Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381...

17
Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME INTERNATIONALE Automation systems in the process industry – Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) Systèmes d'automatisation pour les procédés industriels – Essais d'acceptation en usine (FAT), essais d'acceptation sur site (SAT) et essais d'intégration sur site (SIT) INTERNATIONAL ELECTROTECHNICAL COMMISSION COMMISSION ELECTROTECHNIQUE INTERNATIONALE W ICS 25.040 PRICE CODE CODE PRIX ISBN 978-2-88912-917-1 ® Registered trademark of the International Electrotechnical Commission Marque déposée de la Commission Electrotechnique Internationale ® Warning! Make sure that you obtained this publication from an authorized distributor. Attention! Veuillez vous assurer que vous avez obtenu cette publication via un distributeur agréé. This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Transcript of Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381...

Page 1: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

IEC 62381 Edition 2.0 2012-02

INTERNATIONAL STANDARD NORME INTERNATIONALE

Automation systems in the process industry – Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) Systèmes d'automatisation pour les procédés industriels – Essais d'acceptation en usine (FAT), essais d'acceptation sur site (SAT) et essais d'intégration sur site (SIT)

INTERNATIONAL ELECTROTECHNICAL COMMISSION

COMMISSION ELECTROTECHNIQUE INTERNATIONALE W ICS 25.040

PRICE CODE CODE PRIX

ISBN 978-2-88912-917-1

® Registered trademark of the International Electrotechnical Commission Marque déposée de la Commission Electrotechnique Internationale

®

Warning! Make sure that you obtained this publication from an authorized distributor. Attention! Veuillez vous assurer que vous avez obtenu cette publication via un distributeur agréé.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 2: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

– 2 – 62381 © IEC:2012

CONTENTS

FOREWORD ........................................................................................................................... 3 INTRODUCTION ..................................................................................................................... 5 1 Scope ............................................................................................................................... 6 2 Normative references ....................................................................................................... 9 3 Terms, definitions and abbreviated terms ......................................................................... 9

3.1 Terms and definitions .............................................................................................. 9 3.2 Abbreviated terms ................................................................................................. 11

4 General preparation before conducting the FAT ............................................................. 11 4.1 Overview ............................................................................................................... 11 4.2 Documents typically prepared by owner/contractor ................................................ 12 4.3 Documents typically prepared by vendor ............................................................... 12

5 Factory acceptance test ................................................................................................. 12 5.1 General ................................................................................................................. 12 5.2 FAT test plan ......................................................................................................... 13 5.3 Test procedure ...................................................................................................... 13

5.3.1 Test set-up ................................................................................................ 13 5.3.2 Conducting of test ..................................................................................... 14 5.3.3 Application check procedures .................................................................... 15

5.4 FAT rework ........................................................................................................... 16 5.5 Documentation of FAT in accordance with Annex A ............................................... 16

6 Site acceptance test ....................................................................................................... 17 6.1 General ................................................................................................................. 17 6.2 SAT test plan ........................................................................................................ 17

7 Site integration test ........................................................................................................ 17 7.1 General ................................................................................................................. 17 7.2 SIT test plan .......................................................................................................... 18

Annex A (informative) FAT test report .................................................................................. 19 Annex B (informative) SAT check list ................................................................................... 31 Annex C (informative) SIT check list .................................................................................... 32 Annex D (informative) FAT certificate .................................................................................. 33 Annex E (informative) SAT certificate .................................................................................. 34 Annex F (informative) SIT certificate .................................................................................... 35 Annex G (informative) Automation system acceptance certificate ......................................... 36 Annex H (informative) FAT punch list .................................................................................... 37 Annex I (informative) SAT punch list .................................................................................... 38 Annex J (informative) SIT punch list ..................................................................................... 39 Bibliography .......................................................................................................................... 40 Figure 1 – Diagram depicting typical sequence of events for FAT, SAT and SIT with respect to the project milestones ............................................................................................ 7 Figure 2 – Diagram depicting the relationship for the SAT and SIT between the DCS and subsystems ...................................................................................................................... 8 Figure 3 – Diagram depicting the relationship between the FAT, SAT and SIT with the relevant plant levels ................................................................................................................ 8

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 3: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

62381 © IEC:2012 – 3 –

INTERNATIONAL ELECTROTECHNICAL COMMISSION

____________

AUTOMATION SYSTEMS IN THE PROCESS INDUSTRY – FACTORY ACCEPTANCE TEST (FAT), SITE ACCEPTANCE TEST (SAT),

AND SITE INTEGRATION TEST (SIT)

FOREWORD

1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international co-operation on all questions concerning standardization in the electrical and electronic fields. To this end and in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their preparation is entrusted to technical committees; any IEC National Committee interested in the subject dealt with may participate in this preparatory work. International, governmental and non-governmental organizations liaising with the IEC also participate in this preparation. IEC collaborates closely with the International Organization for Standardization (ISO) in accordance with conditions determined by agreement between the two organizations.

2) The formal decisions or agreements of IEC on technical matters express, as nearly as possible, an international consensus of opinion on the relevant subjects since each technical committee has representation from all interested IEC National Committees.

3) IEC Publications have the form of recommendations for international use and are accepted by IEC National Committees in that sense. While all reasonable efforts are made to ensure that the technical content of IEC Publications is accurate, IEC cannot be held responsible for the way in which they are used or for any misinterpretation by any end user.

4) In order to promote international uniformity, IEC National Committees undertake to apply IEC Publications transparently to the maximum extent possible in their national and regional publications. Any divergence between any IEC Publication and the corresponding national or regional publication shall be clearly indicated in the latter.

5) IEC itself does not provide any attestation of conformity. Independent certification bodies provide conformity assessment services and, in some areas, access to IEC marks of conformity. IEC is not responsible for any services carried out by independent certification bodies.

6) All users should ensure that they have the latest edition of this publication.

7) No liability shall attach to IEC or its directors, employees, servants or agents including individual experts and members of its technical committees and IEC National Committees for any personal injury, property damage or other damage of any nature whatsoever, whether direct or indirect, or for costs (including legal fees) and expenses arising out of the publication, use of, or reliance upon, this IEC Publication or any other IEC Publications.

8) Attention is drawn to the Normative references cited in this publication. Use of the referenced publications is indispensable for the correct application of this publication.

9) Attention is drawn to the possibility that some of the elements of this IEC Publication may be the subject of patent rights. IEC shall not be held responsible for identifying any or all such patent rights.

International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems, of IEC technical committee 65: Industrial-process measurement, control and automation.

This second edition cancels and replaces the first edition published in 2006. This edition constitutes a technical revision.

The main changes with respect to the previous edition are listed below:

– The definition of the documents mentioned in this standard is in accordance with future IEC 627081.

___________ 1 To be published.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 4: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

– 4 – 62381 © IEC:2012

The text of this standard is based on the following documents:

FDIS Report on voting

65E/222/FDIS 65E/227/RVD

Full information on the voting for the approval of this standard can be found in the report on voting indicated in the above table.

This publication has been drafted in accordance with the ISO/IEC Directives, Part 2.

The committee has decided that the contents of this publication will remain unchanged until the stability date indicated on the IEC web site under "http://webstore.iec.ch" in the data related to the specific publication. At this date, the publication will be

• reconfirmed, • withdrawn, • replaced by a revised edition, or • amended.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 5: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

62381 © IEC:2012 – 5 –

INTRODUCTION

There is an increasing trend in the process industry to shorten the time period for project execution. At the same time, the complexity of automation systems is being increased due to the number of connected systems and the use of new technologies, for example, fieldbus systems.

Experience has shown that the owner, the contractor and the vendor have long and extensive discussions to unambiguously lay down the scope of activities and responsibilities in order to achieve a timely delivery and acceptance of automation systems.

This standard is intended to lead to an improvement and acceleration of the negotiation phase and to a mutual understanding about the scope of activities of each party

The annexes of this standard contain forms which may be used in the test procedures. Buyers of this standard may copy these forms for their own purposes only in the required amount.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 6: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

– 6 – 62381 © IEC:2012

AUTOMATION SYSTEMS IN THE PROCESS INDUSTRY – FACTORY ACCEPTANCE TEST (FAT), SITE ACCEPTANCE TEST (SAT),

AND SITE INTEGRATION TEST (SIT)

1 Scope

This International Standard defines procedures and specifications for the Factory Acceptance Test (FAT), the Site Acceptance Test (SAT), and the Site Integration Test (SIT). These tests are carried out to prove that the automation system is in accordance with the specification.

Engineering and manufacturing activities prior to these tests are not covered by this standard.

For application in the pharmaceutical or other highly specialized industries, additional guidelines (for example, Good Automated Manufacturing Practice (GAMP)), definitions and stipulations should apply in accordance with existing standards, for example, for GMP Compliance 21 CFR (FDA) and the Standard Operating Procedure of the European Medicines Agency (SOP/INSP/2003).

The description of activities given in this standard can be taken as a guideline and adapted to the specific requirements of the process, plant or equipment. A typical sequence of activities and events is shown in Figure 1, and their relationship are shown in Figures 2 and Figure 3.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 7: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

62381 © IEC:2012 – 7 –

NO

TE

The

loop

che

ck c

an a

ctua

lly b

e st

arte

d du

ring

the

cons

truc

tion

phas

e on

ce th

e re

quir

ed in

fras

truc

ture

has

bee

n in

stal

led.

Figu

re 1

– D

iagr

am d

epic

ting

typi

cal s

eque

nce

of e

vent

s fo

r FA

T, S

AT

and

SIT

with

res

pect

to t

he p

roje

ct m

ilest

ones

Pre

requ

isite

for

FAT

-

SW

com

plet

e -

Sys

tem

hoo

ked

up

- V

endo

r in

-hou

se te

st c

ompl

eted

Pre

requ

isite

for

SA

T

- S

hipm

ent o

f sys

tem

to s

ite

- P

rope

r in

stal

latio

n -

Sys

tem

sta

rt-u

p

Pre

requ

isite

for

SIT

-

Sys

tem

s pr

oper

ly c

onne

cted

-

SA

T co

mpl

ete

Con

stru

ctio

n P

reco

mm

issi

onin

g

Loop

che

ck

Mec

hani

cal C

ompl

etio

n S

tart

up

Col

d co

mm

issi

onin

g H

ot c

omm

issi

onin

g

Com

mis

sion

ing

ES

D

DC

S

FAT

ES

D

DC

S

SA

T

ES

D/D

CS

SIT

Pro

cess

con

trol

sys

tem

com

plet

ion

IEC

1

36/1

2

Thi

s is

a p

revi

ew o

f "IE

C 6

2381

Ed.

2.0

b:..

.". C

lick

here

to p

urch

ase

the

full

vers

ion

from

the

AN

SI s

tore

.T

his

is a

pre

view

of "

IEC

623

81 E

d. 2

.0 b

:..."

. Clic

k he

re to

pur

chas

e th

e fu

ll ve

rsio

n fr

om th

e A

NS

I sto

re.

Thi

s is

a p

revi

ew o

f "IE

C 6

2381

Ed.

2.0

b:..

.". C

lick

here

to p

urch

ase

the

full

vers

ion

from

the

AN

SI s

tore

.T

his

is a

pre

view

of "

IEC

623

81 E

d. 2

.0 b

:..."

. Clic

k he

re to

pur

chas

e th

e fu

ll ve

rsio

n fr

om th

e A

NS

I sto

re.

Page 8: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

– 8 – 62381 © IEC:2012

DCS Subsystem 1

Subsystem n

System SAT Communication SIT

IEC 137/12

Figure 2 – Diagram depicting the relationship for the SAT and SIT between the DCS and subsystems

Typical DCS

Operator level

Process level

Rack I/O

Field device Hart, etc

Process

Loop check Loop check Loop check

Wiri

ng te

st

Wiri

ng te

st

Wiri

ng te

st

FAT SAT

FAT, partly SAT or SIT

Remote I/O Fieldbus

Fieldbus device

FAT SAT

IEC 138/12

Figure 3 – Diagram depicting the relationship between the FAT, SAT and SIT with the relevant plant levels

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 9: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

62381 © IEC:2012 – 9 –

2 Normative references

The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies.

None

3 Terms, definitions and abbreviated terms

3.1 Terms and definitions

For the purposes of this document, the following terms and definitions apply.

3.1.1 automation system DCS- or PLC-based system for the monitoring and controlling of production facilities in the process industry, including control systems based on fieldbus technologies

3.1.2 tag unambiguous alphanumerical descriptor which identifies a sensor or actuator

3.1.3 factory acceptance test activity to demonstrate that the vendor system and additionally supplied systems are in accordance with the specification

3.1.4 site acceptance test activity to demonstrate that the installation of the various vendor systems are in accordance with the applicable specifications and installation instructions

3.1.5 site integration test activity to demonstrate that the merging of the various systems to one overall system is completed and that all components work together as specified

3.1.6 buyer company which is functionally responsible for the automation system purchased from vendor, i.e. either the owner or the contractor

3.1.7 owner company that hired a contractor to build a chemical plant, petrochemical plant, etc.

3.1.8 contractor company which is hired by the owner to design and build a chemical plant, petrochemical plant, etc.

NOTE The function of contractor can be fulfilled by the owner.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 10: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

– 42 – 62381 © CEI:2012

SOMMAIRE

AVANT-PROPOS .................................................................................................................. 43 INTRODUCTION ................................................................................................................... 45 1 Domaine d'application .................................................................................................... 46 2 Références normatives ................................................................................................... 49 3 Termes, définitions et abréviations ................................................................................. 49

3.1 Termes et définitions ............................................................................................. 49 3.2 Abréviations .......................................................................................................... 51

4 Préparation générale avant la réalisation du FAT ........................................................... 52 4.1 Vue d’ensemble ..................................................................................................... 52 4.2 Documents habituellement préparés par le propriétaire/prestataire ....................... 52 4.3 Documents habituellement préparés par le fournisseur.......................................... 52

5 Essai d'acceptation en usine .......................................................................................... 52 5.1 Généralités............................................................................................................ 52 5.2 Plan d'essai du FAT .............................................................................................. 53 5.3 Procédure d'essai .................................................................................................. 54

5.3.1 Montage d'essai ........................................................................................ 54 5.3.2 Réalisation de l'essai ................................................................................. 55 5.3.3 Procédures de vérification de l'application ................................................. 55

5.4 Reprise du FAT ..................................................................................................... 57 5.5 Documentation du FAT conformément à l'Annexe A .............................................. 57

6 Essai d'acceptation sur site ............................................................................................ 57 6.1 Généralités............................................................................................................ 57 6.2 Plan d'essai du SAT .............................................................................................. 57

7 Essai d'intégration sur site.............................................................................................. 58 7.1 Généralités............................................................................................................ 58 7.2 Plan d'essai du SIT ............................................................................................... 58

Annexe A (informative) Rapport d'essai du FAT ................................................................... 59 Annexe B (informative) Liste de vérification SAT .................................................................. 71 Annexe C (informative) Liste de vérification SIT ................................................................... 72 Annexe D (informative) Certificat du FAT ............................................................................. 73 Annexe E (informative) Certificat du SAT ............................................................................. 74 Annexe F (informative) Certificat du SIT .............................................................................. 75 Annexe G (informative) Certificat d'acceptation du système d'automatisation ....................... 76 Annexe H (informative) Liste des travaux non conformes du FAT .......................................... 77 Annexe I (informative) Liste des travaux non conformes du SAT .......................................... 78 Annexe J (informative) Liste des travaux non conformes du SIT .......................................... 79 Bibliographie ......................................................................................................................... 80 Figure 1 – Schéma décrivant la séquence type d'événements FAT, SAT et SIT relative aux étapes déterminantes du projet ...................................................................................... 47 Figure 2 – Schéma décrivant les relations du SAT et du SIT entre le DCS et les sous-systèmes .............................................................................................................................. 48 Figure 3 – Schéma décrivant les relations entre le FAT, le SAT et le SIT aux niveaux appropriés de l'usine ............................................................................................................. 48

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 11: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

62381 © CEI:2012 – 43 –

COMMISSION ÉLECTROTECHNIQUE INTERNATIONALE

____________

SYSTÈMES D'AUTOMATISATION POUR LES PROCÉDÉS INDUSTRIELS – ESSAIS D'ACCEPTATION EN USINE (FAT), ESSAIS D'ACCEPTATION

SUR SITE (SAT) ET ESSAIS D'INTÉGRATION SUR SITE (SIT)

AVANT-PROPOS

1) La Commission Electrotechnique Internationale (CEI) est une organisation mondiale de normalisation composée de l'ensemble des comités électrotechniques nationaux (Comités nationaux de la CEI). La CEI a pour objet de favoriser la coopération internationale pour toutes les questions de normalisation dans les domaines de l'électricité et de l'électronique. A cet effet, la CEI – entre autres activités – publie des Normes internationales, des Spécifications techniques, des Rapports techniques, des Spécifications accessibles au public (PAS) et des Guides (ci-après dénommés "Publication(s) de la CEI"). Leur élaboration est confiée à des comités d'études, aux travaux desquels tout Comité national intéressé par le sujet traité peut participer. Les organisations internationales, gouvernementales et non gouvernementales, en liaison avec la CEI, participent également aux travaux. La CEI collabore étroitement avec l'Organisation Internationale de Normalisation (ISO), selon des conditions fixées par accord entre les deux organisations.

2) Les décisions ou accords officiels de la CEI concernant les questions techniques représentent, dans la mesure du possible, un accord international sur les sujets étudiés, étant donné que les Comités nationaux de la CEI intéressés sont représentés dans chaque comité d’études.

3) Les Publications de la CEI se présentent sous la forme de recommandations internationales et sont agréées comme telles par les Comités nationaux de la CEI. Tous les efforts raisonnables sont entrepris afin que la CEI s'assure de l'exactitude du contenu technique de ses publications; la CEI ne peut pas être tenue responsable de l'éventuelle mauvaise utilisation ou interprétation qui en est faite par un quelconque utilisateur final.

4) Dans le but d'encourager l'uniformité internationale, les Comités nationaux de la CEI s'engagent, dans toute la mesure possible, à appliquer de façon transparente les Publications de la CEI dans leurs publications nationales et régionales. Toutes divergences entre toutes Publications de la CEI et toutes publications nationales ou régionales correspondantes doivent être indiquées en termes clairs dans ces dernières.

5) La CEI elle-même ne fournit aucune attestation de conformité. Des organismes de certification indépendants fournissent des services d'évaluation de conformité et, dans certains secteurs, accèdent aux marques de conformité de la CEI. La CEI n'est responsable d'aucun des services effectués par les organismes de certification indépendants.

6) Tous les utilisateurs doivent s'assurer qu'ils sont en possession de la dernière édition de cette publication.

7) Aucune responsabilité ne doit être imputée à la CEI, à ses administrateurs, employés, auxiliaires ou mandataires, y compris ses experts particuliers et les membres de ses comités d'études et des Comités nationaux de la CEI, pour tout préjudice causé en cas de dommages corporels et matériels, ou de tout autre dommage de quelque nature que ce soit, directe ou indirecte, ou pour supporter les coûts (y compris les frais de justice) et les dépenses découlant de la publication ou de l'utilisation de cette Publication de la CEI ou de toute autre Publication de la CEI, ou au crédit qui lui est accordé.

8) L'attention est attirée sur les références normatives citées dans cette publication. L'utilisation de publications référencées est obligatoire pour une application correcte de la présente publication.

9) L’attention est attirée sur le fait que certains des éléments de la présente Publication de la CEI peuvent faire l’objet de droits de brevet. La CEI ne saurait être tenue pour responsable de ne pas avoir identifié de tels droits de brevets et de ne pas avoir signalé leur existence.

La Norme internationale CEI 62381 a été établie par le sous-comité 65E: Les dispositifs et leur intégration dans les systèmes de l'entreprise, du comité d'études 65 de la CEI: Mesure, commande et automation dans les processus industriels.

Cette deuxième édition annule et remplace la première édition parue en 2006. Elle constitue une révision technique.

Les principales modifications par rapport à l'édition précédente sont les suivantes:

– La définition des documents mentionnés dans la présente norme est conforme à la future CEI 627081.

___________ 1 A publier.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 12: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

– 44 – 62381 © CEI:2012

Le texte de cette norme est issu des documents suivants:

FDIS Rapport de vote

65E/222/FDIS 65E/227/RVD

Le rapport de vote indiqué dans le tableau ci-dessus donne toute information sur le vote ayant abouti à l'approbation de cette norme.

Cette publication a été rédigée selon les Directives ISO/CEI, Partie 2.

Le comité a décidé que le contenu de cette publication ne sera pas modifié avant la date de stabilité indiquée sur le site web de la CEI sous "http://webstore.iec.ch" dans les données relatives à la publication recherchée. A cette date, la publication sera

• reconduite, • supprimée, • remplacée par une édition révisée, ou • amendée.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 13: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

62381 © CEI:2012 – 45 –

INTRODUCTION

Il est courant, dans les processus industriels continus, de raccourcir le temps d'exécution d'un projet. En même temps, les systèmes d'automatisation sont de plus en plus complexes, en raison du nombre de systèmes connectés et de l'utilisation de nouvelles technologies (les systèmes de bus de terrain, par exemple).

L'expérience a démontré que le propriétaire, le prestataire et le fournisseur ont eu de longues concertations afin de définir sans ambigüité le domaine d'application des activités et les responsabilités et afin de finaliser la livraison et l'acceptation des systèmes d'automatisation dans les délais prévus.

La présente norme vise à améliorer et accélérer la phase de négociation et à aboutir à une compréhension mutuelle du domaine d'activité de chacune des parties.

Les annexes de la présente norme contiennent des formulaires qui peuvent être utilisés dans les procédures d'essai. Les acheteurs de la présente norme peuvent copier les formulaires pour leur propre usage uniquement dans la quantité requise.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 14: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

– 46 – 62381 © CEI:2012

SYSTÈMES D'AUTOMATISATION POUR LES PROCÉDÉS INDUSTRIELS – ESSAIS D'ACCEPTATION EN USINE (FAT), ESSAIS D'ACCEPTATION

SUR SITE (SAT) ET ESSAIS D'INTÉGRATION SUR SITE (SIT)

1 Domaine d'application

La présente Norme internationale définit les procédures et spécifications des essais d'acceptation en usine (FAT), des essais d'acceptation sur site (SAT) et des essais d'intégration sur site (SIT). Ces essais sont réalisés pour démontrer la conformité du système d'automatisation à la spécification.

Les activités de conception et de fabrication préalables à ces essais ne sont pas couvertes par la présente norme.

Il convient, pour une utilisation dans l'industrie pharmaceutique ou dans d'autres industries hautement spécialisées, que des directives (par exemple, Guide pour la validation des systèmes automatisés en milieu pharmaceutique (GAMP2), ainsi que des définitions et dispositions complémentaires s'appliquent conformément aux normes en vigueur, par exemple, pour la conformité aux bonnes pratiques de fabrication (BPF), la norme 21 CFR (FDA) et la Procédure normalisée d'exploitation (PNE) de l'Agence européenne des médicaments (SOP/INSP/2003).

La description des activités détaillées dans la présente norme peut être considérée comme une ligne directrice et être adaptée aux exigences spécifiques du processus, de l'usine ou de l'équipement. Une séquence type d'activités et d'événements est présentée dans la Figure 1, et leurs relations sont explicitées dans les Figures 2 et 3.

___________ 2 GAMP = Good-Automated Manufacturing Practice

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 15: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

62381 © CEI:2012 – 47 –

NO

TE

Le c

ontr

ôle

de b

oucl

e pe

ut e

ffect

ivem

ent ê

tre

lanc

é lo

rs d

e la

pha

se d

e co

nstr

uctio

n, u

ne fo

is l'

infr

astr

uctu

re r

equi

se in

stal

lée.

Figu

re 1

– S

chém

a dé

criv

ant

la s

éque

nce

type

d'é

véne

men

ts F

AT,

SA

T et

SIT

rel

ativ

e au

x ét

apes

dét

erm

inan

tes

du p

roje

t

Con

ditio

ns p

réal

able

s au

FA

T

- Lo

gici

el c

ompl

et

- S

ystè

me

conn

ecté

-

Ess

ai in

tern

e du

fou

rnis

seur

term

iné

Con

ditio

ns p

réal

able

s au

SA

T -

Livr

aiso

n du

sys

tèm

e su

r si

te

- In

stal

latio

n co

rrec

te

- D

émar

rage

du

syst

ème

Con

ditio

ns p

réal

able

s au

SIT

-

Sys

tèm

es

corr

ecte

men

t co

nnec

tés

- S

AT

term

iné

Con

stru

ctio

n R

ecet

te p

rovi

soir

e

Con

trôl

e en

bou

cle

Ach

èvem

ent

méc

aniq

ue

Dém

arra

ge

Mis

e en

œuv

re à

fro

id

Mis

e en

œuv

re à

cha

ud

Mis

e en

ser

vice

ES

D

DC

S

FAT

ES

D

DC

S

SA

T

ES

D/D

CS

SIT

Ach

èvem

ent

du s

ystè

me

de c

ontr

ôle

de

proc

essu

s

IEC

1

36/1

2

Thi

s is

a p

revi

ew o

f "IE

C 6

2381

Ed.

2.0

b:..

.". C

lick

here

to p

urch

ase

the

full

vers

ion

from

the

AN

SI s

tore

.T

his

is a

pre

view

of "

IEC

623

81 E

d. 2

.0 b

:..."

. Clic

k he

re to

pur

chas

e th

e fu

ll ve

rsio

n fr

om th

e A

NS

I sto

re.

Thi

s is

a p

revi

ew o

f "IE

C 6

2381

Ed.

2.0

b:..

.". C

lick

here

to p

urch

ase

the

full

vers

ion

from

the

AN

SI s

tore

.T

his

is a

pre

view

of "

IEC

623

81 E

d. 2

.0 b

:..."

. Clic

k he

re to

pur

chas

e th

e fu

ll ve

rsio

n fr

om th

e A

NS

I sto

re.

Page 16: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

– 48 – 62381 © CEI:2012

DCS Sous-système 1

Sous-système n

SAT du système Communication SIT

IEC 137/12

Figure 2 – Schéma décrivant les relations du SAT et du SIT entre le DCS et les sous-systèmes

DCS type

Niveau de l'opérateur

Niveau du processus

E/S en rack

Dispositif de terrain Hart, etc.

Processus

Contrôle en boucle Contrôle en boucle Contrôle en boucle

Ess

ai d

e câ

blag

e

Ess

ai d

e câ

blag

e

Ess

ai d

e câ

blag

e

FAT SAT

FAT ou SAT/SIT partiel

E/S distantes

Bus de terrain

Dispositif de bus de terrain

FAT SAT

IEC 138/12

Figure 3 – Schéma décrivant les relations entre le FAT, le SAT et le SIT aux niveaux appropriés de l'usine

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.

Page 17: Edition 2.0 2012-02 INTERNATIONAL STANDARD NORME ...ed2.0… · International Standard IEC 62381 has been prepared by subcommittee 65E: Devices and integration in enterprise systems,

62381 © CEI:2012 – 49 –

2 Références normatives

Les documents de référence suivants sont indispensables pour l'application du présent document. Pour les références datées, seule l'édition citée s'applique. Pour les références non datées, la dernière édition du document de référence s'applique (y compris les éventuels amendements).

Aucunnes

3 Termes, définitions et abréviations

3.1 Termes et définitions

Pour les besoins du présent document, les termes et définitions suivants s'appliquent.

3.1.1 système d'automatisation système DCS ou PLC de surveillance et de contrôle du site de production dans les processus industriels, y compris les systèmes de contrôle reposant sur des technologies de bus de terrain

3.1.2 balise descripteur alphanumérique univoque qui identifie un capteur ou un actionneur

3.1.3 essai d'acceptation en usine activité visant à démontrer que le système du fournisseur et les autres systèmes fournis sont conformes à la spécification

3.1.4 essai d'acceptation sur site activité visant à démontrer que l'installation des différents systèmes du fournisseur est conforme aux spécifications applicables et aux instructions d'installation

3.1.5 essai d'intégration sur site activité visant à démontrer que la fusion des différents systèmes en un seul système global est terminée et que tous les composants fonctionnent ensemble comme prévu

3.1.6 acheteur entreprise fonctionnellement responsable du système d'automatisation acheté au fournisseur, c'est-à-dire le propriétaire ou le prestataire

3.1.7 propriétaire entreprise ayant engagé un prestataire pour concevoir une usine de produits chimiques, pétrochimiques, etc.

3.1.8 prestataire entreprise engagée par le propriétaire pour concevoir et construire une usine de produits chimiques, pétrochimiques, etc.

NOTE La fonction de prestataire peut être assurée par le propriétaire.

This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.This is a preview of "IEC 62381 Ed. 2.0 b:...". Click here to purchase the full version from the ANSI store.