D’Auteuil (Port of Sept-Iles)

download D’Auteuil (Port of Sept-Iles)

of 19

Transcript of D’Auteuil (Port of Sept-Iles)

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    1/19

    Iron Ore Short Course

    St-Johns, NL, October 31, 2012

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    2/19

    Portrait of the Port of Sept-les

    Strategically located at the entrance of the St. Lawrence Great Lakes gateway and doorway to the hinterland forsupplies (Northern Qubec & Labrador)

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    3/19

    Portrait of the Port of Sept-les

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    4/19

    Portrait of the Port of Sept-les

    Port of importance in the network of strategic ports of the Politique maritime et fluviale du Qubec (MTQ) andthe Continental Gateway strategy of Canada

    Iron ore handling port in North America

    Largest aluminum handling in America

    First port in North America - Green Marine

    environmental program

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    5/19

    Main Characteristics

    30 M t

    600 ships

    85% exported, 15% imported Can accommodate the largest bulk carriers in North

    America

    Short-sea shipping know how:

    o Aluminum (Alouette Spirit barge)

    o Rail cargo (rail-car ferry)

    Connected to the north shore rail and CN

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    6/19

    Main CharacteristicsEconomic and Social Reach $1 billion in annual economic spin-offs

    Generates close to 4,000 direct and indirect jobs

    Contributes financially to over 45 regional communityorganisations

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    7/19

    Port of Sept-les Boundaries

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    8/19

    Port Facilities City Sector

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    9/19

    Port Facilities Pointe-Noire Sector

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    10/19

    Cruise Ship Dock($21 M) OptimisationPointe-Noire Terminal($9 M)

    CLM Construction

    Site ( over $170 M)

    Pointe-Noire Terminal($10 M)

    Optimisation (1 + 2)

    La Relance Terminal($30 M + $14 M)

    Close to a Quarter of a Billion DollarsInvested Over the Last Two Years

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    11/19

    ARCELOR MITTALMINES CANADA

    (15 MT)

    LABRADOR IRONMINES (6 MT)

    CLIFFS QUBEC(8 MT)

    NEW MILLENNIUM

    (4 + 22 MT)

    COMPAGNIE MINIREIOC (17 MT)

    CHAMPION MINERALS

    (8 MT)

    CLIFFS NATURALRESOURCES MINES

    WABUSH (5 MT)

    ALDERON RESOURCE CORP.(8 MT)

    CENTURY IRONMINES (26 MT)

    ADRIANA

    RESOURCES.(50 MT)

    Location of Iron Ore Mining Sites (Qubec & Labrador)

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    12/19

    19.7 17.0 21.025.0 28.0 30.0 30.0 30.0 30.0

    6.012.0

    16.0 16.0

    32.0 32.0 32.0

    5.0 5.0 5.0

    15.0 20.026.0

    8.08.0

    8.0

    20.0

    29.0

    10.0

    10.0

    10.025.0

    50.0

    -

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    2010 2011 2012 2013 2014 2015 2016 2017 2018 et futures

    Volume(millionsdetonnes)

    Clients actuels et autresCLM LIM TATA/NML ALDERON CENTURY CHAMPION ADRIANA

    Total Projected Iron Ore Production Transported to Sept-les

    Port Metro Vancouver

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    13/19

    Multi-user Dock

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    14/19

    Multi-User Dock

    Dedicated to the expedition of iron ore on a multi-userbasis

    Construction in phases :

    o Phase 1: 50 MT; $220 M

    o Phase 2: 50 MT

    Total: 100 MT World class standard

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    15/19

    Multi-User Dock

    Concrete dock on steel piles filled with concrete

    o Trestle: 560m long 15m wide

    o Dock: 425m long 21 m wide

    o # 36 (rear): -16.5m* depth

    o # 35 (front): -20.7m* depth

    Capacity available to increase each section of dock to-20.7m and/or -25.3m* if needed

    2 shiploaders of 8000 tph each

    * zero tide

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    16/19

    Schedule

    Key Construction Dates

    Dredging begins Completed

    Shiploader procurement Completed

    Structure & civil works begin October 2012

    Conveyor procurement February 2013

    End of construction March 2014

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    17/19

    Mobilisation

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    18/19

    Civil works - cofferdam

  • 7/27/2019 DAuteuil (Port of Sept-Iles)

    19/19

    In Conclusion

    Growing rapidly

    unprecedented investment =$750 million (2010-2015).

    Next ten years - booming iron ore market increase 200 M t / yr - making it the largest port in Canada

    Well underway - construction of world-class portinfrastructure

    The Port of Sept-les is definitely

    a strategic key asset for Eastern Canada.