4520121017148970000_030412_5 Spatial Data - GIS .pdf

download 4520121017148970000_030412_5 Spatial Data - GIS .pdf

of 10

Transcript of 4520121017148970000_030412_5 Spatial Data - GIS .pdf

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    1/10

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    2/10

    5

    :

    .

    .

    .

    ) (

    :

    .

    : (

    .)

    .

    ) (

    .1

    .2

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    3/10

    .3

    .4

    :

    . .

    .

    } {

    ) (

    .

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    4/10

    .5

    :

    ) (

    ) (

    .

    ) (

    .

    . .

    .

    ) - - (

    .

    .

    .

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    5/10

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    6/10

    New Plot Demarcation Procedures

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    7/10

    Provisional Demarcation, Demarcation of Plot Corners or Showing

    Plot Locations to the Owner.1.

    2. Demarcation for Construction

    The ollowing actions are permitted once a Provisional Certifcate is issued:

    Conducting soil test only Construction o ence or temporary plot (Al Faya Indust., Ranches, SeaRest Houses)

    Construction not allowedIssuing o Provisional Demarcation Certifcate

    Demarcation o plot corners with high accuracy and not less than 5 cm

    using modern instruments and surveying techniques, and handing over

    reduced level height or gate level purpose.

    The ollowing actions are permitted ater issuing the Demarcation Certifcate

    or construction:

    Temporary ence fxing Issuing o building permits Construction allowed

    Issuing o Demarcation Certifcate or Construction Purpose

    1

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    8/10

    It will be carried out at tie beam stage

    Checking the lay-out o building Checking gate level height Checking i the construction is inside the boundary which

    was handed over in case o commercial buildings.

    Issuing o Field Survey Report

    Lay Out of Building and Gate Level Checking

    Checking of Boundary Wall Demarcation or Any Construction Near

    the Boundary of the Plot

    3.

    4.

    In case of villa construction or any building has a compound wall

    When the contractor starts construction o the boundary wall or any building

    near/adjacent to the boundary wall, they should get a certifcate confrming

    that they are not exceeding plot boundary limits at the tie beam stage and

    beore they start the concrete work.

    Issuing o Field Survey Report

    2

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    9/10

    For completion certifcate purpose,survey o boundary wall in case o villa orsurvey o outside limit o building in case o commercial and tower buildings.

    I the contractor constructs outside the provided boundary which washanded over previously, then a fne is to be paid and sets back the build up

    to its original permitted limits.

    Final building height should be equivalent to the approved designedheight.

    Issuing o Final Survey Certifcate

    Final Survey Certicate5.

    When applying or a plot demarcation, the Consultant and the Contractor shouldnominate their representative engineers or plot demarcation. Names along withmobile numbers should be specifed on the request orm.

    The site engineer (surveyor, civil eng., architect) representing Contractor andConsultant, should be attending the demarcation process and receiving themarks on site.

    The surveyor will veriy the site engineers identity. The Contractor andConsultant representatives should present ID cards to the surveyor.

    The Demarcation Certifcate will be issued on the second day rom demarcationi there are no conicts.

    The issued Demarcation Certifcate should be signed only by the representativeengineers as per the application and attending the process o demarcation onsite. Only to the nominated representative Demarcation Certifcate will be issued.

    I there is any discrepancy between Demarcated Plot and constructed

    compound wall, building or approved engineering design (gate level and fnallevel), the Contractor should correct these discrepancies beore commencingthe work.

    I any discrepancies appear during the issuing o the fnal survey certifcate, theContractor should pay the cost o these discrepancies as well as corrections costs.

    Field report will be issued only when tie beams are prepared or all plot corners

    General Conditions and Requirements

    3

  • 7/29/2019 4520121017148970000_030412_5 Spatial Data - GIS .pdf

    10/10