    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Grand Inga Development Project Production and Associated

    Transmission Lines

    Hydro 2013 Addis Ababa

    16, 17, 18 April 2013

    GRAND INGA FEASIBILITY STUDY

    REPUBLIQUE DEMOCRATIQUE DU CONGO

    MINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Presented by: Stphane St-Pierre,Co-Director

    Grand Inga Project (AECOM)

  • 7/28/2019 etude de faisabilit INGA aecom

    2/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    For 60 years, in spite of the potential of the site, all previous

    schemes required considerable pre-investments in large civil

    works, making the first MW expensive.

    It was found that the minimum economically feasible size was

    7000 MW.

    In 2011, Aecom-EDF was mandated by SNEL, with the funding ofADB, to optimize the Grand Inga site, considering the proposed

    Inga 3 project.

    Grand Inga Too big to be constructed ?

  • 7/28/2019 etude de faisabilit INGA aecom

    3/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    A new approach has been proposed, making the development ofthe Grand Inga economically feasible in the very short term:

    Innovative, flexible and economical staging identified

    Each phase as small as 2,000 MW at competitive costs

    Phase size can be adjusted to adapt to planned demand and

    export opportunities

    Grand Inga 2013 Feasibility Study : Main Results

  • 7/28/2019 etude de faisabilit INGA aecom

    4/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3 replaced by a simpler Grand Inga first phase at low head

    with no closure of the Congo River and no tunnels, using an

    open channel

    Integrating the final development of Grand Inga when river

    dam is built in the future

    Turbine-generators designed to operate at low and high

    head

    Bundi Dam and intake structures designed to be raised in

    the future

    Grand Inga 2013 Feasibility Study : Main Results

  • 7/28/2019 etude de faisabilit INGA aecom

    5/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Site IngaDbit module: 41,000 m3/s

    Chute = 100 m

    Inga 1 (350 MW)

    Inga 2 (1 424 MW)

  • 7/28/2019 etude de faisabilit INGA aecom

    6/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3 basse chutecanal de transfert

    barrage de la BundiCentrale Inga 3

    P max : 4800 MW

    Q max : 6600 m3/s

  • 7/28/2019 etude de faisabilit INGA aecom

    7/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3 basse chuteremplissage du rservoir

    Niveau deau amont : 145 - 170m

  • 7/28/2019 etude de faisabilit INGA aecom

    8/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3 haute chuteBarrage sur le fleuve Congovacuateurs de crues

    Rehaussement du barrage Bundichute +50%

    Pas de nouvelle centraleP Inga 3 HC : jusqu 7800 MW

  • 7/28/2019 etude de faisabilit INGA aecom

    9/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3 haute chuteRemplissage du rservoirNiveau deau amont : 202 205 m

  • 7/28/2019 etude de faisabilit INGA aecom

    10/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3

  • 7/28/2019 etude de faisabilit INGA aecom

    11/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3 et 4

  • 7/28/2019 etude de faisabilit INGA aecom

    12/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3, 4 and 5

  • 7/28/2019 etude de faisabilit INGA aecom

    13/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3, 4, 5 et 6

  • 7/28/2019 etude de faisabilit INGA aecom

    14/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 7

  • 7/28/2019 etude de faisabilit INGA aecom

    15/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3 8

  • 7/28/2019 etude de faisabilit INGA aecom

    16/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Inga 3 basse chute

    canal detransfert @6,600 m3/s

    barrageBundi

    Centrale @ 4,800 MW

  • 7/28/2019 etude de faisabilit INGA aecom

    17/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Progressive Development of Grand Inga

  • 7/28/2019 etude de faisabilit INGA aecom

    18/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    Grand Inga New, small, economical multi-stage

    development scheme

    Main benefits:

    To finally and rapidly start Grand Inga development

    Flexibility to adapt to DRC and export demand patterns

    Provide optimized generation costs at each stage by levelling

    investments over time

    Allow multiple public / private operators to share the site

  • 7/28/2019 etude de faisabilit INGA aecom

    19/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    INGA 3-LH: IMPACTSON LAND USE

    Very low footprint on land:

  • 7/28/2019 etude de faisabilit INGA aecom

    20/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    INGA 3-LH

    Occupied Hectares /MW

    Numberofinhabitantsto

    relocate/MW

  • 7/28/2019 etude de faisabilit INGA aecom

    21/21

    REPUBLIQUE DEMOCRATIQUE DU CONGOMINISTERE DES RESSOURCES HYDRAULIQUES ET LECTRICIT

    Addis Ababa, April 2013Grand Inga Feasibility Study Hydro 2013

    INGA 3-LH: EIES CONCLUSIONS

    Site specific initial conditions very favourable

    Hydrology greater than the needs Negative Impacts identified are of low

    intensity and manageable

    Potential Social and Economic Positive Impacts