CV Muhammad Afi Hassan 2015

download CV Muhammad Afi Hassan 2015

of 13

  • date post

    13-Apr-2017
  • Category

    Documents

  • view

    156
  • download

    0

Embed Size (px)

Transcript of CV Muhammad Afi Hassan 2015

  • RESUME MUHAMMAD AFI BIN HASSAN

    1

    MUHAMMAD AFI BIN HASSAN No 14, Jalan Asli 8,

    Taman Pasir Putih,

    81700 Pasir Gudang.

    Johor Darul Taazim

    Email :muhdafi_88@yahoo.com

    OBJECTIVE

    A mechanical position with diploma in Mechanical Engineering in Manufacturing. As a

    QC Inspector to make quality is the BEST in the part of your live!. And to gain more

    experience and learn a new skills.

    PERSONAL PARTICULARS

    Gender : Male

    I/C No : 880910-23-5617

    Date of birth : 10 September 1988

    Age : 27 years old

    Place of birthday : Hospital Sultanah Aminah Johor Bharu

    Marital Status : Married

    Health : Good Health

    Nationality : Malaysia

    Interest : Adventure Game

    Phone : 017-7685696

    EDUCATION

    1) Jan 2006 - Dis 2009 Politeknik Johor Bahru, Diploma in Mechanical Engineering

    Pasir Gudang, Johor (Manufacturing).

    2) 2004 2005 Sek. Men. Teknik Muar, Grade in Sijil Pelajaran Malaysia

    Muar,Johor (SPM).

    mailto:muhdafi_88@yahoo.com

  • RESUME MUHAMMAD AFI BIN HASSAN

    2

    ATTENDED COURSE

    1) June 2012 Johor Skill Development Center Welding Inspector (CSWIP 3.1)

    (PUSPATRI)

    2) April 2010 Johor Skill Development Center Welding Inspector (PCN Level 2)

    (PUSPATRI)

    WORK EXPERIENCE

    1) Company Name : Flextronics (Penang) Sdn Bhd Position Title : QA Asst Engineer (Assembly)

    Industry : Manufacturing

    Date Joined : June 2014 ~ Present

    DUTIES AND RESPONSIBILITIES

    To ensure and monitor Qc Inspector (IPQC & OQA) carry out activity during and after assembly

    Ensure production follow spec as a client requirement Prepare release package for each new model including result for each testing. Prepare checklist for Qc Inspector (IPQC & OQA) for their inspections referenced. Prepare QSI (Quality Standard Inspection) for each models including Sub-Assembly

    and Main Assembly.

    Ensure incoming part in spec and no reject issues (painting and molding) Prepare Quality Alert for reference Trainer and Production especially operator to

    follow the sequence that Engineer Process provided.

    Ensure jig or tools for testing are in good condition and inspect as follow requirement from client.

    Prepare documentation for all finding either from client or internal and come out with a methods.

    Ensure zero market claims.

  • RESUME MUHAMMAD AFI BIN HASSAN

    3

    2) Company Name : Seagull Engineering Sdn Bhd. Position Title : QA/QC Inspector (WELDING)

    Industry : Oil & Gas Fabrication

    Date Joined : August 2010 ~ Febuary 2014

    DUTIES AND RESPONSIBILITIES

    To carry out all QC Inspection in welding activities as directed by QC Head or

    Manager in accordance with companys QA/QC procedures.

    To carry out all inspection receiving material before production.

    To ensure and monitor welding activity during fabrication and visual after welding.

    To ensure and follow up the welding sequence.

    To perform all QC/Welding inspection of the works at site / shop as required.

    To coordinate with NDT team or subcontractor to perform NDT timely and as per

    specification.

    To ensure that all fabrications work are performed to the quality as per specification.

    To ensure that all QC activities are performed timely with no delay to production.

    To perform any other duties that may be assigned to you by your superior /

    management from time to time.

    JOB RESPONSIBILITIES ( IN SEQUENCE )

    To interpreted fabrication drawing. (G.A., nozzle, internal, external detail).

    Perform material receiving inspection such as plate, flanges, forging, fitting, pipe,

    tube sheet (heat exchanger), baffle plate (heat exchanger).

    Ensure all the material appearance such as width, length, thickness, stamping @

    marking and heat number are available and comply with drawing

    Prepare line summary check list such as marking date, fit up inspection, visual after

    welding date and clarify the joint number in order to monitor the progress in

    workshop.

    Perform fit up inspection during pre-fabrication especially for longitude seam,

    circumference seam, flange to nozzle neck joint, pipe joint, nozzle to shell and

    attachment to pressure part joint. Ensure the alignment (hi-low), bevel preparation

    and gap as per drawing fabrication.

    Monitor welding activity during fabrication and make sure all the document is

    available and approved such as WPS and weld map before start the inspection.

    To monitor welding process such as SMAW, GTAW, FCAW, SAW and control the

    welder, To ensure that only qualified welder to perform welding work during

    production activity.

    Perform visual inspection after completed weld. Ensure that the reinforcement weld

    is achieved as per fabrication drawing. Also determine defect such as spatter,

    undercut, under fill and mark clearly so that remedial action can be taken.

    Coordinate with NDT department to perform examination such as PT, MT, and RT

    after welding completed and visual inspection satisfactory. In accordance to ITP to

    ensure the examination had performed to the specified joint.

    To understand the method of NDT and make sure it is done correctly.

    Review the NDT report and ensure it is tally with request and compile to the MDR.

  • RESUME MUHAMMAD AFI BIN HASSAN

    4

    Perform final inspection and final dimensional as a final inspection for QC inspector

    before proceed to PWHT or hydrostatic test.

    To coordinate with:

    QA engineer (in order to implement all the related procedures).

    Design Engineer (Technical wise, drawing).

    Production (material, schedule).

    Purchasing (mill certificate, P.O and D.O).

    PROJECT INVOLVED

    1. Year : September 2013 to Febuary 2014 Job Number : 7.13M004

    Client : TNB / Andritz / MMHE-ATB

    Project Involved : Ulu Jelai Hydroelectric (Steel Liner) Project

    Project in MMHE-ATB Snd Bhd

    2. Year : August 2013 to December 2013 Job Number : 7.13S002

    Client : PETRONAS / PROCESS GROUP / MMHE-ATB

    Project Involved : Petronas Skid Piping FLNG Project

    A-42-101- Producer Water Treatment Package

    A-42-102- Desanding Package

    Project in MMHE-ATB Snd Bhd

    3. Year : April 2013 to December 2013 Job Number : 7.12S052

    Client : PETRONAS / MHI / MMHE-ATB

    Project Involved : Sabah Ammonia Urea (SAMUR) Project

    C-58-41- Demi Waste Water Stripping Tower

    Project in MMHE-ATB Snd Bhd

    4. Year : December 2012 to December 2013 Job Number : 7.12M049

    Client : PETRONAS / MHI / MMHE-ATB

    Project Involved : Sabah Ammonia Urea (SAMUR) Project

    C-20-01- HP Scubber

    C-20-02- LP Scubber

    C-20-04- Stripper

    C-21-01- Process Condensate

    C-37-01- Stripping Tower

    Project in MMHE-ATB Snd Bhd

  • RESUME MUHAMMAD AFI BIN HASSAN

    5

    5. Year : December 2012 to December 2013 Job Number : 7.12M050

    Client : PETRONAS / MHI / MMHE-ATB

    Project Involved : Sabah Ammonia Urea (SAMUR) Project

    V-16-02- Syn 2nd

    Intercooler Separator

    V-16-03- Syn Gas After Separator

    V-18-01- Ammonia Separator

    V-18-04- Purge Gas Separator

    Project in MMHE-ATB Snd Bhd

    6. Year : June 2012 to December 2012 Job Number : 7.12M039Q

    Client : PETROFAC / MMHE-ATB

    Project Involved : Cendor Phase 2 FPSO Project for PETROFAC

    V4101-Hot Oil Expansion Vessel

    V4102-Hot Oil Drain Down Vessel

    V4301-Fuel Gas Discharge Scrubber

    A2001/2002-V01- 1st stage Suction Scrubber Train 1

    A2001/2002-V02- 2nd stage Suction Scrubber Train 2

    Project in MMHE-ATB Snd Bhd

    7. Year : July 2012 to November 2012 Job Number : 7.11M035L

    Client : PETROFAC / MMHE-ATB

    Project Involved : Cendor Phase 2 FPSO Project for PETROFAC

    E1001-Inlet Heater

    E1002-Interstage Heater

    Project in MMHE-ATB Snd Bhd

    8. Year : Sept 2012 to November 2012 Job Number : 7.12M041S

    Client : PETROFAC / MMHE-ATB

    Project Involved : Cendor Phase 2 FPSO Project for PETROFAC

    LP FWS Pig Receiver 4 set

    (V1004, V1005, V1006 & V1007)

    Project in MMHE-ATB Snd Bhd

    9. Year : July 2012 to October 2012 Job Number : 7.12S042T

    Client : PETROFAC / MMHE-ATB

    Project Involv