 2006 8

Enabling Grids for E-sciencE

INFSO-RI-508833

DescriptionOur application in summary

• Is it parallel? NO it runs concurrently.

• Do we need MPI/parallel? Yes. In later phase for data analysis (16/32 CPUs in the site).

• Do we produce data? YES, we have an intensive data production. Can be more than 1 PB.

• How long does it run? From 6h (short) up to 36h (long)

• Access to/exchange of data coming from other experiments (IVOA, MAGIC)

Page 9: Planck Simulations

Wednesday 1 March 2006 9

Enabling Grids for E-sciencE

INFSO-RI-508833

Grid added valuesCPUs and Data

• CPU power:– E-computing lab;– Production burst;– Efficient CPU usage/sharing.

• Data storing/sharing:– Distributed data for distributed users;– Replica and security;– Common interface to software and

data.

Planck simulations are highly computing demanding and produce a huge amount of data. Such resources cannot be usually afforded by a single research institute, both in terms of computing power and data storage space.

Page 10: Planck Simulations

Wednesday 1 March 2006 10

Enabling Grids for E-sciencE

INFSO-RI-508833

Grid added valuesQualitative view

• Native collaboration tool;• Common Interface to the users;• Flexible environment;• New approach to data and S/W sharing;• Collaborative work for simulations and reduction:

– less time, less space, less frustration….

• VObs view:– Sharing data over a shared environment;

• Native authentication/authorization mechanism;• A federation of users within a VO fosters the scientific

collaboration;• Collaborative work between different applications.

Page 11: Planck Simulations

Wednesday 1 March 2006 11

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsFirst Tests

• First tests performed on a workstation aimed at identifying the computational and storage needs of the simulation SW in detail

LFI 30GHz LFI 44GHz LFI 70GHz

short long short long short long

12 m 389 m 13 m 623 m 17 m 834 m

0.9 GB 34.2 GB 1.2 GB 45.3 GB 1.7 GB 75 GB

Total

long short

255.7 h 1.3 TB 5.5 h 31 GB

Computational time on a dual CPU 2.4 GHz workstation with 2 GB of RAM

for the whole simulation of the LFI mission[4 radiometers at 30 GHz, 6 at 44 GHz and 12 a 70 GHz]

Page 12: Planck Simulations

Wednesday 1 March 2006 12

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsGrid Environment

• To allow users to run Planck simulation SW we need to create some specific services on Grid general environment;

• They must be used to run both one or more SDPs (Single Detector Pipeline) or the whole MSJ (Mission Simulation Job);

• They are modular and easy to integrate with new pipeline stages when some upgrade is needed (this is necessary if we want to allow users to develop new codes).

Page 13: Planck Simulations

Wednesday 1 March 2006 13

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsGrid Environment

• Step 1: Deployment of the simulations code on the Grid as RPMs. In this first test however we used the Replica Manager to copy and register the SW.

• Step 2: Creation of an application specific environment on top of the UI: a set of Perl scripts are available allowing a user to configure a pipeline and submit it to the Grid.

• Step 3: Implementation of a metadata description to identify the cosmological and instrumental parameters and to associate them to the GUID of a complex output file (TODs, maps, noise contributions etc.) Important for post processing analysis.

Page 14: Planck Simulations

Wednesday 1 March 2006 14

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsGrid Environment

Page 15: Planck Simulations

Wednesday 1 March 2006 15

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsSimulations description

• A number of test simulations of the MSJ run with the same parameters used on the dual-CPU WS;

• Initially selected only the Grid sites equipped with Xeon WNs at CPU speed of ~2400 and sites with at least 1 free CPU;

• Run sets of MSJ with different degree of parallelization;• Tests repeated 30 times under different load conditions of the Grid

to verify the stability of both the submission tools and of the Grid environment.

• We noticed that RB usually assigns each SDP to a different site, so the MSJ runs on a truly distributed environment. However, a few times the jobs were assigned to the same site but to different WNs. As expected, no significant benefit or decay in performance was noticed in those cases. Also different Grid load did not change significantly the results.

Page 16: Planck Simulations

Wednesday 1 March 2006 16

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsSimulations description

• Set of tests involving the whole computing power and data storage available to our VO (~5000 CPUs of different kind). Submission of 100 concurrent MSJs from different UIs with the only requirement of finding enough free disk space to save the output.

• Tests span two years starting from summer 2004 and using different versions of the MW (2.2, 2.4 and 2.6) and within different VOs

• The whole test lasts for ~3 days and was repeated different times under different load conditions of the Grid with no significant change in the results

• Long simulations could require to modify CFTSIO to allow I/O directly on Grid through GridFTP

Page 17: Planck Simulations

Wednesday 1 March 2006 17

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsSimulations workflow/1

Page 18: Planck Simulations

Wednesday 1 March 2006 18

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsSimulations workflow/2

Page 19: Planck Simulations

Wednesday 1 March 2006 19

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsScalability on Grid

0

100

200

300

400

500

600

700

1 2 4 8 16 22

Number of Worker Nodes

Tim

e [

m]

StartTime

SaveTime

ExecTime

Page 20: Planck Simulations

Wednesday 1 March 2006 20

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsPost-processing example

• To verify the possibility of using the stored TODs for some kind of post-processing we applied the destriping algorithm on the TODs produced during the short runs.– Metadata are used to locate the files and to identify their GUIDs.– The configuration/submission Planck tools are modified to create

a JDL with the input-file option that points to the TOD GUID.– The input-file option is used by the RB to force the job to run in

the Grid site where the input data are stored. This optimizes the data transfer which is in this way restricted to the site LAN.

– The Grid "configurator" is modified to download any input data file specified in the input-file option before running the pipeline.

Page 21: Planck Simulations

Wednesday 1 March 2006 21

Enabling Grids for E-sciencE

INFSO-RI-508833

Experiences and ResultsPost-processing example

• The “destriping” procedure runs for ~20 minutes for 30 GHz channel up to ~40 minutes for the 70 GHz channel on a dual AMD workstation.

• On Grid the run time for a simulations set of 22 radiometer is ~55 minutes with a gain of a factor of 10 in performances compared with times required on the workstation.

Page 22: Planck Simulations

Wednesday 1 March 2006 22

Enabling Grids for E-sciencE

INFSO-RI-508833

observed sky after de-striping

map of de-striping residuals

param

maps maps

maps, TOD maps, TOD

param

Node 1

Node k

User Node

CE CE

WNWN ...

Experiences and ResultsPost-processing example

Workstation Grid Gain

short 330 m 25 m 13

long 15342 m 955 m 16

Dual CPU WS 2,4 GHz with 2 GB di RAM vs. Grid

Page 23: Planck Simulations

Wednesday 1 March 2006 23

Enabling Grids for E-sciencE

INFSO-RI-508833

Future Perspectives and IssuesProC and G-DSE

• ProC is a scientific workflow engine developed in the framework of IDIS (Integrated Data and Information System) collaboration

It executes “pipelines” of modules• Workflows, directed “acyclic” graphs

It allows the assembly of Pipelines using building block modules• Modules may be heterogeneous (FORTRAN, C, C++, Java, Python,

GDL/IDL, ...); also sub-pipelines It is a data-driven, forward-chaining system

– It has components for ... graphical editing of workflow layouts checking for consistency & completeness Execution

• The G-DSE makes of databases a new embedded resource of the Grid. It enables a new Grid QE to access databases and use them for data analysis (see presentation by G. Taffoni on Thu March 2nd, 2006, at 2.00 PM “Data Access on the Grid” session)

Page 24: Planck Simulations

Wednesday 1 March 2006 24

Enabling Grids for E-sciencE

INFSO-RI-508833

Future Perspectives and IssuesPlanck VO Evolution

• Users who joined the VO 15-30 members; • UI in each site;• Quantum-Grid in each site;

Regional Area Current status Future status

R.A.: Italy 15 CPUS 300 GB 15 + 45 CPUS 1 TB (total). All INAF sites are now in the startup phase

R.A.: Spain 30 CPUS 240 GB more

R.A.: France none 6 CPUS 360 GB (total)

R.A.: UK none 2 CPUS 240 GB (total)

R.A.: Germany none 2 CPUS 240 GB (total)

R.A.: The Netherlands none 2 CPUS 240 GB (total)

• VO Planck may currently rely on ~5000 available CPUs

Page 25: Planck Simulations

Wednesday 1 March 2006 25

Enabling Grids for E-sciencE

INFSO-RI-508833

Future Perspectives and Issues Open issues

• Technical and administrative management of the VO OK• Basic gridification of the Application OK• Main issues met in 2005

– Slow startup process of Planck VO Slow start up of interactions between Planck VO site managers and

national ROCs Some technical initial problems (e.g. VOMS) The management of the VO has proved to be more complex with respect

our expectations Heterogeneous VO

– Some problem on WN environment– Metadata = DSE (work in progress)– Grid-FS complicated and not user-friendly– Debugging

Page 26: Planck Simulations

Wednesday 1 March 2006 26

Enabling Grids for E-sciencE

INFSO-RI-508833

Future Perspectives and Issues Effects/corrective actions

• …therefore:– Still missing shared resources within the VO– The gridification of Planck pipelines has still to be completed– Until now extensive tests involving all nodes of the VO were not

possible

• Corrective action– On-site (at VO sites) meetings and training events (involving

Planck and INAF VOs) addressed to site managers and users and scheduled for the next months for a: Fast startup of VO nodes with new shared resources available; Gridification of new pipelines; Extensive tests within the VO.

• Future strictly dependent from a number of factors: gLite (!?!), support (?), EGEE-2 (?)

Page 27: Planck Simulations

Wednesday 1 March 2006 27

Enabling Grids for E-sciencE

INFSO-RI-508833

Summing up status

• VO Setup: Management; Technical Management;

VO manager; Site managers;

RLS; VOMS; RB Planck users cert; Planck sites setup; EGEE site support.

• Application Setup: Basic Gridification; First tests;

INFN production Grid; Benchmarks;

Extended gridification; Data&metadata (GDSE!!!); ProC & DMC gridification; Tests:

Runs; Data;

Page 28: Planck Simulations

Wednesday 1 March 2006 28

Enabling Grids for E-sciencE

INFSO-RI-508833

End of Presentation

End of Presentation

Thank you for your attention