GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 1/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
GENERAL GUIDELINES FOR STORAGE
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 2/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
DOCUMENT REVISION STATUS: DETERMINED BY THE LAST ENTRY IN THE "REV" AND "DATE" COLUMN NOTE : Changed or added parts in each new specification has a vertical line in the margin
REV. DESCRIPTION REV. DATE
A First Issue – This document supersedes specification ‘’STORAGE SPECIFICATION 01’’ 30 September 2012 B Updated with suggestion of surface site storage 16 January 2014
© COPYRIGHT 2014 GE COMPANY PROPRIETARY INFORMATION - THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION OF GE COMPANY
AND MAY NOT BE USED OR DISCLOSED TO OTHERS, EXCEPT WITH THE WRITTEN PERMISSION OF GE COMPANY.
PREPARED BY:
P. SICLARI
VALIDATED BY:
T. DANTEC
APPROVED BY:
T. DANTEC
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 3/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
TABLE OF CONTENTS + APPLICABLE DOCUMENTS (CLICK ON ACTIVE LINK TO BE DIRECTED TO CHAPTER)
GENERAL ...................................................................................................................................................... 4
1.1. Purpose ............................................................................................................................................................. 4
1.2. Application ........................................................................................................................................................ 4
2.1. Information contained ...................................................................................................................................... 4
1.3. Exclusions .......................................................................................................................................................... 5
1.4. Proprietary Considerations ............................................................................................................................... 5
1.5. Responsibilities .................................................................................................................................................. 5
1.6. Communication ................................................................................................................................................. 5
1.7. Owner/User responsibility ................................................................................................................................ 5
2. STORAGE DURATION ....................................................................................................................... 6
2.1. Short term storage ............................................................................................................................................ 6
2.2. Long term storage ............................................................................................................................................. 6
3. STORAGE AREAS ............................................................................................................................... 6
3.1. Storage codes .................................................................................................................................................... 6
3.2. General characteristics of storage areas: .......................................................................................................... 6
3.2.1. On Park (OP) and Under Shelter (US) ....................................................................................................... 6
3.2.2. Closed Building (CB) and Air-conditioned Building (AB) ........................................................................... 7
4. STORAGE LOCATIONS ..................................................................................................................... 7
4.1. Access and Surveillance: .................................................................................................................................... 7
4.1.1. Site access ................................................................................................................................................. 7
4.1.2. Surveillance............................................................................................................................................... 7
4.2. Personnel safety ................................................................................................................................................ 7
4.3. Material protection ........................................................................................................................................... 8
4.4. Fire protection ................................................................................................................................................... 8
4.5. Maintenance of storage locations ..................................................................................................................... 8
5. STORAGE MANAGEMENT ................................................................................................................ 8
5.1. Basic principles .................................................................................................................................................. 8
5.2. Storage criteria .................................................................................................................................................. 9
5.3. Storage follow-up .............................................................................................................................................. 9
5.3.1. Inspection upon arrival ............................................................................................................................. 9
5.3.2. Periodic inspections during storage ....................................................................................................... 10
5.3.3. Inspection before storage release .......................................................................................................... 10
6. TEMPERATURE AND HUMIDITY MONITORING .......................................................................... 11
6.1. Storage environment (outside material) : ....................................................................................................... 11
6.2. Storage of Turbines: ........................................................................................................................................ 11
6.3. Storage of Generators: .................................................................................................................................... 11
6.4. Temperature and hygrometry data monitoring .............................................................................................. 11
ANNEX 1 : PICTORIAL SYMBOLS (HANDLING, TRANSPORT AND STORAGE) : ................................. 12
ANNEX 2 : SUGGESTED SURFACE SITE STORAGE : .............................................................................. 14
-The present specification -GEK 28156 : Gas Turbine and Accessory Equipment Preservation -GEK 110146 : Protection of Assembled Generators During Shipment, Storage and Prior to Start-up
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 4/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
GENERAL
1.1. Purpose
GE Energy provides the present document as a general guidance to assist Owner/User in managing storage activities of the equipment, during transit phase, provided under the scope of the contract.
The present recommendations may be amended or completed as necessary by specific instructions as required. Information will be issued in due time and will be available at storage place on equipment arrival.
Specification only applicable for material kept in intact original packing.
1.2. Application
This document applies to cargo in transit. This period begins at pick-up at Supplier’s premises and finishes at delivery to Customer’s site. A dedicated process handles the storage activities from material receipt at site.
It is highlighted that all GE cargo in transit is insured automatically with GE Global Transit Policy when GE has Risk-of-Loss. Coverage concerns mainly property damage occurring during shipment (air, sea or land) of GE property or the property of others (e.g.: Customers or Vendors) where GE has the contractual obligation to insure (terms of sales, Incoterms).
Therefore, temporary storage in course of transit only (air, sea or land) is covered. Temporary storage is considered cargo waiting for booked carrier and usually less than 30 days. Static Risks are cargoes stored that do not fit the “temporary storage” definition and are not included in Transit insurance policy. Owner/User may contract the adequate insurance to cover his material during storage period. If the Owner/User needs further detail regarding this subject, he may consult directly their local GE representative.
2.1. Information contained
The storage instructions are communicated to provide the Owner/User with reference information in addition to his normal storage procedures. Because storage philosophies vary from Customer/User to Customer/User, GE Energy does not attempt to dictate specific procedures but to provide basic limitations and requirements created by the type of equipment provided.
The information provided is intended to build on a user’s basic understanding of the storage activities. It is expected that if the Owner/User needs additional assistance or further detail regarding his specific equipment, they consult directly with their local GE representative.
The information set out in this document has been developed from GE Energy standard equipment specifications. Updated project-specific information is included as necessary.
The contents of this document will not create any liability whatsoever on the part of the General Electric Company or its employees whether in warranty, alleged negligence or otherwise. The General Electric Company may be consulted for any special shipping or storage concerns applicable to a specific unit. In addition to information provided refer to dedicated section of the Operation and Maintenance Manual.
Caution
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 5/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
1.3. Exclusions
The specification does not include information for storage at the time of Manufacturing, Installation and Commissioning. Detailed information on these aspects can be found in the appropriate specifications, also available from General Electric Company.
1.4. Proprietary Considerations
The data, drawings and other information contained in this document are the confidential proprietary information of General Electric Company. They are disclosed in confidence to the Owner/User under the referenced contract solely for his use in the storage activities of that equipment. No license is granted for other purposes.
No part of this publication may be reproduced or copied in any form or manner (including electronic, mechanical, photocopying, recording, translating or other information retrieval system) without prior written authority of the General Electric Company.
1.5. Responsibilities
The instructions set out in this specification assume that Owner/User already have a general understanding of the requirements for safe storage of equipment. These instructions therefore should be interpreted and applied in conjunction with the local safety rules and regulations applicable at the storage areas.
No additional representations or warranties by the General Electric Company regarding the equipment or its use are given or implied by the issue of this specification. The rights, obligations and liabilities of GE Energy and the owner/user are strictly limited to those expressly provided in the contract relating to the supply of the equipment.
1.6. Communication
Storage activities may be either under Customer’s responsibility or GE’s responsibility on behalf of Customer under agreed contract terms.
Any questions from the customer should be directed to the GE Energy Project Manager. GE Energy Project Manager will then direct questions to the appropriate department.
In the case, direct contacts are needed. Questions may be sent to the representatives of the Logistics & Trade Service Department with copy to the GE Energy Project Manager.
Logistics & Trade Service Department contact :
Name : M. Pietro SICLARI Tel : + 33 (0) 3 84 59 21 54
Email : [email protected]
1.7. Owner/User responsibility
It is the responsibility of the Owner/User to ensure that he is fully informed of, and implements, all requirements for the storage of material and equipment covered by this specification. If the Owner/User does not ask for any explanation or clarification in respect of the requirements, then he is deemed to have understood and accepted all of the requirements.
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 6/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
2. STORAGE DURATION This document is applicable as a complement to GE Energy instructions "Gas Turbine and Accessory Equipment Preservation" GEK28156. Storage period is defined to begin when equipment ships from factory.
2.1. Short term storage
Information for short-term storage relates to period up to 12 months.
2.2. Long term storage
Information for long-term storage refers to period in excess of 12 months.
3. STORAGE AREAS
3.1. Storage codes
The equipment is stored according to 4 types of storage, as follows :
• OP : On Park Storage : yard (outdoor surface) delimited by boundary markers, enclosure.
• US : Under Shelter Storage. Sheltered surface covered with boarding if necessary in the sides exposed to bad weather (rain, sand brought by the wind, …)
• CB : Closed Building Storage in closed building which protects the equipment from climatic conditions.
• AB : Air-conditioned Building Storage in closed building under controlled temperature.
Special Storage arrangements :
For regulated products (e.g. Hazardous Material), storage area strictly controlled must be made suitable for the following classes products :
. Paints, solvents and miscellaneous chemicals
. Hydrocarbons, fuels, oils and greases
. Resins
. Products requiring special preservation conditions
These facilities shall comply with the local authority laws and with the vendor instructions for preservation.
3.2. General characteristics of storage areas:
Each storage area shall leave a free zone providing adequate space for unloading, opening of cases as needed or containers and receipt of equipment. Access, conveyance and handling zones shall be made suitable for movement of vehicles and appliances. 3.2.1. On Park (OP) and Under Shelter (US)
For OP and US storage types, the ground shall be: - Made firm to avoid sinking, - Drained and vegetation cleared
Caution
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 7/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
When stored On Park and Under Shelter, proper dunnage means (timber, planks, pallets or racks) to be placed to support items off the storage ground with sufficient clearance for lifting forks (100mm minimum) or other means of material handling. Such condition would also provide air circulation and minimize dirt or mud from getting into/on to stored items. Additional covers may also be applied to specific items, if so required.
When stored Under Shelter, covered storage area may be of open shed with proper roof, or tarpaulin overhead covering type. Such area provides better protection to stored items from the elements.
3.2.2. Closed Building (CB) and Air-conditioned Building (AB)
For CB and AB storage types, the floors shall be : - At a higher level than the ground outside, to avoid ingress of water, - In concrete, smooth or pockmarked surface - Perfectly drained with slopes Ground surface preferably shall be paved or covered gravel, with sufficient drainage to prevent stagnant water. Items shall be placed clear off the ground with dunnage as mentioned at open storage area type. Sufficient clearance shall also be provided for air circulation and to prevent possible condensation. Warehouses shall be located and constructed on well-drained area not affected by flood and with their floor paved. Similarly, stored items shall be placed clear off the floor to allow air circulation. Air conditioned warehouse shall be prepared for storage of specific materials such as sensitive instruments, electrical items. The humidity and temperature of air conditioned warehouses shall be monitored on a regular basis (see Chapter 6). The "small equipment" area in CB storage premises may include : - Office for store keepers - A counter forming a barrier prohibiting access to the storage area by unauthorized personnel. - A closing container with key.
4. STORAGE LOCATIONS
4.1. Access and Surveillance:
The general security on storage place is under responsibility of the Owner/User
4.1.1. Site access
The access to the site has to be regulated and controlled under responsibility of the Owner/User. Any demand to enter the storage place and exam the materials has to be requested to Owner/User and require a prior authorization.
4.1.2. Surveillance
General storage place will be under surveillance to prevent unauthorized persons from entering and approach stored materials.
4.2. Personnel safety
Personnel working in the storage areas shall be provided with the individual safety equipment required by local regulations.
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 8/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
4.3. Material protection
The Owner/User has to provide a physical protection from external elements. The Owner/User has to organize the storage place in order for the material to be protected from external elements damages (forklifts, traveling cranes, slings, etc…) Protection against pests: For equipment and accessories in plastic, rubber, etc., protection against rodents and insects must be provided.
4.4. Fire protection
- All storage areas shall be equipped with portable extinguishers of a type and capacity adapted to the items stored and to the storage surface areas.
- For areas used to store inflammable products:
o The electrical installations shall be of a type compatible with the products stored. o "No smoking" signs shall be installed.
4.5. Maintenance of storage locations
This periodic check of storage premises and areas includes : - Roofing, - Water and lighting networks, - Shelves, bins, racks, - Fire protection system, locks, fencing, - Handling appliances, - Roads and passages, - Cleanliness of floors, - Ventilation and air-conditioning of premises. When a non-conformity is detected, correction shall be carried out promptly. Periodic checks and maintenance works will be logged in appropriate record support (e.g. Log book "Follow
up of materials on storage area").
5. STORAGE MANAGEMENT
5.1. Basic principles
Recommended storage code is marked on the packing , indicated within the shipping marks frame and mentioned on the Detailed Packing List (DPL).
Visual sample : DPL, Shipping Marks and Markings
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 9/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
In addition, Standard NF-H 00,004 and/or standard NF ISO 780 may be applied for Pictorial symbols relating to the transport, handling and storage. See Annex 1 of this document. Those symbols on the cases may define the criteria to be respected.
- "Fragile" symbol : not to be stacked - "Keep Dry" symbol : to be stored Under shelter covered or inside Building.
Items, in their packing, requiring periodic maintenance during storage will be defined in special instructions provided by the suppliers (e.g. desiccants replacement, battery recharging, repacking as needed when lifetime is over and under specific storage conditions…) For packages damaged during transport and those opened by customs, protection shall be restored to enable storage as shipped, in their original package. Otherwise, the items are to be stored in conditions compatible with their preservation requirements. Where necessary, special instructions shall be requested from the supplier.
5.2. Storage criteria
The items shall be stored in compliance with recommended storage code (see § 5.1. Basic principles) . Suggestion of surface site storage are communicated in Annex 2 of this document.
5.3. Storage follow-up
The Owner/User will implement a storage follow-up according their own procedures. When storage is contractually charged to GE, storage reports will be communicated by GE as per contract.
5.3.1. Inspection upon arrival
When material arrives on storage place, Owner/User may perform following inspections:
Upon Arrival
*Check packing conditions and if visible damages, clean and/or repair immediately. *Check markings and ensure consistency between storage codes and storage area *Check that regulated products (HAZMAT) are stored in a dedicated area according to rules in force, local authority laws and with the vendor instructions for preservation/actions. *Check surfaces for rust and corrosion, All rust and/or corroded areas must be cleaned, repaired and protected as per GE Engineering recommendation; *Check sealing and if necessary, e.g. leaks, clean and seal as per GE Engineering recommendation; * Open and Check cleanliness inside cubicles (e.g. PEECC, container …) * Check desiccant and humidity indicators are in place and replace as necessary. * Review for vendor instructions for preservation/actions as necessary
When storage is contractually charged to GE, storage reports will be communicated by GE as per contract. When Owner/User needs further detail regarding GE Engineering recommendation or GE vendor instructions, they consult directly with GE relevant department (see § 1.6. Communication.)
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 10/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
5.3.2. Periodic inspections during storage
The periodic inspections to be implemented as per Owner procedures. GE specification and vendor instructions for preservation may be used for reference. Standard Quarterly Inspections can be performed together with a GE Inspector when contractually requested. Owner/User may perform following inspections :
Maintenance requirement
* same inspection upon arrival (see § 5.3.1.) + *Check storage locations conditions (roof, ground, safety devices e.g. fire protection, smoke detector ;.….) * Check regulated products storage conditions according to vendor instructions for preservation/actions (e.g. oil, paint, …) * Check battery or other sensitive products storage conditions as per vendor instructions for preservation/actions as necessary * Measure and record data (battery voltages; ambient temperature, …) as per vendor instructions for preservation/actions as necessary
Storage activity contractually charged to GE Energy : Inspection reports are to be communicated to GE. Owner/User needs further detail regarding GE Engineering recommendation or GE vendor instructions; they consult directly with GE relevant department (see § 1.6. Communication.)
5.3.3. Inspection before storage release
Before material leaves the storage place, Owner/User may perform following inspections :
Before Release
* same inspection upon arrival (see § 5.3.1.) + *Check packing and markings conditions and if visible damages, clean and/or repair immediately. *Check surfaces for rust and corrosion, All rust and/or corroded areas must be cleaned, repaired and protected as per GE Engineering recommendation; *Check sealing and if necessary, e.g. leaks, clean and seal as per GE Engineering recommendation;
* Check desiccant and humidity indicators are in place and replace as necessary.
* Review for vendor instructions for preservation/actions as necessary
Caution
Caution
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 11/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
Before Release (Cont’d)
** Inspection Report (kept by Owner/User)
-If a non-conformity is detected then a correction request is sent to Owner/User for agreement -When the action is performed, the release is stated.
** Release Report (kept by Owner/User)
Final document summarizing the inspection and correction before release. � Release allows shipment
6. Temperature and Humidity Monitoring
6.1. Storage environment (outside material) : Surrounding temperature and humidity may be monitored and recorded on a weekly basis.
6.2. Storage of Turbines: GE Standard Gas Turbines are preserved using VPCI337 anti-corrosive material. After 12 months storage duration, the preservation may be renewed. Otherwise Gas turbine has to be connected to an air dryer. The air dryer device installation will be as per GE Energy specification ‘’GEK28156, Gas Turbine and Accessory Equipment Preservation’’. This document explains GE Energy philosophy for temperature and humidity monitoring. In some case the Gas turbine is not preserved using VPCI337 anti-corrosive material. At the time of the beginning of storage, if a long-term storage is expected, it is suggested then to connect the air dryer immediately. Gas turbine has to be connected to an air dryer as per information indicated above.
6.3. Storage of Generators: With reference to GEK 110146 ‘’Protection of Assembled Generators during Shipment, Storage and Prior to Startup’’, GE Standard Generators are required to be stored in heated Closed Building (CB). As an alternative, generators may be stored in an indoor, unheated facility with the frame heaters fully energized. Air cooled machines should be checked internally by removing appropriate access covers for the presence of water prior to energizing the heaters.
6.4. Temperature and hygrometry data monitoring
Owner/User will monitor the temperature and humidity as per GE Engineering recommendation or GE vendor instructions. In case Owner/User needs further details, they consult directly GE representatives. In case of records showing data outside recommended range, Owner/Use will take necessary immediate actions. Aadditional assistance or further detail regarding this recommendation should be directly requested to local GE representative.
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 12/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
ANNEX 1 : PICTORIAL SYMBOLS (HANDLING, TRANSPORT AND STORAGE) :
���� Fragile, handle with care Indicates:
1. that the content of the transport packaging is fragile 2. that it must be handled with care
���� Use no hooks Indicates that hooks may not be used to lift the transport packaging
���� Top Indicates correct upright position of transport packaging
���� Keep away from heat Indicates that the transport packaging must be kept away from heat
���� Keep away from heat and radioactivity Indicates that the content of transport packaging may be damaged or made completely unusable by heat or penetrating radiation
���� Sling Indicates the location where the slings must be for the lifting of the transport packaging
���� Keep away from moisture Indicates that the transport packaging must be kept in a dry environment
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 13/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
���� Centre of gravity Indicates the center of gravity of the transport packaging
���� Do not roll/fall over Indicates that the transport packaging must not be rolled/fall over
���� No trolley this side Indicates locations on transport packaging where trolleys or trucks must not be placed
���� Storage limit Indicates limited storage capability of transport packaging
���� Clamb sides Indicates where clambs should be placed for handling of transport packaging
���� Temperature limits Indicates temperature limits between which transport packaging must be kept
���� Stacking Indicates that stacking is forbidden
���� Stacking Indicates that forklift truck use is forbidden
GE– Europe
GENERAL GUIDELINES FOR STORAGE
GEEPF SNC/CST REV. : B 14/14
Ce document, propriété exclusive de GE Energy Products France SNC, est strictement confidentiel. Il ne peut être communiqué, copié, ou reproduit sans notre autorisation écrite.
This document, exclusive property of GE Energy Products France SNC, is strictly confidential. It must not be communicated, copied or reproduced without our written consent.
ANNEX 2 : SUGGESTED SURFACE SITE STORAGE : This appendix contains 13 pages in addition to this guideline.
An
ne
x c
on
tain
ing
13
pa
ge
s e
nc
lose
d in
Ge
ne
ral G
uid
eli
ne
s fo
r S
tora
ge
Sto
rag
esu
rfa
ce/F
ram
eS
cop
e o
f su
pp
lyO
utd
oo
rsIn
do
ors
& I
nd
oo
rs
con
tro
lle
dG
lob
al
surf
ace
st
ora
ge
9F
B S
imp
le C
ycl
e
GE
Un
it E
qu
ipm
en
t(s
ee
an
ne
x 3
a)
1X
(G
T +
SK
ID +
MO
DU
LE
S A
UX
+
EN
CL
OS
UR
E +
IN
LE
T +
EX
HA
US
T+
MS
D/G
EN
)5
,00
0 t
o 7
,00
0 m
21
,00
0 t
o 1
,50
0 m
2
30
0 t
o 5
00
m2
6,2
00
m
2
10
9F
BC
om
bin
ed
Cy
cle
Sin
gle
Sh
aft
(se
e a
nn
ex
3b
)
1X
(G
T +
SK
ID +
MO
DU
LE
S A
UX
+
EN
CL
OS
UR
E +
IN
LE
T +
EX
HA
US
T+
MS
D +
1
HR
SG
+
St
+ 1
GE
N+
CO
ND
EN
SE
R)
18
,00
0 t
o 2
2,0
00
m2
2,0
00
to
3,0
00
m2
50
0 t
o 1
,00
0 m
22
4,0
00
m2
20
9F
BC
om
bin
ed
Cy
cle
Mu
lti-
Sh
aft
2X
(G
T+
MS
D +
SK
ID +
MO
DU
LE
S A
UX
+
GE
N+
HR
SG
+ E
NC
LO
SU
RE
)&
1X
(S
T +
GE
N +
MO
DU
LE
AU
X +
CO
ND
EN
SE
R)
25
,00
0 t
o 3
0,0
00
m2
4,5
00
to
6,5
00
m2
1,5
00
to
2,5
00
m2
39
,00
0 m
2
9F
AS
imp
le C
ycl
e
GE
Un
it E
qu
ipm
en
t(s
ee
an
ne
x 3
c)
1 G
T +
SK
ID +
MO
DU
LE
S A
UX
+ E
NC
LO
SU
RE
+ I
NL
ET
+ E
XH
AU
ST
+ M
SD
+1
GE
N3
,00
0 t
o 3
,50
0 m
27
50
to
1,0
00
m2
30
0 t
o 5
,00
m2
5,0
00
m2
10
9F
AC
om
bin
ed
Cy
cle
Sin
gle
Sh
aft
(se
e a
nn
ex
3d
)
1 G
T +
SK
ID +
MO
DU
LE
S A
UX
+ E
NC
LO
SU
RE
+ I
NL
ET
+ E
XH
AU
ST
+ M
SD
+ 1
HR
SG
+1
GE
N
& 1
St
+ C
ON
DE
NS
ER
9,0
00
to
11
,00
0 m
22
,00
0 t
o 3
,00
0 m
2
50
0 t
o 1
,00
0 m
21
3,5
00
m2
20
9F
AC
om
bin
ed
Cy
cle
Mu
lti-
Sh
aft
2X
(GT
+ S
KID
+ M
OD
UL
ES
AU
X +
EN
CL
OS
UR
E +
IN
LE
T +
EX
HA
US
T+
MS
D +
2
HR
SG
/ 2
GE
N) &
1X
(S
t +
1G
EN
+
CO
ND
EN
SE
R)
22
,00
0 t
o 2
6,0
00
m2
2,0
00
to
3,0
00
m2
1,5
00
to
2,5
00
m2
28
,50
0 m
2
7F
A S
imp
le C
ycl
e
GE
Un
it E
qu
ipm
en
t(s
ee
an
ne
x 3
e)
1 X
(G
T +
SK
ID +
MO
DU
LE
S A
UX
+
EN
CL
OS
UR
E +
IN
LE
T +
EX
HA
US
T+
MS
D/G
EN
)2
,00
0 t
o 2
,50
0 m
25
00
to
70
0 m
2
20
0 t
o 3
00
m2
3,5
00
m2
7E
A,
9E
A,
6F
A
Sim
ple
Cy
cle
(se
e a
nn
ex
3f)
1 X
(G
T +
SK
ID +
MO
DU
LE
S A
UX
+
EN
CL
OS
UR
E +
IN
LE
T +
EX
HA
US
T+
MS
D/G
EN
)2
,00
0 t
o 2
,50
0 m
25
00
to
70
0 m
2
20
0 t
o 3
00
m2
3,5
00
m2
6B
Sim
ple
Cy
cle
(se
e a
nn
ex
3g
)
1X
(T
G+
SK
ID +
MO
DU
LE
S A
UX
+
EN
CL
OS
UR
E +
IN
LE
T +
EX
HA
US
T
+M
SD
/GE
N)
1,7
00
to
2,2
00
m2
30
0 t
o5
00
m2
10
0 t
o 2
00
m2
1,7
00
m2
An
ne
x 2
: S
ug
ge
stio
n o
f su
rfa
ce
sit
e s
tora
ge
B7Q
0
GF
A0
(Gen
)
B9B
CB
9X0
GS
KT
W1C
3
E5J
AE
7B0
B7G
0B
7GB
B2K
0
A3L
0B
4C0
B4D
0
B5A
1
B3C
0
B8H
0
20m
27m
A01
6A 0
06/A
1161
7/B
2TA
B5C
F
B
6H0
B7J
0 B
7JH
G2E
0
G2M
0G
4A2
G
4J0
G4L
0
G5H
0G
5J0
B8G
0D
401
D5C
0
GE
N~5
40 m
²
An
ne
x 3
a :
9F
B S
imp
le C
ycle
1M
70M
MLI
543
A1
& 5
50B
1 M
V C
ELL
INS
MLI
A
1664
A
PE
DE
RT
AL
MLI
0639
C /
099
1A /
280
C1
A13
2A /
A14
05 /
D12
A1
D13
A1
/ G02
3A /
104
9F
2G0A
1 / 0
639A
/ 2
41A
1A
41A
1
13 M
LI 1
643A
14 M
LI 1
090AT
OO
LS M
LI F
066A
& A
033A
12 M
LI 1
645
MLI
2 MLI 1604A
CC
T B
uild
ing
mli
A10
8A /A
12A
1/A
204A
CC
T
ELE
C M
LI
1155
A
80M
7 M
LI A
041A
8 M
LI A
040A
8 M
LI A
040B
4 M
LI13
11A
9 M
LI P
IPIN
G O
N B
AS
E
0559
A 0
572B
09
07C
09
09B
0909
D 0
915B
09
24B
09
24D
0953
A 0
953C
09
62B
09
62D
0972
A 0
972B
09
72C
09
76A
0979
A 0
979C
09
87A
10
96A
1635
10 M
LI 1
605A
11 M
LI 1
657A
4 M
LI 1
019F
4 M
LI
1309
A
5 M
LI 1
612A
6 M
LI 1
617
6 M
LI 9
011M
4 M
LI 7
28
2 G
T M
LI 1
009F
3 M
LI 0
706B
3 M
LI A
042A
&
A04
2A33 M
LI A
102A
6 M
LI 9
011M
1 MLI 1603 &
3 M
LI A
151A
GT
Tur
bine
& M
SD
Sur
face
~ 5
600M
²
An
ne
x 3
a :
9F
B S
imp
le C
ycle
(Co
nt’
d)
An
ne
x 3
b :
10
9F
B C
om
bin
ed
Cyc
le s
ing
le s
ha
ft
B7Q
0
GF
A0
(Gen
)
B9B
C
B9X
0G
SK
T
W1C
3
E5J
AE
7B0
B7G
0B
7GB
B2K
0
A3L
0B
4C0
B4D
0
B5A
1
B3C
0
B8H
0
20m
27m
A01
6A00
6/A
1161
7/B
2TA
B5C
F
B6H
0 B
7J0
B7J
H
G2E
0G
2M0
G4A
2G
4J0
G4L
0G
5H0
G5J
0B
8G0
D40
1D
5C0
GE
N~5
40 m
²
An
ne
x 3
b :
10
9F
B C
om
bin
ed
Cyc
le s
ing
le s
ha
ft(C
on
t’d
)
PS
01
CLO
SE
ST
EA
M
BO
LTS
J06H
MA
IN S
TE
AM
FA
NG
E
HD
WR
E
Too
ls
A09
H L
IFT
ING
AR
RA
NG
EM
EN
T
U28
T F
LEX
CO
UP
LIN
G A
LIG
N T
OO
L
A14
H K
IT, W
RE
NC
H &
TO
OLS
A10
H T
OO
LS &
WR
EN
CH
ES
PJ0
1 P
IPE
67 M
G30
L C
onta
iner
INB
U
5304
30-3
, HE
AT
RE
TE
NT
ION
J440
val
veH
PA
0 H
PP
R01
OIL
TA
NK
PR
01 O
IL T
AN
K
PR
01 O
IL T
AN
K
PR
01 O
IL T
AN
K
PC
01 C
LOS
E
LUB
E O
IL P
PG
PS
13/ P
C20
HY
D P
IPE
J060
Elb
ow –
R.M
.
HP
9In
/240
0
J060
Elb
ow –
R.M
.
HP
9In
/240
0
G72
0
EN
CLO
SU
RE
A17
ST
M O
RD
ER
ING
SH
EE
T
HY
RL
shel
l IP
TE
ST
SF
RL
SH
ELL
HY
RL
shel
l IP
TE
ST
SF
RL
SH
ELL
ST
DF
FR
ON
T S
TA
ND
AR
D
HP
ST
DM
MID
ST
AN
DA
RD
29 M
SC
V1
VA
LVE
CR
A1
VA
LVE
CR
A2
VA
LVE
SE
20 D
IAP
H
SE
20 D
IAP
H
SE
3A D
IAP
H
SE
3A D
IAP
H
SE
10 D
IAP
H
SE
10 D
IAP
H
S57
A D
IAP
H
SE
4A D
IAP
H
S53
A D
IAP
H
S58
A D
IAP
H
S62
A D
IAP
H
SE
5A D
IAP
H
HD
RL
HO
OD
HD
RL
HO
OD
HD
RL
LP H
OO
D
HD
RL
LP H
OO
D
HD
RL
EX
H H
OO
D
HD
RL
1EX
H H
OO
D
HD
RL
HO
OD
HD
RL
HO
OD
RT
RL
A17
LP
Rot
or
PJ6
9 A
DM
ISS
ION
ST
OP
VLV
PJ7
0 A
DM
ISS
ION
CO
NT
RO
L V
LV
CD
K0
ST
EA
M
TU
RB
INE
FIX
AT
OR
S
CH
A0
HO
OD
AN
CH
OR
INS
TA
LLA
TIO
N
CH
A0
HO
OD
AN
CH
OR
ST
EA
M T
UR
BIN
E :
Sur
face
~20
00M
²
HP
A1
TU
RB
INE
A
SM
P
AR
TS
U24
0 C
OU
PLI
NG
B
OLT
ING
H
AR
DW
A
SP
10 G
LAN
D
CO
ND
EN
SE
R
SE
0 D
iaph
ragm
SE
0 D
iaph
ragm
HM
BM
inst
ru
m
CH
AO
HO
OD
AN
CH
OR
A18
0 T
UR
NI
NG
HMF0 DC STARTER 40HP 240VDCHMF0 DC
STARTER 40HP
1M
70M
MLI
543
A1
& 5
50B
1 M
V C
ELL
INS
MLI
A
1664
A
PE
DE
RT
AL
MLI
0639
C /
099
1A /
280
C1
A13
2A /
A14
05 /
D12
A1
D13
A1
/ G02
3A /
104
9F2G
0A1
/ 063
9A /
241
A1
A41
A1
13 M
LI 1
643A
14 M
LI 1
090A
TO
OLS
MLI
F06
6A &
A03
3A
12 M
LI 1
645
MLI
2 MLI 1604A
CC
T B
uild
ing
mli
A10
8A /
A12
A1/
A20
4A
CC
T
ELE
C M
LIi
1155
A
80M
7 M
LI A
041A
8 M
LI A
040A
8 M
LI A
040B
4 M
LI13
11A
9 M
LI P
IPIN
G O
N
BA
SE
0559
A 0
572B
09
07C
09
09B
0909
D 0
915B
09
24B
09
24D
0953
A 0
953C
09
62B
09
62D
09
72A
097
2B
0972
C
0976
A
0979
A 0
979C
09
87A
10
96A
16
35
10 M
LI 1
605A
11 M
LI 1
657A
4 M
LI 1
019F
4 M
LI
1309
A
5 M
LI 1
612A
6 M
LI 1
617
6 M
LI 9
011M
4 M
LI 7
28
2 G
T M
LI 1
009F
3 M
LI 0
706B
3 M
LI A
042A
& A
042A
3
3 M
LI A
102A
6 M
LI 9
011M
1 Mli1603 &
3 M
LI A
151A
GT
Tur
bine
& M
SD
Sur
face
~ 5
600M
²
An
ne
x 3
b :
10
9F
B C
om
bin
ed
Cyc
le s
ing
le s
ha
ft(C
on
t’d
)
HR
SG
Sur
face
~15
620
m²
610U
1
610P
1
610U
161
0U1
610L
1
610L
1
61Z
Z5
610T
1
127m
610D
161
0ZZ
1/61
ZZ
1
610R
1
610K
1
123m
An
ne
x 3
b :
10
9F
B C
om
bin
ed
Cyc
le s
ing
le s
ha
ft(C
on
t’d
)
An
ne
x 3
c :
9FA
Sim
ple
Cyc
le
GE
N :
~6
80
m²
A14
1
B2P
0B
8G0
CB
9X,
C17
8,
C08
6, B
2N0
A15
7
B8H
0
C19
3
D43
1
GF
A0
C17
8
G4J
0
B4C
R,
B4C
T,
B4D
R
B2K
0
A3L
0
B5A
1
B7Q
0
E7B
0, G
2E0,
G4A
2, G
5H0
B2U
0, B
4ST
,
B6H
0, D
4BM
,
D5C
0, E
5JA
,
A14
0
20 m
34 m
G5J
0
G4L
0
C15
0
B7G B
W1C
S
B2Y
1
CC
T B
uild
ing
mli
A10
8A /
A12
A1/
A20
4A C
CT
A04
0A A
IR F
ILT
ER
0726
PPG
,CO
MB
US
TIO
N T
UN
E09
05 H
AR
DW
AR
E 09
07 H
AR
DW
AR
E 09
09 H
AR
DW
AR
E 09
09 E
XPA
NS
ION
JO
INT
0909
HO
SE
AS
SEM
BLY
0915
HA
RD
WA
RE
0915
HO
SE
AS
SEM
BLY
0920
HA
RD
WA
RE
0924
HO
SE
AS
SEM
BLY
0924
EX
PAN
SIO
N J
OIN
T09
53 H
AR
DW
AR
E 09
62 H
OS
E A
SS
EMB
LY09
62 H
AR
DW
AR
E, F
UEL
GA
S-T
UR
B09
62 E
XPA
NS
ION
JO
INT
0962
PIP
ING
, FU
EL G
AS
-TU
RB
INE
0964
PPG
, FIR
E PR
OT
0972
PIP
E FA
BS
09
76 P
IPE
FAB
S
0979
HA
RD
WA
RE
0987
PPG
,TB
-PR
FM,M
NT
A12
5 P
IPE
F
AB
S
A 1
79
STR
,FLD
-TE
MP
9FA
1309
H
AR
DW
AR
E
0706
SM
ALL
PA
RT
S07
06 D
IFF
US
ER
AS
SY
0706
CO
VE
R
110
GA
S T
UR
BIN
E
67 M
Sur
face
GT
~ 3
750M
²
1603
ML1
603
FOU
ND
AT
ION
BO
LT
ING
110
SU
MM
AR
Y S
HEE
T M
AT
ERIA
L
1645
GR
AT
ING
AR
RA
NG
EMEN
TS
&-'è INLET DUCTING
&-'_
CR
AN
E,
OV
ER
HE
AD
TR
VL
1652 LADDER, EXHAUST TC
A184 HARDWARE (A184)A184 EXPANSION JOINT
A184 PIPE FABS (A184) 9FAA341 PPG ARR, INLET BLEED HEAT
A15
1 E
xha
ust d
iffus
er
insu
latio
n
A04
1A I
NLE
T
A04
2 E
xha
ust S
yste
m
0572
AU
X S
TOP
VA
LVE
0572
SA
FE
TY S
HU
TOF
F V
EN
T V
ALV
E06
39 G
AS
FU
EL
FLO
W M
EA
S10
49 IN
LET
DE
HU
MID
IFIE
RA
068
8 T
TAN
KA
068
VA
PO
RIZ
ER
A13
0 A
IR P
RO
CE
SS
ING
UN
ITA
132
A13
2 9F
A/B
CO
OLI
NG
FA
N M
OD
ULE
G00
2 F
UE
L G
AS
SC
RU
BB
ER
G01
5 F
UE
L G
AS
AB
S S
EP
SK
IDG
015
LAD
DE
R
DLN
MA
TER
IAL
D
LN M
ATE
RIA
L
1612
FS
-9F
B 3
0DE
G I
NLE
T
PLE
NU
M
1634
Aco
ustic
al E
nclo
sure
, O
il/G
as
1643
Ven
t fa
n en
clos
ure
1635
Duc
t co
olin
g an
d se
alin
g ai
r
A 1
02 E
XH
AU
ST
EN
CLO
SU
RE
115
5 JB
AR
R W
/O J
B20
U -
SS
557T
TR
AN
SD
UC
ER
PA
NE
LA
014
TUR
BIN
E C
ON
TRO
L PA
NEL
A1
22 R
H S
ENS
OR
G01
2 FG
ELE
CT
STA
RTU
PG
012
CO
NTR
OL
PAN
EL
A20
4 M
EA
SU
RIN
G IN
STR
UM
ENTS
A20
9 M
A12
10-
445
9
An
ne
x 3
d :
10
9FA
Co
mb
ine
d C
ycle
GE
N :
~6
80
m²
A14
1
B2P
0B
8G0
CB
9X,
C17
8,
C08
6, B
2N0
A15
7
B8H
0
C19
3
D43
1
GF
A0
C17
8
G4J
0
B4C
R,
B4C
T,
B4D
R
B2K
0
A3L
0
B5A
1
B7Q
0
E7B
0, G
2E0,
G4A
2, G
5H0
B2U
0, B
4ST
,
B6H
0, D
4BM
,
D5C
0, E
5JA
,
A14
0
20 m
34 m
G5J
0
G4L
0
C15
0
B7G B
W1C
S
B2Y
1
CC
T B
uild
ing
mli
A10
8A /
A12
A1/
A20
4A C
CT
A04
0A A
IR F
ILTE
R
0726
PPG
,CO
MB
US
TIO
N TU
NE
0905
HA
RD
WA
RE
0907
HA
RD
WA
RE
0909
HA
RD
WA
RE
0909
EX
PAN
SIO
N JO
INT
0909
HO
SE
AS
SEM
BLY
0915
HA
RD
WA
RE
0915
HO
SE
AS
SEM
BLY
0920
HA
RD
WA
RE
0924
HO
SE
AS
SEM
BLY
0924
EX
PAN
SIO
N JO
INT
0953
HA
RD
WA
RE
0962
HO
SE
AS
SEM
BLY
0962
HA
RD
WA
RE,
FUE
L G
AS
-TU
RB
0962
EX
PAN
SIO
N JO
INT
0962
PIP
ING
, FU
EL G
AS
-TU
RB
INE
0964
PPG
, FIR
E PR
OT
0972
PIP
E FA
BS
09
76 P
IPE
FAB
S
0979
HA
RD
WA
RE
0987
PPG
,TB
-PR
FM,M
NT
A12
5 P
IPE
FA
BS
A 1
79
STR
,FLD
-TE
MP
9FA
1309
H
AR
DW
AR
E
0706
SM
ALL
PA
RTS
0706
DIF
FUS
ER A
SS
Y07
06 C
OV
ER
110
GA
S T
UR
BIN
E
67 M
Sur
face
GT
~ 3
750M
²
1603
ML1
603
FOUN
DA
TIO
N
BOLT
ING
110
SU
MM
AR
Y S
HEE
T M
AT
ERIA
L
1645
GR
AT
ING
ARR
AN
GEM
ENT
S
&-'è INLET DUCTING
&-'_
CR
AN
E,
OV
ER
HE
AD
TR
VL
1652 LADDER, EXHAUST TC
A184 HARDWARE (A184)A184 EXPANSION JOINT
A184 PIPE FABS (A184) 9FAA341 PPG ARR, INLET BLEED HEAT A
151
Exha
ust d
iffus
er
insu
latio
n
A04
1A IN
LET
A04
2 Ex
haus
t Sys
tem
0572
AU
X S
TOP
VA
LVE
0572
SA
FE
TY S
HU
TOF
F V
EN
T V
ALV
E06
39 G
AS
FU
EL
FLO
W M
EA
S10
49 IN
LET
DE
HU
MID
IFIE
RA
068
8 T
TAN
KA
068
VA
PO
RIZ
ER
A13
0 A
IR P
RO
CE
SS
ING
UN
ITA
132
A13
2 9F
A/B
CO
OLI
NG
FA
N M
OD
ULE
G00
2 F
UE
L G
AS
SC
RU
BB
ER
G01
5 F
UE
L G
AS
AB
S S
EP
SK
IDG
015
LAD
DE
R
DLN
MA
TER
IAL
D
LN M
ATE
RIA
L
1612
FS
-9FB
30D
EG IN
LET
PLE
NU
M
1634
Aco
ustic
al E
nclo
sure
, Oil/
Gas
1643
Ven
t fa
n en
clos
ure
1635
Duc
t co
olin
g an
d se
alin
g ai
r
A 1
02 E
XH
AU
ST
ENC
LOS
UR
E
1155
JB
AR
R W
/O J
B20
U -
SS
557T
TRA
NS
DU
CER
PA
NEL
A01
4 TU
RB
INE
CO
NTR
OL
PAN
ELA
122
RH S
ENS
OR
G01
2 FG
ELE
CT
STA
RTU
PG
012
CO
NTR
OL
PAN
EL
A20
4 M
EAS
URIN
G IN
STR
UM
ENTS
A20
9 M
A12
10-4
459
S
team
: 16
00M
²J440
B
LOW
DO
WN
/WA
SH
CO
VER
S
BR
LA B
EAR
ING
S
ECTI
ON
LPA
A18
0 TU
RN
IN
G
53 M
G30
L H
EA
T R
ETE
NTI
ON
HP
A0
HP
SE0
DIA
PHR
AG
M S
TG L
0-T/
G L
PA
(D10
-42)
LO
WER
/ U
PPER
SE0
DIA
PHR
AG
M S
TG L
0-T/
G L
PA
(D10
-42)
UPP
ER /
LOW
ERS
E10
DIA
PHR
AG
M S
TG L
1-T/
G L
PA
SE1
0 D
IAPH
RA
GM
STG
L1-
T/G
LPA
S
E20
DIA
PHR
AG
M S
TG L
2-T/
G L
PA
SE2
0 D
IAPH
RA
GM
STG
L2-
T/G
LPA
S
E30
DIA
PHR
AG
M S
TG L
3-T/
G L
PA
SE4
0 D
IAPH
RA
GM
STG
L4-
T/G
LPA
S
G50
DIA
PHR
AG
M S
TG L
5-G
LPA
C
DD
S A
LUM
INU
M D
IAPH
30 M
RTL
A
RO
TOR
S
EC
TIO
N L
PA
C27
F A
RR
MT
SPO
OL
PIEC
E G
UA
RD
C
EQ0M
AC
H. T
G H
SG
LO
WB
OY
G2
CG
E0
AS
SY
,CO
UPL
ING
G
UA
RD
G68
0 &
G70
0 A
CO
US
TIC
AL
BLA
NK
ETS
STE
AM
EN
CLO
SU
RE
H02
0 M
TG -
DIF
F EX
P D
ET
H10
8 N
ETW
OR
K
J190 CROSS OVER PIPINGJ190 BOLTING HARDWARE
J190 CONDENSER SEAL
HD
LA F
AB
AS
Y E
XH H
OO
D-L
WR
GE
CA
P5
BE
AR
ING
INR
CS
G F
AB
UP
R M
IDIN
R C
SG
FA
B L
WR
MID
C
AP
4 B
RG
E
XT H
AD
FA
B
HO
OD
FA
B E
XH U
PR
TE
FA
B A
SY
EXH
HO
OD
-LW
R T
EP
KG
CS
G U
-H F
AB
CP
LG G
UA
RD
FA
B,
UP
PE
RP
IPE
UN
ION
S-W
H
OO
D F
AB
EXH
UP
R G
ETG
BO
X &
CA
BLE
AS
SY
PR01
PR
01 L
UB
E O
ILE
MO
DU
LE
PR90
HY
DR
AU
LIC
PO
WER
UN
IT
PC01
CLO
SE
LUB
E O
IL P
PGPC
20 F
ITTI
NG
S/T
UB
ING
PJ01
MA
IN S
TEA
M P
IPIN
GPJ
03 H
AN
GER
S &
SU
PPO
RTS
PJ03
HA
NG
ERS
& S
UPP
OR
TSPJ
6918
INC
H C
LAS
S 1
50#
AC
TUA
TOR
PJ70
18 IN
CH
CLA
SS
150
#
Tool
sA
09H
LIF
TIN
G
AR
RA
NG
EM
EN
T
A10
H T
OO
LS &
WR
EN
CH
ES
TALA
TU
RB
INE
AS
M
PAR
TS -
LPA
U15
0 S
OLI
D C
OU
PLIN
G A
SS
Y
U19
0 S
PAR
E B
AL
WT
& P
LUG
U
210
CPL
G P
TS F
ITTE
D
U24
0 C
PL'G
PTS
FIT
TED
SOLE PLATE
VS
PL
VA
LV
PV01
MO
TOR
O
PER
ATE
D V
ALV
ESPV
02 A
IR O
PER
ATE
D
VA
LVES
PV03
MA
NU
ALL
Y
PS01
CLO
SE
STE
AM
PIP
ING
PS10
GLA
ND
S
TEA
M
CO
ND
ENS
ER
CD
G0
&
CD
J0
FOU
ND
ATI
ON
PLA
TE
72m
00
3A
00
3A
00
3A
122m
003A
006A
B, 0
06B
, 008
D, 0
08G
, 027
B, 0
27B
AA
, 027
BA
C, 0
27B
AD
, 027
BC
, 02
7D, 0
27D
A, 0
27D
B, 0
27D
C, 0
44D
A, 0
51A
A, 0
56E
F, 0
58A
HR
SG
+Con
d: ~
8784
m²
An
ne
x 3
d :
10
9FA
Co
mb
ine
d C
ycle
(Co
nt’
d)
7FA
GT
+G
en S
urfa
ce ~
3500
m²
74M
A04
0
A04
1
B8H
7
B9F
1,
B9
JJ,
B9
X0,
C
D2B
,
G2
J0,
G2K
0,
G2
M0,
G
2N0
,
G4J
S,
GS
KT
, T
G2M
, W
1CH
C15
0
1617
E L
OA
D C
OM
PT
HA
RD
WA
RE
1648
CR
AN
E,
OV
ER
HE
AD
TR
VL
1652
LA
DD
ER
, E
XHA
US
T TC
0706
A
FT
DIF
FU
SE
R A
SS
YM
ISC
H
AR
DW
AR
E
1207
A08
3
A14
0
A14
1
A2
15,
A5
GF,
B
4J1
, B
6H0
,
48M
A04
0P
IPIN
G &
HA
RD
WA
RE
05
72/9
05/9
15/9
20/9
64/9
72/9
76/
979/
987
995/
1022
/109
7/16
35/9
010/
9019
/96
9A96
9M /
A03
7/ A
125
/A17
9 /A
184/
A34
1
FA
N E
NC
LO M
LI 1
643
MLI
162
7 A
CC
BA
RR
IER
MLI
163
4 P
OW
ER
E
NC
LOS
UR
E
MLI
A15
1 IN
SU
LATI
ON
B
LAN
KE
T
S
KID
S06
39 /
104
9 /
A06
8/ A
132
A16
0A
168
/ A
209
/ E
025
/ F
056
/ F
066
G00
2 /
G01
0 /
G01
2 /
G01
5 /
G02
3
A
042
EXH
AU
STE
TOP
FO
RW
AR
D H
ALF
DU
CT
MIN
OR
STR
UC
TUR
E (
2)S
TRU
CTU
RE
(1)
BO
TTO
M F
OR
WA
RD
HA
LF D
UC
TTO
P A
FT
HA
LF D
UC
TB
OTT
OM
AF
T H
ALF
DU
CT
1612
FS
-7F
A IN
LET
PLE
NU
M
A19
2
A05
9
A11
1
CA
B1 A
5G0
ELE
CTR
IC &
IN
STR
UM
EN
TATI
ON
0726
/ 1
022
/115
5 12
61 /
557
T /
A10
8A
122
/ A
258
/ A
315
F05
6
A033 LIFTING BEAM 7FA / ROTOR GUIDE BEAM /
LIFT ENCL ASM F066 TOOL KIT / TOOL CART / HYD WRENCHE
1309
H
AR
DW
AR
E(G
EN
E &
TUR
BIN
E)
G
AS
TU
RB
INE
S
UM
MA
RY
SH
EE
T M
ATE
RIA
L S
UM
MA
RY
SH
EE
T P
IPIN
G
ML1
603
FO
UN
DA
TIO
N
BO
LTIN
G16
04 B
OLT
ING
& D
OW
ELI
NG
1645
G
RA
TIN
G
An
ne
x 3
e :
7FA
Sim
ple
Cyc
le
GT / GENERATOR / OIL MODULE MATERIAL FOR
FOUNDATION,TEMPLATEEMBEDDED PIECES & BASE
PLATESMLI 1026F / 510A2 / 221Z3/
222Z3/ 223Z3
FUEL O
IL FILTER
ING
S
KID
S
UM
P TA
NK
MLI
270
CO
OLG
FAN
M
OD
MLI
A132A
CO
MP
LM
T
ITE
M
WAS
HIN
G
SK
ID
ML
I 28Z
Z5C
OR
IOLIS
FLO
WM
ETC
OM
PLT FU
EL GA
S
SS
OV
&
LIGHT FUEL OIL FILTERING SKID MLI 2D1A1
GA
S TU
RB
INE
/ TUR
BIN
E G
AZ M
LI 1006FG
EN
ER
ATO
R C
OM
PLE
TE 6F
A M
LI 510A2
SF
C M
LI A1405
6FA
+E
LUB
E O
IL GA
S M
OD
ULE
MLI A
160A
GE
EP
E LA
RIO
JA A
162 RE
TRO
FIT M
LI A162Z
LOA
D G
EA
R M
LI A012A
C
TL CO
NTA
INE
R M
LI B1ZZ1
MC
C C
ON
TAIN
ER
MLI B
1ZZ1 B
ATTE
RY
CO
MP
AR
TME
NT M
LI B1ZZ5
PREFABRICATED PIPING MLI FR103Q2148A- VALVES / VANNES MLI 1066FPIPES AND FITTINGS MLI 0969AINSULATION MLI 910R1INSULATION MLI 0969BPIPING MLI 0910PIPE SUPPORT MLI 0969C
INTERCO PIPING COMPLEMANTARY 0969Z
chemicals+equipmentSIMPLE CYCLE OFF BASE COOLING MLI 811A1
Piping / Steelstructure / Pump Skid / Expansion Tank / Re- Cooler C1>4 / Cooler-Box
BATTERY MLI B53A1
COMPLEMENTARY ITEM AC.ENC ELEC
MLI 1113ZELECTRICAL
GLAC GNAC Busduct Support Structure MLI 540F1
CO
MP
RE
SS
OR
M
LI 2JZZ5
GA
S TU
RB
INE
C
OM
PO
NE
NTS
MLI
1016F
SFC -Accessories
MLI A1405
16
05
5
16
34
16
50
CUSTOM. GENERATOR MLI 510B3UNIT GENERATOR MLI 510A2 cooler roof complete & Rotor assy
SITE PAINTING
CO
UP
LI
A0
41
EXHAUST DIFFUSER INSULATION MLI A151A
EXH
AU
ST
DIF
FU
SE
R M
LI A
042A
A0
40
260K
HV
AC
M
CC
M
LI B
1ZZ1
WA
LKW
AY
S M
LI 2F
6
LOAD GEAR HANDLING MLI A033COMPLE
26
ZZ
5
A9
80
~9
0 m
~ 42m
6FA
Stora
ge
surfa
ce ~
35
00
m²
6 m
6 m
6 m
6 m
6 m
10
m1
0 m
10
m1
0 m
10
m
An
ne
x 3f : 6
FA S
imp
le C
ycle
An
ne
x 3
g :
6B
Sim
ple
Cyc
le
GE
Sto
rage
Are
a
O
NL
Y F
OR
IN
FO
RM
AT
ION
5M
6M
5M
6M
8M
5M
6M
5M
6M
E076601/D
C3E
1/0
012
E076601/D
C3E
1/0
013
E076601/D
C3E
1/0
014
E076601/D
C3E
1/0
015
E076601/D
C3E
1/0
016
E076601/D
C3E
1/0
017
E076601/D
C3E
1/0
018
E076601/D
C3E
1/0
019
E076601/D
C3E
1/0
020
E076601/D
C3E
1/0
021
E076601/D
C3E
1/0
022 /
E
076601/D
C3E
1/0
023
E076601/D
C3E
1/0
024
E076601/D
C3E
1/0
025
E076601/D
C3E
1/0
026
E076601/D
C3E
1/0
027
E076601/D
C3E
1/0
028
E076601/D
C3E
1/0
029
E076601/D
C3E
1/0
030
E076601/D
C3E
1/0
031
E076601/D
C3E
1/0
032
E076601/D
C3E
1/0
033
E076601/D
C3E
1/0
034
E076601/D
C3E
1/0
035
E076601/D
C3E
1/0
036
E076601/D
C3E
1/0
035
E076601/D
C3E
1/0
036
E076601/D
C3E
1/0
037
E076601/D
C3E
1/0
038
E076601/D
C3E
1/0
039/E
076
601/D
C3E
1/0
040
E076601/D
C3E
1/0
041/E
076
601/D
C3E
1/0
042
E076601/D
C3E
1/0
043/E
076
601/D
C3E
1/0
044
E076601/D
C3E
1/0
045/E
076
601/D
C3E
1/0
046
E076601/D
C3E
1/0
047/E
076
601/D
C3E
1/0
048
E076601/D
C3E
1/0
049/E
076
601/D
C3E
1/0
050
E076601/D
C3E
1/0
051/E
076
601/D
C3E
1/0
052
E076601/D
C3E
1/0
053/E
076
601/D
C3E
1/0
054
E076601/D
C3E
1/0
055
A040 -
Insta
llation A
IR F
ILTE
RE
076601/A
040A
/007
E076601/A
040A
/008
E
076601/A
040A
/009
A040 -
Insta
llation A
IR F
ILTE
RE
076601/A
040A
/010
E076601/A
040A
/011
E076601/A
040A
/012
E076601/A
040A
/013
E076601/A
040A
/014
PETR
ONO
R AREA
8M
A040 -
Insta
llation A
IR
FIL
TE
RE
076601/A
040A
/001
E076601/A
040A
/002
1113A
- A
CO
US
TIC
EN
CLO
SU
RE
M
ATE
RIA
LS
E
076601/1
113A
/001
E076601/1
113A
/002
E076601/1
113A
/003
E076601/1
113A
/004
E076601/1
113A
/005
260 -
Insta
llation E
xhaust
Acoustic
Enclo
sure
E
076601/2
60B
1/0
01
E076601/2
60B
1/0
02
E076601/2
60B
1/0
03
E076601/2
60B
1/0
04
1605 -
OF
F B
AS
E A
CO
US
TIC
AL
EN
CLO
SU
RE
E076601/1
605A
/001
E076601/1
605A
/002
E076601/1
605A
/003
E076601/1
605A
/004
E076601/1
605A
/005
E076601/1
605A
/006
E076601/1
605A
/007
E076601/1
605A
/008
E076601/1
605A
/009
E076601/1
605A
/010
E076601/1
605A
/011
E076601/1
605A
/012
E076601/1
605A
/013
E076601/1
605A
/014
E076601/1
605A
/015
E076601/1
605A
/016
E076601/1
605A
/017
E076601/1
605A
/018
E076601/1
605A
/019
E076601/1
658A
/001
E076601/D
C3E
1/0
012
E076601/D
C3E
1/0
013
E076601/D
C3E
1/0
014
E076601/D
C3E
1/0
015
E076601/D
C3E
1/0
016
E076601/D
C3E
1/0
017
E076601/D
C3E
1/0
018
E076601/D
C3E
1/0
019
E076601/D
C3E
1/0
020
E076601/D
C3E
1/0
021
E076601/D
C3E
1/0
022 /
E
076601/D
C3E
1/0
023
E076601/D
C3E
1/0
024
E076601/D
C3E
1/0
025
E076601/D
C3E
1/0
026
E076601/D
C3E
1/0
027
E076601/D
C3E
1/0
028
E076601/D
C3E
1/0
029
E076601/D
C3E
1/0
030
E076601/D
C3E
1/0
031
E076601/D
C3E
1/0
032
E076601/D
C3E
1/0
033
E076601/D
C3E
1/0
034
E076601/D
C3E
1/0
035
E076601/D
C3E
1/0
036
E076601/D
C3E
1/0
035
E076601/D
C3E
1/0
036
E076601/D
C3E
1/0
037
E076601/D
C3E
1/0
038
E076601/D
C3E
1/0
039/E
076
601/D
C3E
1/0
040
E076601/D
C3E
1/0
041/E
076
601/D
C3E
1/0
042
E076601/D
C3E
1/0
043/E
076
601/D
C3E
1/0
044
E076601/D
C3E
1/0
045/E
076
601/D
C3E
1/0
046
E076601/D
C3E
1/0
047/E
076
601/D
C3E
1/0
048
E076601/D
C3E
1/0
049/E
076
601/D
C3E
1/0
050
E076601/D
C3E
1/0
051/E
076
601/D
C3E
1/0
052
E076601/D
C3E
1/0
053/E
076
601/D
C3E
1/0
054
E076601/D
C3E
1/0
055
A041 Insta
llation IN
LE
T
DU
CT N
EW
CO
MP
ON
IT
S.R
.LE
076601/A
041A
/001
E076601/A
041A
/002
E076601/A
041A
/003
E076601/A
041A
/004
E076601/4
20D
1/0
01
A980 - INLET SUPPORTING
STRUCTURES
E076601/A980A/001
E076601/A980A/002
E076601/A980A/003
E076601/A980A/004
E076601/A980A/005
E076601/A980A/006
E076601/A980A/007
550 -
Genera
tor
MV
Cell
E076601/5
50B
1/0
01
E076601/5
50B
1/0
02
560 -
MV
Bus D
ucts
E
076601/5
60A
1/0
01
A040 -
Insta
llation A
IR
FIL
TE
RE
076601/A
040A
/003
E076601/A
040A
/004
E076601/A
040A
/005
E076601/A
040A
/006
A040 -
Insta
llation A
IR F
ILTE
RE
076601/A
040A
/007
E076601/A
040A
/008
E
076601/A
040A
/009 Access road
FR
103-
pip
ing
E076600/F
R103/0
01
75M
510 -
GE
NE
RA
TO
RE
076601/5
10B
3/0
02
E076601/5
10B
3/0
03
E076601/5
10E
1/0
01
E076601/5
10E
1/0
02
422 -
Sid
e o
r A
xia
l E
xhaust
A042B
-E
XH
AU
ST
SY
STE
M S
UP
PO
RT
FR
AM
E076601/4
20B
1/0
01
E076601/4
20B
1/0
02
E076601/A
042B
/001
E076601/A
042B
/002
E076601/A
042B
/003
WA
LK
WA
YS
E076601/2
F0G
1/0
0
A040 -
Insta
llation A
IR F
ILTE
RE
076601/A
040A
/010
E076601/A
040A
/011
E076601/A
040A
/012
E076601/A
040A
/013
E076601/A
040A
/014
30 M
Access roadAccess road
PETR
ONO
R AREA
16
M
SK
ID T
EM
PO
RA
RY
AR
EA
SK
ID T
EM
PO
RA
RY
AR
EA
GE ACOUSTICAL ENCLOSURE AREA
E51A1 - PLATES INOX
E076601/E51A1/001
A033A HANDLING SPREADER
ROTOR 6B
DC
OK
1 -
CA
BLE
TR
AY
+
AC
CE
SS
OR
Y O
F W
IRIN
G
E076601/D
C0K
1/0
01
E076601/D
C0K
1/0
02
DC
OM
16
E076601/D
C0M
1/0
01
DC
4 -
Genera
l C
ablin
g
E076602/D
C4N
CS
/001
DC
3N
CS
-C
AB
LE
S B
RIT
AIN
6B
su
rfa
ce: 1
70
0m
²