Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum -...

24
805194NZ 11.17 v1.04 Page 1 of 16 Zenith Autoboil 315652 Zenith Autoboil 15 Litre White 313651 Zenith Autoboil 15 Litre Stainless Steel 325652 Zenith Autoboil 25 Litre White 325651 Zenith Autoboil 25 Litre Stainless Steel 340652 Zenith Autoboil 40 Litre White 340651 Zenith Autoboil 40 Litre Stainless Steel Installation and Operating Instructions

Transcript of Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum -...

Page 1: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 v1.04 Page 1 of 16

Zenith Autoboil

315652 Zenith Autoboil 15 Litre White

313651 Zenith Autoboil 15 Litre Stainless Steel

325652 Zenith Autoboil 25 Litre White

325651 Zenith Autoboil 25 Litre Stainless Steel

340652 Zenith Autoboil 40 Litre White

340651 Zenith Autoboil 40 Litre Stainless Steel

Installation and Operating Instructions

Page 2: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 2 of 24 805194NZ 11.17 1.04

Contents

Read These Warnings First ........................................................................................................................3

Installation Requirements .........................................................................................................................3

Installation Procedures .............................................................................................................................4

Step 1 – Positioning ................................................................................................................4

Step 2 – Fastening ..................................................................................................................4

Step 3 – Connecting ................................................................................................................5

3.1 Plumbing ................................................................................................................5

3.2 Venting ....................................................................................................................5

3.3 Electrical.................................................................................................................6

Step 4 – Installing Tap ...........................................................................................................6

Step 5 – Commissioning - Filter Flush & Calibrate ............................................................7

Menu Operation ..........................................................................................................................................9

Wall Mounting Template Dimensions .....................................................................................................17

Spare Parts .................................................................................................................................................18

Exploded View Diagram .............................................................................................................................19

Problem Solving .........................................................................................................................................20

Fault Codes Table ......................................................................................................................................21

Earthing Continuity Verification .................................................................................................................21

Operating Procedures ................................................................................................................................22

Filter Replacement ....................................................................................................................................22

Cleaning ......................................................................................................................................................23

End of Life Disposal ...................................................................................................................................23

Contact Details ...........................................................................................................................................24

Note:

All plumbing must comply with the relevant parts of AS/NZS 3500

All electrical must comply with the relevant parts of AS/NZS 60335/3000

This appliance is not intended for use by per-sons (including children) with reduced physical, sensory or mental capabilities, or lack of expe-rience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety. For products sold in Europe, this appliance can be used by children aged from 8 years and above and persons with reduced physical, sensory or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in a safe way and understand

the hazards involved. Children should be super-vised to ensure that they do not play with the appliance. Cleaning and user maintenance shall not be made by children without supervision.

This appliance is intended to be used in house-hold and similar applications such as- Staff kitchen areas in shops, offi ces and other working environments;- Farm houses and by clients in hotels, motels and other residential type environments;- Bed and breakfast type environments;- Catering and similar non-retail applications.

Page 3: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 3 of 24

Read These Warnings FirstPlease read all installation requirements, installation procedures and precautions before installing any Zenith Autoboil instant boiling water heater.

Never attempt to install any Zenith Autoboil instant boiling water heater without reading all of the applicable instructions.

In some hard water areas where mineral scale accumulation in the boiling chamber of the Zenith Autoboil may become a problem, consideration should be given to the maintenance required. A suitable form of water treatment may be necessary.

The cold water supply to this appliance must be potable and fall within your local authority’s guidelines.

All plumbing connections must be made in accordance with local regulations.

The Zenith Autoboil instant boiling water heater is not intended for use by young children or infirm people without supervision.

Young children should be prevented from having access to ensure that they are not able to use or play with the heater.

This appliance must be earthed. If the power supply cord is damaged it must be replaced by a Zenith authorised agent or a qualified electrician.

Do not remove the cover of the heater under any circumstances without first isolating the heater from the power supply.

Do not use strong, corrosive or abrasive cleaners to clean the case of the heater.

Frost protection: If this heater is located where ambient air temperature could fall below 5ºC when the heater is not in use, do not turn off the appliance electrically. This safeguide does not offer the same protection to the connecting pipework and fittings.

The ambient temperatures this unit must operate within is 5ºC - 50ºC.

This heater is intended only for indoor use and should never be installed outdoors or be exposed to the elements of nature.

This unit must not be positioned in an area that may be cleaned by a water jet. This unit must not be cleaned by a water jet.

Before installing, ensure that the following are available:

a) Sufficient space to position the heater so there is at least 100 mm clearance above the heater for service access, 150 mm to its right and 80 mm to its left – the tap outlet must be positioned at least 300 mm above a draining board or drip tray.

b) The unit is typically connected to 220-240/415V power to the terminal block within the heater through the rear panel (use the paper mounting template as a guide). The connecting cable must be sufficient power rating for the heater, see table on the left for information. The user accessible wall-mounted power switch must be installed in accordance with wiring rules. It shall provide

Installation Requirements

Model Element Power Connections

15L 1 x 2.4kWUse single phases power connec-tion. May also be wired to a 15A or 10A GPO respec-tively

25L 1 x 3.6kW

40L 2 x 3kW

2 phases or the same phase applied to the two live connections - 6kW

Page 4: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 4 of 24 805194NZ 11.17 1.04

all-pole disconnection with a switch contact separation of at least 3 mm (see step 3.3 on page 6).

c) Cold water supply with a minimum working pressure of 70 kPa and a maximum working pressure of 700 kPa connected via an isolation valve.

d) Outlet drainage to a sink draining board or to a drip tray.

e) Access to drainage from a vent situated at the base of the heater.

f) If the water pressure is likely to exceed 700 kPa, a 350 kPa pressure reducing valve must be installed in the cold water supply line.

f) In all installation instances the walls of the heater must be vertical and the base horizontal, there can be no exceptions to this rule.

Refer to the mounting-hole template on page 19.

Read the installation and operating instructions completely.

Decide whether to install with concealed or exposed plumbing and/or electrical connections. Concealed connections are preferred for superior appearance.

Step 1 – PositioningPosition the heater so the tap will drain on to a draining board or drip tray.

Position the base of the tap to be not less than 300 mm above the draining board (height should be increased only if essential for filling larger vessels).

Provide clearance for service access of not less than 100 mm top, 150 mm to its right and 80 mm to its left.

Mark corner positions for the heater on the wall so as to position the paper mounting-hole template.

Step 2 – FasteningPosition mounting-hole template on wall and drill holes where shown.

Installation Procedures

COLD INLET

VENT OUTLET

INLET POSITION

VENTPOSITION

Approximate Weight When Filled

100 mm minimum clearance

80 mm minimumclearance from left edge to wall

300 mm

150 mm

15 Litre models 34.5 kg

25 Litre models 47 kg

40 Litre models 71 kg

Installation Requirements

Page 5: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 5 of 24

ConcealedVent

ConcealedInlet

45 mm

Remove cover fastening screws from heater and lift whole cover off heater.

Install plumbing and wiring and prepare pipe ends and wiring ends as shown.

Screw heater chassis to the wall using screws or bolts suited to the wall.

Screws or bolts must be capable of supporting the heater weight when filled.

Step 3 – ConnectingTHE FOLLOWING PROCEDURE IS TO BE DONE BY AN AUTHORISED INSTALLER ONLY.

3.1 PlumbingFor exposed plumbing connection, connect the cold water inlet pipe from the base of the heater directly to the 12.7 mm compression fittings.

For concealed plumbing connections, connect the cold water pipe through the rear of the chassis using a 12.7 mm capillary elbow (# 63 Swivel Elbows).

Cold water pipes must be flushed before connection to the inlet. Any clogging due to sediment or fines will adversely affect the operation of the heater.

It is recommended that the heater be installed with a stop cock which allows it to be isolated from the mains supply for servicing.

Water pressure requirements:

Minimum - 70 kPa maximum - 700 kPa.

3.2 VentingA vent at the base of the heater must be plumbed to a safe visible location as, under certain conditions, it may discharge cold or boiling water and/or steam.

For exposed vent plumbing, connect vent outlet from the base of heater to a 12.7 mm pipe which has a continuous fall, is no more than 3 metres long, has no more than 3 right angle bends, and visibly discharges to a waste water drain.

Alternatively attach a tun dish to the wall as shown and plumb away to waste.

Note: when routing the plumbing for the vent / tundish installed and mains inletline, ensure you do not obstruct filter access for filter replacement.

Visible TundishVent line

Installation Procedures

Warning: If pressure is likely to exceed 700 kPa, a pressure limiting valve must be installed in the cold water supply line. Zenith recommends a valve rated at 350 kPa for this ap-plication.

Page 6: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 6 of 24 805194NZ 11.17 1.04

3.3 Electrical

Warning: Do not turn on the power until instructed. Water must first be available from the tap outlet to prevent damage.

All wiring must be performed by a qualified electrician.

For concealed electrical connections, connect a power cable from the rear of the heater to the terminal block within the heater as shown, refer to diagrams Fig.1 and Fig.2.

For surface mount installations run the power cable through the cable entry gland at the bottom of the unit to the terminal block within the heater. Ensure the cable is firmly secured.

Thread Tape

2. Ensure suffi cient thread tape is applied to the thread.

1. Fit the cover to the unit and fi x with screws top and bottom.

3. Turn the tap fully clockwise onto the outlet tube until it touches the lock nut and is in an upright position.

4. Use the spanner supplied to tighten the lock nut anti-clockwise.

Lock nut

Step 4 – Installing Tap

NeutralEarthLive

Electrical connection for unitswith 1 element (15L & 25L).

NeutralEarth

Live Phase 1Live Phase 2

Electrical connection for unitswith 2 elements (40L models).

Installation Procedures

Fig.1

Fig.2

Page 7: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 7 of 24

Installation Procedures

Step 5 – Commissioning - Filter Flush & Calibrate

Warning: Do not turn on the power until instructed. Water must first be available from the tap outlet to prevent damage.

Filter Flush1) Ensure filter flush valve lever is rotated to down

position, see Fig.3.

2) Turn on the mains water. Allow at least 5 litres of water to flush through the filter. Make sure there is water flowing from the vent outlet (i.e. the valve setting is correct). Water should not flow into the tank.

3) Once the filter flush is complete, rotate the valve lever 180⁰ (either way) to the “FILTERED” position (Fig.4).

Filling Tank1) Depress the lever as shown in Fig.4.

2) Open the tap (push the lever backwards) into the locked open position (Fig.4) and allow the tank to fill until water flows from the tap outlet.

3) Once the water is available from the tap, turn off the mains water and close the tap outlet.

4) Turn on the power to the unit (water must be in the tank).

5) Touch the white circle next to the left of the [Tick] to “Continue”

For screen operation, see the section on “Menu Operation”.

6) Boiling Calibration will commence. It will take several minutes for the water to boil.

Fig.3

Fig.4Depress

Page 8: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 8 of 24 805194NZ 11.17 1.04

Inlet water temp

15°C 10°C

15 Litre models 40 min 43 min

25 Litre models 47 min 50 min

40 Litre models 60 min 64 min

Calibrating Completed

7) When it completes (as prompted), turn on the mains water supply.

8) Select to Continue9) The home screen will be shown (see section 2.1).

10) The tank will fill and heat. It will take the initial times shown in the table to reach the final state.

Installation Procedures

Page 9: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 9 of 24

The Autoboil uses a display and button menu system for setup and operation adjustment.

The display does not have a touch screen feature. The side buttons are used to navigate, perform selections and modify values.

The icon changes according to the button action. A button has no function when no icon is shown.

Menu Operation

1.Understanding Icons and Buttons

Move to the next item able to be highlighted.

Move to the previous item able to be highlighted.

Confirm menu selection.

Move to the previous menu.

Perform one of 3 functions:

1. Move to the menu titled by the highlighted item.2. Select the currently highlighted item to adjust it.3. Confirm the value of a selected item.

Increment the item selected.

Decrement the item selected.

2.Home Screen Content

2.1 Normal Mode

Button 2 shows faults information. Button 3 shows more information about the fi lter life.

Page 10: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 10 of 24 805194NZ 11.17 1.04

Using to navigate to the fi lter life settings menu.

Button 4 will show more information about the sleep mode settings.

Using to navigate to the sleep mode settings menu.

Filter Indication:

Days remaining of fi lter life.

Shown red, fi lter needs replacement.

Sleep Mode Indication:

Unit will enter sleep mode at the time shown.

Unit will enter sleep mode when it is dark.

All sleep saving modes are disabled.

2.2 Sleep Mode

Trigger Indication:

Unit will exit sleep mode at the time shown.

Unit will exit sleep mode when ambient light returns to normal (bright room).

Menu Operation

Fault Indication:

There are no current faults.

Shown red, there are current faults.

To see fault, press button 2 and refer to fault codes table at the back of this book.

Page 11: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 11 of 24

3. Settings Menu

Select on the home screen to navigate to the main menu.

Choose Settings and select

Choose an option and select

2.3 Sleep Override Mode

Awake time remaining:

Unit will return back to sleep mode after this time.

Main Menu Settings Menu

Menu Operation

Page 12: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 12 of 24 805194NZ 11.17 1.04

3.1 Settings - Date/Time

From the settings menu choose Settingsand select

Navigating using and

Perform a selection or confirm an adjusted value using

Adjust the date/time values using and

Note: Time can be in 12hr or 24hr mode.

To set up time choose a selection, then

Adjust value by using and then to confi rm. Follow similar steps to set up date.

From the settings menu choose Settings and select , and to adjust boiling point.

Confirm using and return to the previous menu.

3.2 Settings - Temperature

Note: Setting high temperatures may require boiling calibration to prevent excessive steam release or high energy usage (see section 4.2).

3.3 Settings - Sleep Modes

From the settings menu choose Sleep Modes

and select

Choose Sleep Trigger and select , and to select the trigger for the unit to enter its sleep mode.Confi rm using and return to the previous menu.

Disabled the unit will not enter its sleep mode.

the unit will use the on/off timer settings to enter and exit its sleep mode.

the unit will enter its sleep mode when darkness is detect-ed and will exit its sleep mode when the ambient light returns to a normal level (bright room).

Timer

Ambient Light

Choose Sleep Action and select and to select the heating mode action when the unit is in its sleep mode. Confi rm using and return to the previous menu.

3.3.2 Sleep Action

3.3.1 Sleep Trigger

Menu Operation

Page 13: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 13 of 24

68°C While the unit is in its sleep mode the set point of the water will be reduced to 68°C.

While the unit is in its sleep mode no heating of the water will occur.

Off

Choose Timer Settings and select and to select the trigger for the unit to enter its sleep mode.

Confi rm using and return to the previous menu.

Everyday Adjust on/off timer settings for all 7 days simultaneously.

Adjust on/off timer settings for all 5 weekdays simultaneously.

Adjust on/off timer settings for the 2 weekend days simultane-ously.

Adjust on/off timer settings for the 7 days separately.

Weekdays

Weekends

Individual Days

3.3.3 Timer Settings

►Individual Days Settings

Choose item and adjust value, then to confirm.

3.4 Settings - Filter

From the settings menu choose Filter

and select

3.4.1 Internal / External FiltersChoose Internal or External

and select

Choose one of the following options and select

Note: There is a similar set of menus for both internal and external fi lters.

Menu Operation

► Saving changes

to exit the timer settings menu. A

confirmation menu will be shown.

Choose Continue to save changes and

to confirm. Choose Cancel to

discard changes and to confirm.

Page 14: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 14 of 24 805194NZ 11.17 1.04

This allows modifi cation of fi lter life and usage parameters.

Filter Life – Options are:

► Disabled (no fi lter replacement reminder will be shown on home screen)

► 1-14 months (Default 12 months)

Filter Usage – Automatically increments daily. This is reset to “0 Days” when a fi lter reset is performed. Can be adjusted if a partially used fi lter is inserted.

The days remaining of the fi lter shown on this menu and on the home screen are based on these 2 parameters.

This action will reset the fi lter usage counter. A re-minder is shown to fl ush the new fi lter before doing this (see page 21 - Filter Replacement). Select to continue after fl ushing.

Choose Continue and select to reset the fi lter usage counter.

The log shows the dates that the fi lter usage counter was reset and the “days used” before the reset was performed.

Use and to scroll through the log history.

3.4.2 Filter Life / Usage

3.4.3 Replace Filter

3.4.2 Filter Log

Select on the home screen to navigate to the main menu.

Choose Install and select

4. Install Menu

Menu Operation

Page 15: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 15 of 24

4.1 Install - Light Calibration

From the install menu choose Continue and select

Before continuing ensure the unit is in its normal typical light environment and the front panel is not covered.

Select to perform the calibration. It will com-plete after 6 seconds.

Select to continue.

4.2 Install - Boiling Calibration

This automatically corrects for boiling point differences at each installation site. The unit was calibrated by the installer at installation; however the installation environment may have changed requiring recalibration of the boiling point.

Incorrect boiling calibration points may cause excessive steam vent releases, or increased energy usage.

From the install menu choose Continue and select

The unit will heat the water for boiling calibration. This may take several minutes depending on the initial water temperature. When it completes the screen will automatically return to the install screen.

4.3 Install - Power Cycle

From the install menu choose Power Cycle and select

This will turn the unit briefl y off then on (restart). All custom settings will be retained.

Choose Continue and select to perform the power cycle.

Menu Operation

Page 16: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 16 of 24 805194NZ 11.17 1.04

5.1 Info - Product

From the install menu choose Product

5.2 Info - Current Fault

From the info menu choose Current Fault

6. Service Menu

Note: The service menu is used by technicians only for diagnostic purposes.

Menu Operation

5. Info Menu

Select on the home screen to navigate to the main menu.

Choose Info and select

Choose value then select

Page 17: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 17 of 24

Wall Mounting Template Dimensions

573.0

0 (10

lt, 15

lt)

753.0

0 (25

lt)

813.0

0 (40

lt)

40.00

41.00 (10lt, 15lt, 25lt, 40lt)62.00 (10lt, 15lt, 25lt, 40lt)84.00 (10lt, 15lt, 25lt, 40lt)

COLD INLET VENT25.00

333.00 (10lt, 15lt, 25lt)

591

.00 (1

0lt, 15

lt)

External Plumbing

Electrical Wiring

Internal Plumbing

499.00 (40lt)

39.50 (10lt, 15lt, 25lt, 40lt)

459.50 (40lt)

145.00 (10lt, 15lt, 25lt)

458.00 (40lt)

10.0

0 (10

lt, 15

lt, 25

lt, 40

lt) 6

0.00 (

10lt,

15lt,

25lt,

40lt)

21.00 (10lt, 15lt, 25lt, 40lt) 103.00 (10lt, 15lt, 25lt, 40lt)

41.00

(10lt

, 15lt,

25lt,

40lt)

771.0

0 (25

lt)

334.50 (10lt, 15lt, 25lt) 374.00 (10lt, 15lt, 25lt)

Wall template for 15 litre, 25 litre & 40 litre models.

Page 18: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 18 of 24 805194NZ 11.17 1.04

Spare Parts

Item Kit Number Description

1 93118NZ Elbow Stem 1/4"

2 94457NZ Cistern Lid EB & AB

3 94495NZ Grommet

4 94456NZ Cistern Gasket

5 94455NZ Ball Valve Assy

6 94454NZ Cistern

7 94458NZ Overload

8 90100NZ Grommet Cistern to Tank

9 94460NZ Seal Transfer Tube

10 90494NZ Metering Tube 2.4kW Element 15lt

10 90527NZ Metering Tube 3.6kW Element 25lt

10 90526NZ Metering Tube 2 x 3.0kW Element 40lt

11 94609NZ 4 Pole Contactor 40lt

11 90174NZ 3 Pole Contactor 25lt

12 94610NZ PCB Heatsink Assy

13 94491NZ Filter Flush Valve

14 94611NZ Ribbon Cable

15 94459NZ Side Release Plug

16 94492NZ Filter Head Kit (no bracket)

17 94612NZ Mains Inlet Assy

18 93704NZ 0.2 mic Zenith Filter Size 2

19 94613NZ Steam Sensor NTC

Item Kit Number Description

20 90501NZ Tap Top Assy21 93730NZ Flow Insert22 94478NZ Tap Body23 94448NZ Tap Lock Nut24 94447NZ Escutcheon25 94479NZ AB Fascia & PCB Assy26 91440NZ Hot Tank NTC27 90492NZ Drain Cap & Seal Kit28 90491NZ Cleaning Hole Cover Kit29 90123NZ 2.4kW Element 15lt29 90124NZ 3.6kW Element 25lt29 90530NZ 3.0kW Element 40lt

29 90532NZ 3.6kW/380 Element 25lt

29 90541NZ 3.0kW/415 Element 40lt

30 94471NZ Cistern Gasket Kit31 94472NZ Cistern Assy32 94470NZ Tap Assy33 94619NZ Vent Bush Assy34 94620NZ Tank Assy 40lt34 94621NZ Tank Assy 25lt34 94622NZ Tank Assy 15lt35 94623NZ Tap Outlet Assy

36 94624NZ Loom PCB to Overload

37 94625NZ Loom Contactor to Overload

38 94626NZ Loom PCB to Terminal

Page 19: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 19 of 24

Exploded View Diagram

Page 20: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 20 of 24 805194NZ 11.17 1.04

Problem Solving

Symptom Possible Cause Solution

Fails to dispense water.

Incorrect filter flush valve setting.

Incorrect filter insertion.

Water isolating valve turned off.

Blocked filter, blocked meter tube, blocked strainer, jammed ball

valve assembly.

Check filter flush valve position (see Step 5, page 7).

Check filter is inserted correctly (see page 21).

Check water supply valve.

Contact Zenith authorised agent.

Water not boiling.

Incorrect temperature setting.

Incorrect sleep mode setting.

No power.

Faulty thermostat, faulty element, faulty cutout.

Check temperature setting (see section 3.2).

Check sleep mode settings (see section 3.3) or reset settings from

service menu.

Check power supply.

Contact Zenith authorised agent.

Runs out of boiling water and fails to refill.

Outlet tap drips.Overflow from vent.

Excessive steam from vent.Power “on” but no heat.

Overload repeatedly tripping with excessive steam.

Overload repeatedly tripping without

excessive steam.

Requires boiling calibration.

Incorrect filter flush valve setting.

Incorrect filter insertion.

Internal adjustment.

Perform boiling calibration (see section 4.2).

Check filter flush valve position (see Step 7, page 8).

Check filter is inserted correctly (see page 21).

Contact Zenith authorised agent.

Sleep/Wakes incorrectly when room is light/dark.

Requires light calibration.

Incorrect sleep modes settings.

Perform light calibration (see section 4.1).

Check sleep mode settings (see section 3.3) or reset settings from

service menu.

Page 21: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 21 of 24

Warning: this appliance must be earthed.

Following remedial service the earthing continuity of the heater must be checked by a qualified technician using an appliance tester, or continuity tester of accuracy Class 5 or better. Class 5 denotes an accuracy of 5% full scale deflection.

1. Isolate power supply.

2. Set meter to 0 ohm with leads connected together.

3. Connect one test lead to the earth pin on the three pin plug.

4. Connect the other test lead to a bare patch of metal (preferably on the edge) of the top of the cover, then to the front cover of the unit, and then to the tap.

Warning- the water may be boiling - show extra care.5. Test that in every instance the electrical resistance does not exceed 1 ohm.

Earthing Continuity VerificationIf required, an earth continuity test can be performed by testing between the earth pin on the products lead and a exposed piece of metal on the case and the tap body.

Error Code Error meaning Solutions

0 Boiling sensor is open circuit Call Zenith Service

1 Boiling sensor has a short circuit Call Zenith Service

2 Steam Sensor is open circuit Call Zenith Service

3 Steam sensor has a short circuit Call Zenith Service

4 Calibration error !! Call Zenith Service

5Boiling calibration error, insuffi cient steam temperature when boiling sensor registered over 90°c

Call Zenith Service

6Max temp error. The maximum temperature reached is lower than 92°c during the calibration process.

Check your height above sea level.Call Zenith Service.

7Over temp error. A constant temperature over 103°C has been reached during the calibration process.

Make sure there is an airgap in the vent line. Call Zenith service.

8Calibration error, water temperature is falling or constant when maximum element power is applied.

AutoBoil – When water runs from the outlet tap turn water supply off to unit. Restart calibration. HydroBoil – Call Zenith service.

Fault Codes Table

Page 22: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 22 of 24 805194NZ 11.17 1.04

1. Turn the fi lter anti-clockwise.

NOTE: For safe operation, the filter cartridge should be replaced every 6-12 months, or earlier if you notice a persistent reduction in water pressure from the appliance or an unpleasant taste or odour in the water.

To Replace Filter:

• Turn the filter anti-clockwise (fig.1) and pull the cartridge down (fig.2). Have an absorbent cloth ready as a small amount of water will be released as the filter is removed. The cartridge should release from the filter head.

• Replace with a new filter by gently pushing up, engaging the key and turning the filter clockwise until the filter clicks or locks into place.

• Perform filter flush by following the filter flush steps on page 7 (Step 7 - Commissioning).

• Go to [Replace Filter] screen to reset the fi lter usage counter. Follow the instructions on page 14 (3.4.3 Replace Filter) section for details of menu operation.

Warning! Not changing filtration cartridges when required, may cause the water to become biologically unsafe.

If the Zenith Autoboil is switched off for a long period of time (e.g. More than a weekend), run water through the outlet for at least 5 minutes before consumption.

Filter Replacement

Fig.1

2. Remove the fi lter by gently pulling down.

Fig.2

Operating Procedures

Tap OperationBoiling water

Zenith Autoboil is fitted with a two-way tap for filtered instant boiling water.

For instant boiling water, gently pull the top of the tap forward.

Boiling water will flow until the tap handle is released.

This operation gives fingertip flow control for safe filling of cups and mugs.

To fill larger vessels such as teapots and saucepans, rotate the tap 180 degrees and depress it until it locks into a horizontal position.

Boiling water will flow until the tap is returned to its normal vertical position. This operation allows the vessel to be filled without holding your hand where it may be affected by steam.

Page 23: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

805194NZ 11.17 1.04 Page 23 of 24

End of life disposal

In order to help preserve our environment we ask that you dispose of this product correctly. Please contact your local city council for collection centre details.

Cleaning

Cleaning CaseDo not use strong, corrosive, spray or abrasive cleaners. Clean the case with a soft cloth or sponge and mild soapy water.

Dispose of the filter cartridge responsibly.

Use only Zenith Filter in this product to ensure effective filtration and operation. Replacement filter cartridges can be obtained through plumbing suppliers or directly from Zenith.

Filter replacement instructions are included with the filter cartridge spare part kits.

Filter Replacement

Page 24: Installation and Operating Instructions...Water pressure requirements: Minimum - 70 kPa maximum - 700 kPa. 3.2 Venting A vent at the base of the heater must be plumbed to a safe visible

Page 24 of 24 805194NZ 11.17 1.04

Contact Details

This user manual has been written according to application firmware version 1.0. Please check the following website for the latest user manual: www.zenithwater.co.nz

Head Office

Zenith Heaters Ltd.

IRD/GST Number 95-640-729

Unit 2/15 Moselle Avenue

Henderson

Auckland

Website: www.zenithwater.co.nz

Telephone +64 9 838 8612

Free Call 0800 558 055

As Zenith’s policy is one of continuous product improvement, changes to specifi cations

may be made without prior notice. Images in this booklet have been modifi ed and

may not be true representations of the fi nished goods.

The standard cup referred to in this publication is 167 ml (6 fl oz).

© 2017 Zenith Heaters Ltd. All Rights Reserved.

The terms “Zenith” “Hydroboil”, “Autoboil”,” Econoboil”, “Power-Pulse”, “GlobalPlus”, “MicroPurity” are trademarks of Zenith Heaters (AUST) Pty Ltd.

Products described in this publication are manufactured under one or more patents and further patent applications are pending.

One or more products described in this publication are also registered designs of

Zenith Heaters (AUST) Pty Ltd.