MegaTonne
description
Transcript of MegaTonne
MegaTonne
Durée de vie du proton
neutrinos de supernovae
CERN
Fréjus
CPV neutrinos
C. CavataSaclay
Les projets Tera-grammes
HYPER-KUNO
MenPhys
Collaboration internationaleautour de SuperK
HYPER-K
UNOMenPhys
Cerenkov à eau d’une megatonne
HyperK
48m × 50m ×500m, Masse Totale = 1,2 Mton
Options pour HyperK
# modulesVolumetotal
Volumefiduciel
DensitéPMT
#PMT
1 8 1Mton 0.57Mton 1PMT/m2 100k
2 8 1Mton 0.57Mton 2PMT/m2 200k
3 16 2Mton 1.15Mton 1PMT/m2 200k
4 16 2Mton 1.15Mton 2PMT/m2 400k
•Densité de PM à optimiser pour• tagging pour pK+ search, rejection 0 en e
•Volume à maximiser versus • site, stabilité de la caverne• Cout et durée excavation• Cout et durée de production des photo-senseurs
UNO
52k PMT [10%,40%,10%]
E > [10,5,10] MeV 60m x 60m x 180m
0.648 MT
http://superk.physics.sunysb.edu/nngroup/uno/
MenPhysGrand LSM
70 x 70 x 250106 m3
Masse Totale 1 Mton
Tunnel existant
Future Galerie
de sécurité
LSM
SoutienINFNIN2P3
DAPNIA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
70m x 70m x 250m
GLSM
13 km
Une tradition en France ?
DVP1982-1987
Limites de SuperK τ/B(p→e+π0) > 5.0 × 1033 years (90% CL) τ/B(p→ν K+) > 1.9 × 1033 years (90% CL)Prédictions théoriques interactions à 4 fermions
interactions à 2 fermions – 2 sfermions (SUSY)
g4 mp4
Γ = : τ(p→e+π0) = 1035±1 years MX
4
h 4 mp4 ____
Γ = : τ(p→K+ν) = 1029-35 years MHx
2 MX2
Temps de vie du proton
Il faut atteindre les 1035 ans !
_
Temps de vie du proton
(p e0) >1035ans (90%CL) en 6Mt.yr
BGSK=2.2ev/Mty
UNO-II
(p e0) =1035ans
Temps de vie du proton
BG=1ev/Mty
(p K+ ) >2 1034ans(90%CL) en 6Mt.yr
Fréjus
Explosion de SN @ la maison
Fréjus
Explosionau centre
de la Galaxie@ 10kpc
(9 k @ SK)e
_
140k
3±1 SN/siècle …
Explosion de SN en banlieue
La SN1987A
19evts/4kt2k evts/400kt
Trou Noir
Explosion de SN @ Andromède
900 kpc
e
_
17
Oscillation des neutrinos
• 3 masses : m1, m2, m3
• 3 angles de mélanges : 12, 23, 13, • 1 Phase Dirac CP : • Dirac or Majorana ?
•2 Phases Majorana CP : 1,2
Saveur
e
e
Masse
1
mm11 mm22 mm33
Pontecorvo-Maki-Nakagawa-Sakata
3
2
1CPMPMNSVU
e
100
0
0
0
010
0
0
0
001
U 1212
1212
1313
1313
2323
2323PMNS cs
sc
ces
esc
cs
sci
i
100
0e0
00e
V 2
1
i
i
CPM
CP Dirac Phase ei
)12
(3R)13
(2
R)23
(1
R UPMNS
Ce qu’il reste à mesurer
m212
Solar+KamLAND6.10-5<m2
12(eV2)<2.10-4
KamLAND (5 ans)m2
23 (eV2) = 0.4 10-5
m223
SK+K2K1.3 10-3 <m2
23 (eV2) < 3 10-3
MINOS+OPERAm2
23 (eV2) = 10-4
12 Solar+KamLAND 0.2<sin212<0.5
23 SK 0.9<sin2223<1
13 sin2213<0.1 (CHOOZ)
CP
Mass Hierarchy
Majorana/Dirac
mm<6.6 eV (Mainz)
Violation de CP en neutrinos
1213
12CP
CP
sinsin
2sinsinA
)P(ν)ννP(
)P(ν-)ννP(A
ee
ee
13CP13
2e sinθ
1A ; 2θsin)N(ν
Psol={cos213(1-(1+sin213)sin223 }sin2212sin212
Patm=sin223 sin2213[sin212sin223+cos212sin213]
P(→e)=Patm+ Psol+ PCPC+ PCVP
PCPC = J cos sin12sin13cos23PCPV = J sin sin12sin13sin23J = cos13sin212sin213sin223
Contraindre 13 d’abord !
Violation de CP en neutrinos
1213
12CP
CP
sinsin
2sinsinA
)νP(ν)ννP(
)νP(ν-)ννP(A
ee
ee
Quesaco ?
• Faisceau conventionnel (K2K, CNGS,MINOS) Driver proton P < .4 MW
Cornes
= 2o
Cible
Decay Pipe,K
Faisceauprotons
ACP<< 1 (sin)beaucoup d’événementsHyper-Faisceau
• Super faisceau : conventionnel , avec P ~ 1 MW (JHF Phase I)
• Hyper faisceau : P ~ 4 MW (SPL, JHF-II, OffAxis NUMI, BNL … )
4MW,1Mt2.0yr en 6.8yr en
Limites à 3
>~27o
>~14o
HyperK
A plus long terme
beam
e Li He e
_66
e F Ne e1818
100 GeV SPS
e e
_
e+ e
_ e_
CC -Oscillation e
CC + : WSM
L’usinede
neutrinos
Région à 99% CL pour voir une violation de CP maximale
R&D Photo-senseurs @ Japon M. Shiozawa
(ICRR, Univ. of Tokyo)
1. PM • Augmenter QE
• optimiser matériaux de la cathode,• optimiser la méthode de production
• PM + grands (30-40inch) PMTs
2. photo-détecteurs hybrides (HPD)• photo-cathode + AD(diode à avalanche )• structure simple faible coût ?• résolution en temps ( ~ 1ns)• séparation du « single p.e. »
5 inch HPD prototype5in
ch
sensi
tive a
rea 8
0m
mφ
e
APD 3mmφ, GNDbias voltage 150V
photo-cathode –8kV
100% coll. efficiency cathode 80mmφ 3mmcathode 120mmφ 10mm
• need higher voltage• larger AD• spherical cathode
electron bombarded gain 1000 ×avalanche gain 50 = 50,000
5 inch HPD prototype
pulse height distribution (dark current)
• good single p.e. peak• dark rate is 24kHz
measured quantum efficiency time response
5 inch HPD prototype
Spherical HPD
glass photocathode
reflector
diode-1
diode-2
light
photoelectrons
Lead and support
• high efficiency• simple structure low cost high production rate• pressure resistant
Perlite insulation
≈70 m
h =20 m
Electronic crates
100kT LAr TPC
André Rubbia, ETH Zürich(ICARUS Collaboration)
The “dedicated” cryogenic complex
External complex
Heatexchanger
Joule-Thompsonexpansion valve
W
Q
Argonpurification
Air
Hot GAr
Electricity
Underground complexGAr
LAr
LN2, …
≈300‘000 kg LAr = T300
ICARUS T300 cryostat (1 out of 2)
Run 960, Event 4 Collection Left
25 cm
85 cm
ICARUS T600: cosmic rays on surface
176
cm
434 cm
Run 308, Event 160 Collection Left
265 cm
142 cm
Muon decay
Shower
Hadronic interaction
Cryogenic storage tanks for LNG
Proton decay: Sensitivity vs exposure
pe+0
pK+
1034
1035
1 year exposure !
65 cm
p K+ e
p=425 MeV
Prix actuel20M€/kt
« 0ptimal » schedule for MenPHys
Safety Tunnel
Large Cavity
R&D PMT’s, etc.
PMT’s production
2003 2004 2007 2008 2012 2015 2020
Detector installation
Start Megaton Physics
Hyper-faisceau @ CERN
Procedure :
Beta-beam realization
excavation
excavation
R&D PMT’s, etc
PMT’s production
Detector install.
Start Megaton Physics ………………….
SPL+Super-beam realization
EoI
Year
?
Beta-beam realization ?
studyPre-study
LoI Prop. Approv.
Adapté de Luigi Mosca
Estimation des coûts (NUFACT02)
"Educated guess" DETECTEUR "UNO" 430 M€CAVITE 170 M€SUPERBEAM LINE 60 M€SPL 190 M€
TOTAL 850 M€
OPTION BETA BEAM 450 M€
L'enjeu est de taille pour la communauté scientifique et la région marseillaise. Sur trente ans, près de 10 milliards d'euros seront dépensés pour concevoir et faire tourner à Cadarache une installation capable de mettre l'énergie des étoiles dans une bouteille et développer une source d'énergie quasi inépuisable. Quant au président de la région Provence-Alpes-Côte d'Azur, Michel Vauzelle (PS), dont l'institution est prête à apporter 152 millions d'euros par an au projet pendant dix ans, il estime que c'est d'abord "la qualité du tissu scientifique régional" qui a permis ce choix. Les collectivités locales se sont fortement investies : 46 millions d'euros par an durant une décennie pour la réalisation de toutes les infrastructures nécessaires au réacteur.
Soyons optimistes !!
Assuming null oscillation
SK atmospheric latest results
68% C.L.
90% C.L.
99% C.L.
FC + PC + up-going
combined
Preliminary!
1489 days
Best fit
Assuming oscillation
2min = 170.8/170 d.o.f.
at (sin22 m2)
= (1.0,2.0 x 10-3 eV2)
90% confidence levelallowed region
sin22> 0.9
1.3x10-3 < m2 <3.0x10-3
(eV2)
2 = 445.2/172 d.o.f.
Hayato-san, AAchen 2003
40m
41
.4
m
50 kt Cerenkov eau
(22.5 kton volume fiduciel)
11146 (50cm) + 1885 (20cm) PM
•Mesure de E(Oscillation)
•Discrimination /e (apparition)
• 0 rejection (apparition)
SK : Principe de détection
Europe: SPLFrejusG
enev
e
Italy
130km
40kt400kt
CERN
SPL @ CERN2.2GeV, 50Hz, 2.3x1014p/pulse 4MWNow under R&D phase
½ s
in22
~JHF2-HK 1yr
Sensitivity for Mixing Angle
2.3o
1.7o
1o
Le JHF
JHF-1 NuMI K2K
E(GeV) 50 120 12
Int(1012ppp) 330 40 6
Rate(Hz) 0.275 0.53 0.45
P(MW) 0.75 0.41 0.0052
Target Station
Primary Proton beamline
(R=106m)
Beam Axis
SK
280m Near Detector 50GeV PS
Single turn fast extraction
8 bunches/~5s
10-6 Duty cycle
1an=1021POT
Decay
Volume
Estimation des coûts SK UNO
Study of the Cavity
Preliminary Study
3 months (this year)90 k€
30 k€ (IN2P3 + CEA)
30 k€(Regione Piemonte)
30 k€(Région Rhône-Alpes)
Design Study (European Network)
Large Underground International Laboratory