La Grille EGEE

22
EGEE-II INFSO-RI- 031688 Enabling Grids for E-sciencE www.eu-egee.org EGEE and gLite are registered trademarks La Grille EGEE Pierrick Micout, CEA – DSM - DAPNIA

description

La Grille EGEE. Pierrick Micout, CEA – DSM - DAPNIA. Plan. Introduction au projet EGEE (transparents de Bob Jones) EGEE du point de vue technique (transparents d’Erwin Laure). Introduction. EGEE/EGEE-II transition meeting Bob Jones, EGEE-II Project Director CERN [email protected]. - PowerPoint PPT Presentation

Transcript of La Grille EGEE

Page 1: La Grille EGEE

EGEE-II INFSO-RI-031688

Enabling Grids for E-sciencE

www.eu-egee.org

EGEE and gLite are registered trademarks

La Grille EGEE

Pierrick Micout, CEA – DSM - DAPNIA

Page 2: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

Plan

• Introduction au projet EGEE (transparents de Bob Jones)

• EGEE du point de vue technique (transparents d’Erwin Laure)

Page 3: La Grille EGEE

EGEE-II INFSO-RI-031688

Enabling Grids for E-sciencE

www.eu-egee.org

EGEE and gLite are registered trademarks

Introduction

EGEE/EGEE-II transition meeting

Bob Jones, EGEE-II Project [email protected]

Page 4: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

The EGEE project• EGEE

– 1 April 2004 – 31 March 2006– 71 partners in 27 countries, federated in regional Grids

• EGEE-II– 1 April 2006 – 31 March 2008– 91 partners in 32 countries – 13 Federations

• Objectives– Large-scale, production-quality

infrastructure for e-Science – Attracting new resources and

users from industry as well asscience

– Improving and maintaining “gLite” Grid middleware

Page 5: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

EGEE Mission

• Infrastructure– Manage and operate production Grid for European Research Area– Interoperate with e-Infrastructure projects around the globe– Contribute to Grid standardisation efforts

• Support applications from diverse communities– Astrophysics– Computational Chemistry– Earth Sciences – Finance– Fusion– Geophysics– High Energy Physics– Life Sciences– Multimedia– …

• Business– Forge links with the full spectrum of interested business partners

+ Disseminate knowledge about the Grid through training+ Prepare for sustainable European Grid Infrastructure

Page 6: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

A global, federated e-Infrastructure

EGEE infrastructure~ 200 sites in 39 countries~ 20 000 CPUs> 5 PB storage> 10 000 concurrent jobs

per day> 60 Virtual Organisations

EUIndiaGrid

EUMedGrid

SEE-GRID

EELA

BalticGrid

EUChinaGridOSGNAREGI

Page 7: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

EGEE – What do we deliver?• Infrastructure operation

– Currently includes >200 sites across 39 countries– Continuous monitoring of grid services in a

distributed global infrastructure– Automated site configuration/management

• Middleware– Production quality middleware distributed under

business friendly open source licence

• User Support - Managed process from first contact through to production usage– Training– Documentation – Expertise in grid-enabling applications– Online helpdesk– Networking events (User Forum, Conferences etc.)

• Future– Expand on interoperability with related infrastructures

Page 8: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

Related EU projects

EUGRIDGRID

Di l i gentA DIgital Library Infrastructureon Grid ENabled Technology

ISSeG

BEinGRID

Page 9: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

EGEE-II Activities

• Service Activities– SA1 – Grid Operations, Support

and Management (CERN)– SA2 – Networking Support (CNRS)– SA3 – Integration, Testing and

Certification (CERN)• Joint Research Activities

– JRA1 – Middleware Re-engineering (INFN)– JRA2 – Quality Assurance (CS-SI)

• Networking Activities– NA1 – Management (CERN)– NA2 – Dissemination, Outreach and

Communication (CERN)– NA3 – Training and Induction (UEdin)– NA4 – Application Identification and Support (CNRS)– NA5 – Policy and International Cooperation (GRNET)

Page 10: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

Industry and EGEE-II

• Industry Task Force– Group of industry partners in the project– Links related industry projects (NESSI, BEinGRID, …)– Works with EGEE’s Technical Coordination Group

• Collaboration with CERN openlab project– IT industry partnerships for hardware and software

development

• EGEE Business Associates (EBA)– Companies sponsoring work on joint-interest subjects

• Technical developments & Transfer of know-how and services to industry• Business modelling• Exploitation strategies & Market Surveys

• Industry Forum– Led by Industry to improve Grid take-up in Industry– Organises industry events and disseminates grid information

Page 11: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

EGEE-II Project Office

– Bob Jones – Project Director– Dieter Kranzlmueller – Deputy Project Director (until July’06)– Erwin Laure – Technical Director– Kristina Gunne – Directors’ Assistant– Anna Cook – Project Secretary– Dita Mocova – Finance Officer– Karin Burghauser – User registration and related projects– Marie-Laure Bourgeois-Schutz – User registration and web admin– Frank Harris – Network activities coordination – Hannelore Hämmerle – NA2 activity manager– Owen Appleton – NA2– Jo Lawson – NA5– Florida Estrella Cainglet, Roberta Faggian Marque - Related

projects– Yari Estublier - Intern

Page 12: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

Sustainability: Beyond EGEE-II

• Need to prepare for permanent Grid infrastructure– Maintain Europe’s leading position in global science Grids– Ensure a reliable and adaptive support for all sciences– Independent of project funding cycles– Modelled on success of GÉANT

Infrastructure managed in collaboration with national grid initiatives

Sustainable e-Infrastructure

Page 13: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

Important EGEE-II events

EGEE final review (CERN)

EGEE-II periodic review

EGEE-II start1 April 2006

23-24 May 2006

25-29 Sept 2006

31st March 2008 EGEE-II completion

1st Project Conference (Geneva)

May 2007

May 2008 EGEE-II final review

Autumn 2007

1st User Forum event (Manchester)

2nd User Forum event

2nd Project Conference (Budapest)

7-11 May2007

Q1 2008

Prepare organisation to manage sustainable infrastructure

27 April 2006 Industry day (Paris)

Page 14: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

Summary

• EGEE Infrastructure – world’s largest multi-science production grid service

• EGEE-II is the opportunity to expand on this existing base both in terms of scale and usage

• Use this transition meeting as the occasion to meet your fellow partners and clarify any grey areas in the programme of work

• Need to prepare the long-term– EGEE, related projects, national grid initiatives and user

communities are working to define a model for a sustainable grid infrastructure that is independent of project cycles

Page 15: La Grille EGEE

EGEE-II INFSO-RI-031688

Enabling Grids for E-sciencE

www.eu-egee.org

EGEE and gLite are registered trademarks

Technical Overview

EGEE/EGEE-II transition meeting

Erwin Laure, EGEE-II Technical [email protected]

Page 16: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

EGEE-II Activities

• Service Activities– SA1 – Grid Operations, Support

and Management (CERN)– SA2 – Networking Support (CNRS)– SA3 – Integration, Testing and

Certification (CERN)• Joint Research Activities

– JRA1 – Middleware Re-engineering (INFN)– JRA2 – Quality Assurance (CS-SI)

• Networking Activities– NA1 – Management (CERN)– NA2 – Dissemination, Outreach and

Communication (CERN)– NA3 – Training and Induction (UEdin)– NA4 – Application Identification and Support (CNRS)– NA5 – Policy and International Cooperation (GRNET)

Page 17: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

Activity Ecosystem

SA2 – Networking Support

SA1 – Grid Operations, Supportand Management

JRA

2 –

Qu

alit

y A

ssu

ran

ce

JRA1 – Middleware Re-engineering

SA3 – Integration, Testing and Certification

NA4 – Application Identification and Support

NA5 – Policy and International Cooperation NA

2 – Dissem

inatio

n, O

utreach

and

C

om

mu

nicatio

n

NA

3 – Train

ing

and

Ind

uctio

n

NA1 – Management

Page 18: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

EGEE-II Cross-Activities Groups• Security

– MWSG Consistent usage of security framework in m/w Coordination with related projects

– JSPG Operational security issues Coordination with related projects

– Vulnerability Gruop– Security head (Ake Edlund) is part of the PEB

• VO Support– OAG

Resource allocation to VOs– UIG

Organization of EGEE documentation– VO Managers Group – NEW!

Link between the project and VOs• Industry Relations

– Industry Forum– Industry Task Force – NEW!

• Technical Coordination – TCG – NEW!– See later

Page 19: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

EGEE-II Program of Work

• Formally defined in DoW: https://edms.cern.ch/document/684101/ • Defines 51 deliverables and 89 milestones

– Deliverables have hard deadlines – any slip needs to be communicated to EU well in advance

– Contain quarterly and periodic (1 year) reports (QR and PR)– Will be reviewed internally to assure they are of high quality– EU will evaluate us against deliverables; achievement of milestones

needs to be reported to EU in quarterly reports

• Plan enough time to prepare these documents and allow for activity internal review

• Details can also be found at http://egee-jra2.web.cern.ch/EGEE-JRA2/EGEE-II/Deliverables/DeliverablesScope.htm

Page 20: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

Highlights of EGEE-II

• Increased Application Support (NA4)• Revamped Industry Forum and Industrial Task Force

(NA2)• Multi-platform support and Interoperability (SA3)• Streamlined integration and testing (SA3)• Unified middleware release – gLite 3.x• More visibility at high profile events like

supercomputing (NA2)• Focus on reliability, deployability, security (JRA1)• Related projects provide

– Expansion of infrastructure– Application support– Integration and Test facilities– Extension of training towards more generic Grid education

Page 21: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

EGEE-II Technical Coordination

• The EGEE-II proposal defines a Technical Coordination Group (TCG):

The TCG brings together the technical activities within the project in order to ensure the oversight and coordination of the technical direction of the project, and to ensure that the technical work progresses according to plan.

• Basically coordinating the work of SA1, SA2, SA3, NA4, and JRA1– Membership from all these activities but still remain a “small” team– Additional experts will join based on the topic of discussion– Working groups will be spawn off to solve specific problems

• Focus on practical short term solutions– Long term projects will be sourced out to middleware providers

• The group defines the technical direction of EGEE– Not just a discussion forum!– Decisions taken by the group must be honoured by the affected

activities

Page 22: La Grille EGEE

Enabling Grids for E-sciencE

EGEE-II INFSO-RI-031688

Summary

• EGEE has a demanding program of work– Can build on a solid basis– EGEE-II is really a continuation project, not a new one

• Make sure all partners collaborate in your activities– Execution plan and define partner responsibilities – Partner metrics will be introduced

• EGEE continues to be the flagship Grid infrastructure project of EU– This brings a number of responsibilities

Concertation, standardization, interoperability with related projects etc. Make sure this effort is part of your plans

• Success of EGEE will be decisive for long-term sustainability of Grid infrastructures– EGEE, related projects, national grid initiatives and user communities

are working to define a model for a sustainable grid infrastructure that is independent of project cycles